Grants Waiver to Tech Spec 6.9.1.7 Reporting Requirements Re Cycle 7 Core Surveillance Rept
ML20246D226
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/04/1989
From: Engle L
Office of Nuclear Reactor Regulation
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8905100165
Download: ML20246D226 (3)


Text

. _.

,8 UNITED STATES f

g NUCL EAR REGULATORY COMMISSION 7.

j WASHINGTON, D. C. 20655 May 4, 1989

%%,*..../e Docket No. 50-339 Mr. W. R. Cartwright Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060

Dear Mr. Cartwright:

SUBJECT:

NORTH ANNA UNIT 2 (NA-2) - CYCLE CORE SURVEILLANCE REPORT The NA-2 Technical Specification (TS) 6.9.1.7 requires a Core Surveillance Report be provided to the NRC 60 days prior to cycle criticality unless a written waiver is granted by the NRC staff.

By letter dated February 17, 1989, the licensee indicated that the 60-day advance submittal requirement be waived by the NRC for the following reasons.

Because of delays in the restart of the Surry units and system load demands, NA-2 operated beyond the burnup range used for the initial Cycle 7 reload core design.

The Cycle 7 core was then redesigned following the completion of Cycle 6 operation to facilitate use of actual Cycle 6 burnu) information.

The time required for the redesign of the Cycle 7 reload core tien made it impossible to meet the 60-day advance submittal requirement of TS 6.9.1.7 prior to Cycle 7 initial criticality.

Therefore, in accordance with the TS 6.9.1.7 reporting provision, the licensee requested the 60-day advance submittal requirement be waived by the NRC, and alternately, the licensee proposed to submit the required Core Surveillance Report by March 15, 1989.

By letter dated March 15, 1989 the licensee submitted the required Cycle 7 Core Surveillance Report for NA-2.

The Cycle 7 reload core was analyzed in accordance with the methodology documented in the approved Topical Report VEP-FRD-42, Revision 1-A, " Reload Nuclear Design Methodology," using NRC-approved codes as referenced in the Topical Report. The information in the NA-2 Core Surveillance Report was developed in accordance with the licensee Topical Report VEP-NE-1-A,

" Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications." The results of the analyses indicated that no key analysis parameters would become more limiting during Cycle 7 operation than the values assumed in the currently applicable NA-2 safety analyses...The Core Surveillance Report consists of the NA-2 Cycle 7 N(z) function and the axial flux difference limits, which are based upon the currently-approved total peaking factor (F ) limit of 2.19.

j q

8905100165 890504 I

DR ADOCK 05000339 PDC I

/

1

Mr. W. R. Cartwright May 4, 1989 Therefore, based on the above, the staff finds the NA-2 Cycle 7 Core Surveillance Report to be acceptable and a waiver is hereby granted to the NA-2 TS 6.9.1.7 reporting requirements.

Sincerely, Original signed by Leon B. Engle, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION Docket File a NRC & LPDRs PD22 Reading HBerkow SVarga,14/E/4 Glainas,14/H/3 DMiller LEngle OGC EJordan, MNBB-3302 BGrimes,9/A/2 ACRS(10)

Pfredrickson, RII

[ LETTER /NORTHANNAUNIT2]

L69p P.

D:'kh$)

1 DFW er LEng e/jd HBeik6w 05/ L'/89 05/ 4 /89

'05/j/89 i

0F?I i

t i

Mr. W. R. Cartwright North Anna Power Station Virginia Electric & Power Company Units 1 and 2 cc:

Mr. William C. Porter, Jr.

C. M. G. Bu ttery, M.D., M. P.H.

County Administrator Department of Health Louisa County 109 Governor Street P.O. Box 160 Richnend, Virginia 23219 Louisa, Virginia 23093 Regional Administrator, Region II Michael W. Maupin, Esq.

U.S. Nuclear Regulatory Connission Hunton and Williams 101 Marietta Street N.W., Suite 2900 P. O. Box 1535.

Atlanta, Georgia 30323 Richmond, Virginia 23212 1

Mr. W. T. Lough l

Virginia Corporation Comission Mr. G. E. Kane f

Division of Energy Regulation P. O. Box 402.

l P. O. Box 1197 Mineral, Virginia 23117 l

Richmond, Virginia 23209 j

1 Old Dominion Electric Cooperative c/o Executive Vice President

  • l Innsbrook Corporate Center 4222 Cox Road, Suite 102 Glen Allen, Virginia 23060 Mr. W. L. Stewart Senior Vice President - Power Virginia Electric and Power Co.

Post Office Box 26666 i

Richmond, Virginia 23261 Mr. Patrick A. O' Hare Office of the Attorney General I

Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Resident Inspector / North Anna c/o U.S. NRC Senior Resident Inspector Route 2, Box 78 Mineral, Virginia 23117 l

I l

_