Proposed Tech Specs,Revising Action Requirement & Surveillance Requirements of Tech Spec 3/4.6.1.6 Re Containment Structural Integrity
ML20245J283
Person / Time
Site: Vogtle  
Issue date: 08/14/1989
From:
GEORGIA POWER CO.
To:
Shared Package
ML20245J280 List:
References
NUDOCS 8908170626
Download: ML20245J283 (15)


Text

. _ - _ - _ _ - _ _ _

ENcLosvRE 2 l

l CONTAINMENT $YSTEMS CONTAINMENT ST_RUCTURAL INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containmentkhall be maintained at a l

level consistent with the acceptance criteria in specification 4.6.1.6.

q APPLICABILITY: Modes 1, 2. 3, and 4.

ACTION:

g 4.

With the abnormal gradation indicated by the cond ions in Specification 4.6

.6.la.4. restore the containmen to the required level of integri or verify that containment integrity is j

maintained with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and perform an engineering evaluation of l

the containmen end provide a Special Report to the Comission within 15 days in accordance with Specification 6.9.2 or be in at least HOT

(

STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the I

tollowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

g3) b.

With the indicated abnonnal degradation of the ructural integrity other than ACTION a. at a level below the acce ance criteria of Specification 4.6.1.6 restore the containeen to the required level of integrity or verify that containment integrity is maintained

)

within 15 days; perform en engineering evaluation of the containment (6) and provide a Special Report to the Comission within 30 days in accordance with Specification 6.9.2 or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The provisions of Specification 3.0.4 are not applicable.

$ SURVEILLANCE REQUIREMENTS 4.6.1.6.

CONTAINMENT PRESTRESSING SYSTEM The structural integrity of the prestressing tendons of the containment 5 shall be demonstrated at the and of 1. 3. and 6 years following the initial containment vessel structural integrity test and at 5-year intervals thereafter. For combined inspections of two containment in a plant.

the inspection-schedule 2:'.: M :: shown in 444eehmeW=h Fg we.r.6-1 4.6.1.0.1 The adecuacy of prestressing fenes in tendons shall be demonstrated by:

{i N - e f f le s ll y W ill b e-P C f b f M ' CI IA " ' # 0 !* IA A " I N ER*M88Ef!8s88sb P

PDC

&'[L{ () alt b ~~ $ h

, (..-

Determining that a random'bu representative sample of at least a.

each have an ebserved 11 t-off force withTn the predic# invert tendons (

7 hoo and " " ~ wiem l

U) ff ted Itmits established for each tendon. For each subsequent inspection, one tendon from each group shall be kept unchanged to develop a history and to correlate the observed data. The procedure of inspection and the tendon acceptance criteria shall be as follows:

1.

If the suasured prestressing force of the selected tendon in a group lies above the prescribed lower limit, the lift-off test is considered to be a positive indication of the sample tendon's acceptability.

If the measured prestressing force of the selected tendon in a group 2.

lies between the prescribed lower limit and 905 of the prescribed lower limit, two tendons, one on each side of this tendon shall be checked for their prestressina forces. It the prestressing forces of these two tendons are above g55 of the prescribed lower limits for the tendons, all three tendons shall be restored to the required level of integrity, and the tendon group shall be considered as acceptable. It the sessured prestressing force of any two tendons falls below 955 of the prescribed lower limits of the tendons, additional lift-off testing shall be done to detect the The conditions shall be cause and extent of such occurrence.

considered as an indication of abnormal degradation of the containment structures.

INSERTJ 3.

If the measured prestressin force of any tendon lies below 905 of 1%

theg;rescribedlowerlimit.rh:d;f;;th:00f:

=;;. ti;, 4:t.:t : ::.dduh::1 lift-:ff 2;tt; :211 M d::: :: :: e d:t=':: th ::::: :nf ::t:0 Of :::h ::::r::::.

The condition shall be considered as an indication of abnormal

, degradation of the containment structure.

If the average of all measured prestressing forces for each group 4.

(correctedforaveragecondition)isfoundtobelessthanthe minimum required prestress level at anchorage location for that group, the condition shall be considered as abnormal degradation of the containment structure.

