Text
- - -_ - __ __-_ _
A
4
.
'
DOCUMENT CONTAINS
M 2i W
SAFEGUARDS INFORMATION
'
In Reply Refer To:
-
l-
Docket:
50-285/89-23
1
Omaha Public Power District
ATTN:
Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. A. B. Earnest of this office
during -the period May 8-10, 1989, of activities authorized by NRC Operating
_
License DPR-40 for the Fort Calhoun Station, and to the discussion of our
findings with you and members of your staff at the conclusion of the
inspection.
The inspection reviewed certain areas of your physical security program.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector.
The main purpose of this inspection was to
review the status of the problem areas identified in Inspection
Repor 50-285/89-10 conducted February 27 - March 3,1989.
The NRC inspector
also reviewed the implementation of your commitments discussed during the
enforcement meeting held at our office on April 12, 1989, and the additional
information in your letter dated April 20, 1989.
The areas inspected and the
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
The material enclosed herewith contains safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore,_the
material, with the exception'of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
8907050517 890121
ADOCK 05000285
O
PNU
!
!
Ik
.RIV:SEPS
C:SEPS
C:RPB
S
D: RP
(V D D
ABEarnest/tw
RJEverett
'3Murray
ABBeach
JMi'1hoan
/89
\\Q
/89
Q / /89
g /gg/89
Q $ /89
ENCI.0SURE CONTAINS
SAFEGUARDS INFORMATION
DOCUMENT CONTAINS
UPON SEPARATION THIS
i\\
SAFEGUARDS INFORMATION
PAGE IS DECONTROLLED
TS.)k
_-
_
i
.
.
.
a
'
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss:them with you.
Sincerely,
CI$/
,
J es L..Milhoan, Director
l
Division of Reactor Projects
<
Enclosu .
Appendix - NRC Inspection Report
50-285/89-23
'
cc w/ summary page only:
Fort Calhoun Station
ATTN:
W..G. Gates, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Nebraska Radiation Control Program Director
bec copy of entire report:
RIV Security File
P. A. Starcher, RSGB/NRR
R. D. Martin, RA
B. Beach, DRSS
Chief, RPB
Section Chief, SEPS:RPB
Security Inspector
Resident Inspector
SEPS:RPB File
G. F. Sanborn, EO
D. M. Crutchfield, NRR
bec copy of letter and inspection summary only w/766:
Lisa Shea, RM/ALF
Section Chief, DRP/B
RIV File
MIS
RSTS Operator
R. E. Hall, DRSS
Project Engineer, DRP/B
bec copy of letter and inspection summary only w/out 766:
DMB IE-04
ENCLOSURE CONTAINS
.
P. Milano, NRR Project Manager
SAFEGUARDS INFORMATI N
O
UPON SEPARATION DilS
PAGE IS DECONTROLLED
_ _ _ _ _ _ _ - - - -