ML20245J990
| ML20245J990 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/22/1988 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| Shared Package | |
| ML20245J994 | List: |
| References | |
| NUDOCS 8907030240 | |
| Download: ML20245J990 (2) | |
See also: IR 05000346/1988012
Text
r
_ _ _ _ _ _ _ _
_ - - -
'
o
n"
ICb
DCB
l
r
v
SEP 2 21988
C O.DS)
i *
3
e
Docket No. 50-346
Toledo Edison Company
ATTN: Mr. Donald Shelton
y
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
1
This refers to the special safety inspection conducted by
Messrs. J. McCormick-Barger, T. Barton and K. Ward, of this office from
May 4 through August 2, 1988, of activities at the Davis-Besse Nuclear
Power. Station authorized by Facility Operating License No. NPF-3 and
to the discussion of our findings with you and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
In addition we met with Mr; L. Ramsett and other members of your staff on
August 18, 1988, to discuss concerns that we had with the inappropriate
invalidation of several Potential Condition Adverse to Quality Reports and the
failure of QC management to effectively deal with the significant number of
discrepancies in Quality Control Instructions and the lack of compliance with
the QC inspector certification procedure. We are concerned with the attitude
exhibited in your quality organization regarding the acceptability of
procedural non-compliance. We will be discussing these matters further with
you during the September 26, 1988 Enforcement Conference concerning apparent
employment discrimination as described in inspection report 50-346/88027.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
!
"
8907030240 0B0922
.
Q/
DR
ADOCK 0500
6"
Lg
1
_ _ _ _ _ _ _ _ _ _ _ _
_
,
.
_
- - _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ - _ _ _ _ _ _ . _ - _ _ _ _ _ _ _ - _ _ _ _
'%
0
O
I, -
SEP 2 21988
'
Toledo Edison Company
2
-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Uk I ,
W
Edward G. Greennfaff, Directbr
,
Division of Reactor Projects
Enclosure:
Inspection Report
No.50-346/88012(DRP)
cc w/ enclosure:
L. Storz, Plant Manager
.DCD/DCB(RIDS)-
Licensing Fee Management Branch
Resident Inspector,.RIII
James W. Harris, State of Ohio
Robert M.-Quillin, Ohio
~
"
Department of Health
State of Ohio, Public .
Utilities Commission
I
_ - _ _ _ _ __ _ __ ___ _ ________ _