If from consecutive surveillance the measured prestressing forces 5.

for the same tendon or tendons in a group indicate a trend of prestress loss larger than expected and the resulting prestressing forces will be less than the minimus required for the group before the next scheduled surveillance, additional lift off testing shall be done so as to determine the cause and extent of such occurrence.

i The conditinn shall be considered as en indication of abnormal degradation at the containment structure.

VOCTLE Okl17,5 - 1 e 2

' Two hdib onc Orm eacI1fup, bll N Nk#3IMEW "I 0Ib 5

=

each //me / /y-offs are-per/dmec/ on Vnif 1 pte hy Vic 3 4 -1.

Dire fechn.she//At c/e/Msiked cn Ve// / each ;/rhe //t%sKs are pWfuer<d on m/f z pee Ryure

3. V/,

l-6.

Unless there is abnormal degradation of the containment vessel during the first three inspections, the sample po ule44cn for subsequent inspections shall include at least tendons 1 hoop, el

.:J: =:.

demay 1 inverte Performing tendon detensikng, inspections, and material tests on a b.

previously stressed tendon.. n : n :5 ; nt;. A randomly selected tendon

'- -- ' ---" shall be completely detensioned in oMar en identify broken or damaged wires and determining that over the entire length of the removed wire sample (which. shou 1d include the broken wire if so identified) that:

1.

The tendon wires are free of corrosion, cracks, and damage, and 2.

A minimum tensile strength off#,000 psi (guaranteed ultiente strength of the tendon material) exists for at least three wire samples (onefromeachendandoneatmid-length)cutfromeachremovedwire.

I shall be considered as an Failure to meet the requirements of 4.6.1.6.1<

inment structure.

indication of abnormal degradation of the conta f///SERTf.

~

c.

Terfe m bi ;end:n re;;;e ka t; :f th;= t:nd..; d;t:n; k s f;r I

d r ur :: 4:t: :i= h; :r th k nt f;rn k =1 = =rd: d S;;nt%: t: ::

padut:d nk:, e.Sh:nr S ;het =t t:[4=h: t:br:=: eith' t=

n:t:r,rit

d = :t th: :==:t=d

= = t: ;s: :e ;:=_=_."t tu:.

During retensioning of these n.._

^' " ' "^^^

tendons, the changes in lead and elongation should ha muured simultaneously at a minimum of three approximately equally spaced levels of force between zero and the seating torce. If the elongation corresponding to a specific load differs by more than 105 from that recorded during the installation, en investigation should be made to ensure that the difference is not related to wire failures or slip of wires in anchorages. This condition shall be considered as en indication of abnormal degradation of the containment structure.

d.

Verifying the OPULASH.1TY of the sheathing filler grease by assuring:

abe w t 1.

Thereareac(changesin a presence or physical appearance of the sheathing filler-grease luding the presence of free water.

exceed 55 of the not duct volume, when Amount of grease replaceinjected at :1M ef th; ;;nifk[ 2-t:1htun ;rn==.*-

2.

3.

Minimus grease coverage exists for the different parts of the anchorage system, 4..

During een ral visual examination of the containment exterior

surface,

' grease leakage that could affect containment integrity is nei preserst., and

@6r TLE GAJ175-1/2.

l 4

i

\\

1 5.

The chemical properties of the filler material are within the

')-

tolerance limits specified as follows:

Water Content 0-105 (by dry wt.)

I Chlorides 0 - 10 ppm L

Nitrates 0 - 10 ppm Sulfides 0 - 10 ppm Reserved Alkalinity. > 505 of the installed values (BaseNumbers)

/-

! " r c-

r
--d Failure to meet requirement of 4.6.1.6.1 shall be considered as an indication

)

of abnormal degradation of the containment structure.

/yggg7//

4.6.1.6.2 End Anchorages and Adjacent 4enece60. Surfaces. ",: :. ::: :.:: -"..

m_

._._m.__,

.m.

__m

......,...... t...

__<_.2.,

.....,.t...,.,

..............,...m..t...

_ a...

i.m___

..1.7_.

......1,........,

_,..,.,..2...,...-

.._2 6.

.a.....,

___,__2

......,a..

..;...................<....o.,,............__......-

...s..

J_

  • A,..

