ML20246C035

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-352/89-10 & 50-353/89-16 on 890423-0528 & Notice of Violation
ML20246C035
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/30/1989
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20246C039 List:
References
NUDOCS 8907100224
Download: ML20246C035 (3)


See also: IR 05000352/1989010

Text

_-

-

._

_

__.

_ _ _

_

_ _ _ - _ _ _ _ _ _ _ _ ---

7

.

lljf;

f

6

d

20 JUN 188w

,

,

[

i

l

Docket Nos. 50-352

1

50-353

. Philadelphia Electric Company

ATTN: Mr. C.~ A. McNeill

l

Executive Vice President-Nuclear

Correspondence Control Desk

j

j

'P.O.-Box 7520

1

. Philadelphia,. Pennsylvania 19101

1

Gentlemen:

Subject:

Inspection No. 50-352/89-10 and 50-353/89-16

This' letter transmits the routine resident safety inspection.by Messrs.

T. Kenny, L. . Scholl, R. Fuhrmeister and Ms. M. Evans from April 23 - May 28,-

1989 at the' Limerick Generating Station, Limerick, Pennsylvania. . Region I

inspectors J. . Williams and C. Woodard also participated in this inspection.

The inspection consisted of do wment reviews, interviews, and observation of

activities. The results have been discussed with Mr. Martin McCormick, Jr. of

your staff.

Based on our inspection, apparent violations of procedures occurred during the

performance of several activities.

In addition, apparent violations of 10 CFR 50, Appendix B, Criterion X, " Inspection", have also been identified as a

result.of the NRC Independent Design and Construction Assessment corrective

action inspection (Report.No. 50-353/89-200).

These apparent violations have

been categorized by severity level according to 10 CFR Part 2, Appendix C

(Enforcement Policy). You are required to respond to these violations and in

preparing your response you should follow the instructions in Appendix A and B.

u

I-

These issues indicate that increased management attention and first line

supervision is warranted to ensure that activities are properly conducted.

In

addition this appears to be a repeat of a violation identified in NRC Report

No. 50-352/89-09.

In accordance with 10 CFR 2.79(a), a copy of this letter and the enclosures

will be placed in the Public Document Room. The response directed by this

letter and the accompanying notice are not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980,-PL 96-511.

OFFICIAL RECORD COPY

CIR LIM 89-10/16 - 0001.0.0

06/30/89

f.

\\ t

8907100224 890630

/

-Q

PDC

y

hf

PDR

ADOCK 05000352

y

.

2___-__-----_

_ - . _ _ .

---

_

_

~>

,

Philadelphia Electric Company

-2-

80 JUN h

Your cooperation is appreciated.

Sincerely,

@ $$0NED EV

James C. Linville, Acting Chief

Projects Branch No. 2

'

Division of Reactor Projects

Enclosure:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Violation

3.

NRC Region I Inspection Report 50-352/89-10 and 50-353/89-16

cc w/ encl:

J. S. Kemper, Sr., Senior Vice President - Nuclear Construction

G. M. Leitch, Vice President - Limerick Generating Station

S. J. Kowalski, Vice President - Nuclear Engineering

D. R. Helwig, General Manager - Nuclear Services

M. J. McCormick, Jr. , Manager - Limerick Generating Station

W. T. Ullrich, Manager - Limerick Unit 2 Startup

A. S. MacAinsh, Manager - Limerick Quality Division

G. A. Hunger, Jr. , Director - Licensing Section

T. B. Conner, Jr. , Esquire

E. J. Bradley, Esquire, Assistant General Counsel

H. D. Honan, Branch Head - Nuclear Engineering Licensing

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

0FFICIAL RECORD COPY

CIR LIM 89-10/16 - 0002.0.0

06/30/89

-_

-

-

- - - - - - - - - _ _ _

'7 o

.

Philadelphia Electric Company

-3-

30 JUN 1989

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Linville, Section Chief, DRP

J. Durr, Branch Chief, DRS

SLO

J. DyerEDO Office

R. Clark, NRR Project Manager

T. Johnson, SRI, Peach Bottom

T. Kenny, SRI, Limerick

J. H. Williams, Project Engineer

E. Conner, Reactor Licensing / Risk Engineer

C. Woodard, Reactor Engineer, DRS

RI.:DRP

RI:DRP

Kenny /mk

Linville

6/f89

6/ 0/89

$

0FFICIAL RECORD COPY

CIR LIM 89-10/16 - 0002.1.0

06/30/89

-

- _ _ _ _ _ _ - -

. - -