ML20246G208

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/89-16 on 890327-31 & Notice of Violation.Status of Items Previously Identified Noted in Paragraph 2 of Rept
ML20246G208
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/02/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20246G210 List:
References
NUDOCS 8905150220
Download: ML20246G208 (2)


See also: IR 05000458/1989016

Text

'

w

c . ..

'

MAY - 2 1989

'

-

is

'In Reply Refer To:

Docket: 50-458/89-16

!

Gulf States Utilities i

ATTN: Mr. James C. Deddens

Senior Vice President (RBNG)

P.O. Box 220

St. Francisville, Louisiana 70775  !

Gentlemen:

This refers to.the inspection conducted by Messrs. R. C. Stewart and I. Barnes

of this office during the period March 27-31, 1989, of activities authorized by

NRC Operating License NPF-47 for River Bend Station, and to the discussion of

our findings with you and other members of your staff at the conclusion of the j

inspection.

,

Areas examined during the inspection included the inservice testing program for.

pumps and valves, and followup on service water corrosion problems. Within this-

area, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspector. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in -

violation of NRC requirements. Consequently, you are required to respond to

the violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

1

We have also examined actions you have taken with regard to previously l

identified inspection findings. The status of these items is identified in ,

paragraph 2 of the enclosed report.

]

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.  !

Should you have any questions concerning this inspection, we will be pleased to l

discuss them with you. 1

1

Sincerely,

L. J. Callan, Director

Division of Reactor Projects

\

Enclosures: (see next page)

RIV:RI 'G3 C:MQPSqfj 0$ D:DRP '

RCStewart/cjg IBarnes J Nilhoa LJCallan

I// /89 r /)/89 's

./[//89 f/2./89 [

890515o220 890502

PDR

,

ADOCK 05000458 }

O PDC

_ _

x _ . -

. ------_-,;---

, _ _ _ _ _ _,

- -;-_- _.-_- _-

_- - - . _ _ - _ _ _ - _ - - - _

_

p, < ,

f;s  : ;- .,

.. ._

t

.lJi ' '

-

4

P IGulflStates Utilities -2-

,

Enclosures: . .

1. Appendix. A _- Notice of Violation

"

2. Appendix B - NRC Inspection-Report '

-

50-458/89-16 .

'

'cc'w/ enclosures:

Gulf States Utilities

ATTN: J..E.= Booker, Manager- 4-

River Bend Oversight

P.O. Box 2951'

. Beaumont,' Texas. 77704

-

Gulf States Utilities"-

ATTN:' Les England, Director .

Nuclear Licensing.- RBNG. ,

P.O. Box.220'

St. Francisville, Louisiana .70775'-

Louisiana: State University,

Government Documents Department

' Louis,iana-Radiation Control Program Director

-

'

bce'to DMB (IE01) -

bcc distrib. by'RIV:

  • DRP ' *RRI

=*R. D. Martin; RA *SectionChief;(DRP/C)_.

VF Lisa Shea, RM/ALF- . *MIS System

  • RPB-DRSS^ ' *RSTS Operator
  • Project' Engineer,'DRP/C .
  • RIV File-

n 'W.Paulson,NRRProjectManager~(MS:

  • 13-D-18)-

!*DRS (2; copies) *I. Barnes

  • R. Stewart

'

, *w/766

.i

)

-_-_ - _ - __ w