..AJ-_

_m.J L.

_2.

.J W__J._

X.........

,m

.............., _,.....,....... 2...u.......

6.

......s

....a

,.............L.33

...m......

.--.t.

v.............____ _ _ _ _.. -........,.... -. - -. - -... - - -- -- -

---a__-----

.-r

..t...

2,____..

t 2 <......

_2

.u.

..._n..

............a....,.,..s.....n.......,...,.....

.......,.....u.

.u..t.,

.u._

.._n.a..

_ u _....a S

condition shall be considered as an indication of abnormal degradation /5 Significa grease lestage, grease cap deformation or abnormal concreteof

]

containmentstrugure.

4.6.1.6.3 C sinant Muses 3. Surfaces The exterior surface of the containments hould be visually examined to detect areas of large spall, severe i

scaling, 0-cracking ' :: r:: ;' O n. . : ;;-;. ether surface 4

deterioration or disintegration, o grease leakage, each of which can be considered as, evidence of a,bnormal, agradation o,f st,ruc.tural integr.ity of the u.n-_

e,.

.t.

e.

centai,nmen. _ _....___ _._

m.

7....

......s.s.-...

g.

(G)

SIqniAcan/

e 9

l INSERT 1 an engineering investigation will be performed to determine the cause and extent of the occurrence.

INSERT 2 For Unit 1 only, perfoming tendon retensioning of detensioned tendons as close as possible to their observed or predicted lift-off force, whichever is greater but not to exceed a stress level of 70% of the guaranteed ultimate tensile strength (GUTS) for the tendon material.

INSERT 3 a pressure not to exceed the designers specifications.

INSERT 4 The structural integrity of the end anchorages of all tendons inspected pursuant to Specification 4.6.1.6.1 and the adjacent surfaces shall be demonstrated by detemining through visual inspection that no apparent changes have occurred.

a.

All end anchorages including anchor blocks, wedges, shims and bearing plates: inspect for moisture, corrosion and cracks and for warping of bearing plates.

b.

Concrete surfaces adjacent to hoop tendon anchorages: inspect for-moisture, corrosion, distortion and cracking.

I c.

Steel plating surrounding the inverted-U tendon anchorages:

inspect for moisture, corrosion, distortion and cracking, f

/

)V

~*

l4 e,

[o Me en, r

7 w.

  1. YE 4

df n

f c

t M

n o

S s

'r S

d e

I f* /

R n

A a

?A a4

/

e bf e

E t

r Y

r e

e n

c

+

ef c

yV i

n S

T r

.o

/a N G, o

R N

if nd A

E so

n. o n

/p 3Y Y N

sd

^_

t 6

/

'e E

ce b

i f

c' I

ao

_r

/u t)l A

h er o

r T

T ht a

u se N

N ce 2ho

- M ry srsL 2

t M)

O um

il nF C

s

ea s >n d

r t

ao 4

1 1

F

)

sn

yf e

dtu c o A

O 2

ta ct ni u

t T

c ec s

N o

G e,

ju

/a r

.l 0 e O

N N

o pn br w

e

/r

/f C

I N

d so c -

ut t

T e

ai xss irr a

e o

n S

t d

t r/ /a f f.

re /

e O

e E

n t

l c

,yr m

T e

i lu ao u

c G

n m

e ar imf S fe i k f n r

N i Y

n r

t i

4 veb ih I

a T i p

ns tl r

T t

I a

in

- aa

/ r Vi5 2i u S

n R

t d

o " hi

/

E o

G n

e lc " tt WiJ vf T C E

o s

a

^

n er f -)

/ c m

e T

C u

cf " ne

?N io

ot u

Y n

r f fa Z N M r.ll/

1 T

e S

I e

t io I

l e

b nsS ftp E

E.

R u

L l

f r

/

elT a

0 d4i G d A

u o

da ut r

e r

E e

R d

t ii e.tn n

V f 'Z, e I 1

i S

T h

U e

rt ie 5 EE N a

s ad 6

c T

h e

ee sr r t N. "

lo o y*t 2

I S

C c

t e

e aa/nef r

n 4

J w e-af U

S s

L g

R d

m guf

/ td r N

A n

T g

e s

qi

/e J i

nn+;id O

R i

S n

h t,

f 5

I U

t i

c

/c fjro /s f l9 r

n eg.ruan z

T T

s L

t S

c 7 -. i C

C e

A s

min o

ekr E

U T I

e nso;ooi

/

7 & /vc 3 (/

f S

R T

T iei?ntt

/~/ c 1 4 i lS T f 5

I adt!

a M

E S

f I-N f

t,c!str E

o I

f n

u!i no S

L t

o omr ei d

e

(

A f

R t

cet-emr I

i E

f ts rne esnMeit SY t A

T L

T i

(

F L

h y o" h a e I

I i

R f

A

(

Tsc" Ttd E

E T

I R

R

= E I

C T

f T s

bc F

E A

Z E

I S

I E

T L

PM%

?

S 4

I.

sf ztq\\ '*

n

i

.?<.

j

-)

1 i

INSERT 5 The tendon system for Unit 2'does not provide for detensioning.

i Detensioning can be performed only on the Unit 1 tendon system.

INSERT 6 4 The 1 year inspection for Unit 2 will consist of a visual inspection only. No lift-off testing will be performed on Unit 2 until the 3 year inspection.

I CONTAINMENT SYSTEMS BASES

)

3/4.6.1.5 AIR TEMPERATURE

}overall containment average air temperature does not exceed the initialThe limitation g

F 1

. temperature condition assumed in the safety analysis for a steam line break I

accident. Measurements shall be made at all listed locations, whether by fixed or portable instruments, prior to determining the average air temperature.

3/4.6.1.6 CONTAINMENT STRUCTURAL INTEGRITY This limitation ensures that the structural integrity of the containment will be maintained comparable to the original design standards for the life of the facility.

Structural integrity is required to ensure that the containment will withstand the maximum pressure of 41.9 psig in the event of a steam line break accident. The measurement of containment tendon lift-off force, the ten-sile tests of the tendon strands for Unit 1, the visual examination of tendons, anchorages and exposed interior and exterior surfaces of the containment and the Type A leakage test for both units are sufficient to demonstrate this capa-bility.

(The tendon strand samples will also be subjected to stress cycling tests and to accelerated corrosion tests to simulate the tendon's operating conditions and environment.) Unit ! n d U.it 2.;,.tein;;nts eetiefy the rec a

-9+'r r " " @ +r y M {/ L ?E, "r"'r'r-2, " citi:r C.I.2.

'5 refere, l

U..*t 2 ;nt;.M.nt i; ntP t t;,.in;i in;,ntin =1.

3

/NSERT 7 Y n;

raill=n ";;;irant; fer d;na;treting th; etrnteral int;;rity Qct of ee;h centeineent is in ceEG'.ien;e iith the re;a;;ndetien; ef ";,i;ir 2 ;f

";;; h u ry Osie 1. 5, "!aservice rn ill a n of Unginted i n dene in Or; h;ged 8 5ht"!!$399N!N"$i!9"i"$ $$355"!I!bi9$f FIIIf 259N NIM SN b 2b'

'"'"'~-"'r"'

' " ~ " " ' " " ' ' ' ' ' " '

"L ! '_ '"1 " ' "% i iT ". T ' "W i........o..,

y,.

The required Special Reports from any engineering evaluation of contain-ment abnormalities shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, the results of the engineering evalua-tion,andthecorrectiveactionstakenorgreg.seqf l

j 3/4.6.1.7 CONTAINMENT VENTILATION SYSTEM The 24-inch containment purge supply and exhaust isolation valves are required to be sealed closed during plant operations since these valves have not been demonstrated capable of closing during a LOCA or steam line break accident.

k Maintaining these valves sealed closed during plant operation ensures that exces-7 sive quantities of radioactive materials will not be released via the Containment Purge System. To provide assurance that these containment valves cannot be inad-vertently opened, the valves are sealed closed in accordance with Standard Review Plan 6.2.4.

Sealed closed isolation valves are isolation valves under admini-strative control to assure that they cannot be inadvertently opened. Admini-b strative control includes mechanical devices to seal or lock the valve closed, the use of blind flanges, or removal of power to the valve operator.

V0GTLE UNITS - 1 & 2 B 3/4 6-2

l l-L L

1.

l INSERT 7 LiG-cff/u//

on Vxi/z wH/ k accompirin/)/* de/mssr's/r4 ofode haf<r sit 04//J.

This /=rt/ca

//alfernok h-twee,i f/je h erp a

/ >'ce k / - V f u fu s.

With regard to D-cracking, the acceptance criteria for the visual inspection of the containment concrete is that the area comprising D-cracking should not exceed 25 sq.ft.

INSERT 8 The conditions referenced by Action statement 3.6.1.6.b do not define abnormal containment degradation. These conditions are indications of potential abnormal degradation and their existence requires an appropriate engineering evaluation and a Special Report in accordance with Specification 6.9.2.

1558n

d.

CONTAINMENT' SYSTEMS-r CONTAINMENT STRUCTURAL INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containments shall be maintained at a l

level consistent with the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY:

Modes 1, 2, 3,- and 4.

ACTION:

L a.

With the abnormal degradation indicated by the conditions in Specification 4.6.1.6.la.4, restore the containment (s) to the required level of integrity or verify that containment integrity is maintained within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and perform an engineering evaluation of the containment (s) and provide a Special Report to the Commission within 15 days in accordance with Specification 6.9.2 or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.

With the indicated abnormal degradation of the structural integrity other than ACTION a. at a level below the-acceptance criteria of Specification 4.6.1.6, restore the containment (s),to the. required level of, integrity.or verify that containment integrity is maintained within 15 days; perform an engineering evaluation of the containment (s) and provide a Special Report to:the Commission within 30 days in accordance with Specification 6.9.2 or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.6.1.6 CONTAINMENT PRESTRESSING SYSTEM The structural integrity of the prestressing-tendons of the containments shall be demonstrated at the end of 1, 3, and 5 years following the initial containment vessel structural integrity test and at 5-year intervals

)

thereafter.

For combined inspections of two containments in a plant, lif t-of f 1

testing will be performed in accordance with the inspection schedule shown in Figure 3.6-1.

j 4.6.1.611 The adequacy of prestressing forces in tendons shall be demonstrated by:

a.

Determining that a random but representative sample of at least 11 tendons (7 hoop and 4 inverted-U) each have an observed lift-off V0G1LE UNITS - 1 & 2 3/4 6-8

u CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) l:

force within the predicted limits established for each tendon.

For each subsequent inspection, one tendon from each group shall be kept unchanged to develop a history and to correlate the observed data.

The procedure of inspection and the tendon acceptance criteria shall be as follows:

1)

If the measured prestressing force of.the ' selected tendon in a group lies above the prescribed lower limit, the lift-of f test is.

considered to be a positive indication of the sample tendon's acceptability.

2)

If the measured prestressing force-of the selected tendon in. a group lies' between the prescribed lower, limit and 90% of the prescribed lower limit, two tendons, one on each. side of this tendon, shall be checked for their prestressing forces.

If the'prestressing forces of these two tendons are above 95% of the prescribed lower limits for the tendons, all three tendons shall be restored to the required level of integrity, and the tendon group shall be considered as acceptable.

If the measured prestressing force of any two tendons falls.below 95% of the prescribed lower limits of the tendons, additional lift-off testing shall be donelto detect the cause and extent of such: occurrence.

The conditions shall be considered as an indication of abnormal degradation of the containment structure.

3)

If the measured prestressing force of any tendon lies below 90% of the prescribed lower limit, an engineering investigation will be performed to determine the cause and extent of the occurrence. The condition shall be considered as an indication of abnormal degradation of the containment structure.

4)

If the average of all measured prestressing forces for each group (corrected for average condition) is found to be less than the minimum required prestress level at anchorage location for that group, the condition shall be considered as abnormal degradation of the containment structure.

5)

If f rom consecutive surveillance the measured prestressing forces for the same tendon or tendons in a group indicate a trend of prestress loss larger than expected and the resulting prestressing forces will be less than the minimum required for the group before the next scheduled surveillance, additional lift-off testing.shall be done so as to determine the cause and extent of such occurrence.

The condition shall be considered as an indication of abnormal degradation of the containment structure.

6) Unless there is abnormal degradation of the containment vessel during the first three inspections, the sample population for subsequent inspections shall include at least 7 tendons (4 hoop, and 3 inverted-U).

b.

Performing tendon detensioning, inspections, and material tests on a previously stressed tendon.

Two tendons, one from each group, shall V0GTLE UNITS - 1 & 2 3/4 6-9

_ _ _ = _ _. _ _ _ _

CONTAINMENT SYSTEMS l

SURVEILLANCE REQUIREMENTS (Continued) 4 be detensioned on Unit 1 each time lift-offs are performed on Unit 1 per Figure 3.6-1.

One tendon shall be detensioned on Unit 1 each time lift-offs are performed on Unit 2 per Figure 3.6-1.

A randomly

(

selected tendon shall be completely detensioned in order to identify i

broken or damaged wires and determining that over the entire length of the removed wire sample (which should include the broken wire if so identified) that:

1) The tendon wires are f ree of corrosion, cracks, and damage, and
2) A minimum tensile strength of 270,000 psi (guaranteed bitimate strength of the tendon material) exists for at least three wire j

samples (one from each end and one at mid-length) cut from each removed wire.

Failure to meet the requirements of 4.6.1.6.lb shall be considered as an indication of abnormal degradation of the containment structure.

c.

For Unit 1 only, performing tendon retensioning of detensioned tendons as close as possible to their observed or predicted lift-of f force, whichever is greater but not to exceed a stress level of 70% of the guaranteed ultimate tensile strength (GUTS) for the tendon material.

During retensioning of these tendons, the changes in load and elongation should be measured simultaneously at a minimum of three approximately equally-spaced levels of force between zero and the seating force.

If the elongation corresponding to a specific load differs by more than 10% f rom that recorded during the installation, an investigation should be made to ensure that the difference is not related to wire failures or slip of wires in anchorages. This condition shall be considered as an indication of abnormal degradation of the containment structure.

d.

Verifying the OPERABILITY of the sheathing filler grease by assuring:

1) There are no changes in the presence or physical appearance of the sheathing filler-grease including the presence of free water.
2) Amount of grease replaced does not exceed 5% of the net duct volume, when injected at a pressure not to exceed the designer's specifications.
3) Minimum grease coverage exists for the different parts of the anchorage system.
4) During general visual examination of the coritainment exterior surface, grease leakage that could af fect containment integrity is not present, and V0GTLE UNIls - 1 & 2 3/4 6-9a 1

c, CONTAINMENT SYSTEMS

' SURVEILLANCE REQUIREMENTS (Continued)

5) 'The chemical properties of the filler material are within the tolerance limits specified as follows:

Water Content 0-10% (by dry wt.)

Chlorides 0-10 ppm Nitrates 0-10 ppm Sulfides 0-10 ppm Reserved Alkalinity

>50% of the installed value; (Base Numbers)

Failure to meet requirement of 4.6.1.6.1d shall be considered as an indication of abnormal degradation of the containment structure.

4.6.1.6.2 End Anchorages and Adjacent Surfaces.

The structural integrity of the end anchorages of all tendons inspected pursuant to Specification 4.6.1.6.1 and the adjacent surfaces shall be demonstrated by determining through visual inspection that no apparent changes have occurred.

a.

All end anchorages including anchor blocks, wedges, shims, and bearing plates:

inspect for moisture, corrosion and cracks, and for warping of bearing plates.

b.

Concrete surf aces ' adjacent to hoop tendon anchorages:

inspect for moisture, corrosion, distortion, and cracking.

c.

Steel plating surrounding the inverted-U tendon anchorages:

inspect for moisture, corrosion, distortion, and cracking.

Significant grease leakage, grease cap deformation, or abnormal concrete / steel plating conditions shall be considered as an indication of abnormal degradation of containment structure.

4.6.1.6.3 Containment Surfaces. The exterior surface of the containments should be visually examined to detect areas of large spall, severe scaling, D-cracking, other surf ace deterioration or disintegration, or significant grease leakage, each of which can be considered as evidence of abnormal degradation of structural integrity of the containments.

l V0GTLE UNITS - 1 & 2 3/4 6-9b

__________________-____-__________Q

7-SAMPLE SIZE CRITERIA (SEE SECTION 4.6.1.6.1)

' 4%

2%

?'

3

',5 25 3p TIME AFTER INITIAL STRUCTURAL INTEGRITY TESTING OF CONTAINMENT, YEARS (Lift-off Testing Schedule, Containment No.1) 0 3

5 1,5

' 2,5~

3,5 TIME AFTER INITIAL STRUCTURAL INTEGRITY TESTING OF CONTAINMENT, YEARS (Litt-off Testing Schedule, Containment No. 2)

Schedule to be used provided:

a. The containments are identical in all aspects such as size, tendon system, design, materials of construction, and method of construction.

The tendon system for Unit 2 does not provide for detensioning. Detensioning can be performed only on the Unit 1 tendon system.

b. The 1-year inspection for Unit 2 will consist of a visual inspection only. No lift-off testing will be performed on Unit 2 until the 3-year inspection.
c. There is no unique situation that may subject either containment to a different potential for structural or tendon deterioration.
d. The Unit 1 and Unit 2 surveillance may be performed back-to-back to facilitate detensioning of Unit 1 tendons during the Unit 2 surveillance.

e, in order to perform back-to-back surveillance on Units 1 and 2, the Unit 1 10-year surveillance and the Unit 2 5-year surveillance are to be performed between 5/1/95 and 11/1/95.

l FIGURE 3.6-1 SCHEDULE OF LIFT-0FF TESTING FOR TWO CONTAINMENTS AT A SITE V0GTLE UNITS-1 & 2 3/4 6-10

e 4

+

o.. -

lr CONTAINMENT SYSTEMS

' BASES l

l l

3/4.6.1.5 -AIR TEMPERATURE l

The limitations on containment average air temperature ensure that the overall containment average air temperature does.not exceed the initial temperature condition assumed in the safety analysis for a steam line break accident. Measurements shall be made at all listed locations, whether by fixed-or portable instruments, prior to determining the average air temperature.

3/4.6.1.6 CONTAINMENT STRUCTURAL INTEGRITY This limitation ensures th'at the structural integrity of the containment i

will be maintained comparable to the original design standards for the life of J

the facility. Structural integrity is required to ensure that the containment l

will withstand.the maximum pressure of 41.9 psig in.the event of a steam line break accident. The measurement of containment tendon lif t-of f force, the ten-sile tests of the tendon strands for Unit 1, the visual examination of tendons, anchorages and exposed interior and exterior surfaces of the containment and the Type-A leakage test for both units'are sufficient to demonstrate this capa-bility.

(The tendon strand samples will also be subjected to stress cycling tests and to accelerated corrosion tests to simulate the tendon's operating conditions and environment.)

Lift-off testing on' Unit 2 will be accompanied by detensioning of one tendon on Unit 1.

This tendon will alternate between l

the hoop and inverted-U tendons. With regard to D-cracking, the acceptance l'

criteria for the visual inspection of the containment concrete is that the area comprising 0-cracking should not exceed 25 sq. f t.

The conditions referenced by Action statement 3.6.1.6.b do not define abnormal containment degradation. These conditions are indications of potential abnormal degradation and their existence requires an appropriate engineering evaluation and a Special Report in accordance with Specification 6.9.2.

The required Special Reports from any engineering evaluation of contain-ment abnormalities shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, the results of the engineering evalua-tion, and the corrective actions taken, or proposed.

l 3/4.6.1.7 CONTAINMENT VENTILATION SYSTEM The 24-inch containment purge supply and exhaust isolation valves are required to be sealed closed during plant operations since these valves have not been demonstrated capable of closing during a LOCA or steam line break accident.

Maintaining these valves sealed closed during plant operation ensures that exces-sive quantities of radioactive materials will not be released via the Containment Purge System.

To provide assurance that these containment valves cannot be inad-vertently opened, the valves are sealed closed in accordance with Standard Review Plan 6.2.4.

Sealed closed isolation valves are isolation valves under admini-strative control to assure that they cannot be inadvertently opened. Admini-strative control includes mechanical devices to seal or lock the valve closed, the use of blind flanges, or removal of power to the valve operator.

V0GTLE UNITS - 1 & 2 8 3/4 6-2