ML20245J179

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 890628 in Region II Ofc Re Enforcement Conference on Environ Issues. Attendees Listed
ML20245J179
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/19/1989
From: Crlenjak R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8906300212
Download: ML20245J179 (2)


Text

_. -

h.

a)-

, 4 - -

JUN 191989 NOTICE OF SIGNIFICANT MEETING Name of Licensee: Florida Power Corporation Name of Facility: Crystal River Docket No.: 50-302 i Date and Time of Meeting: June 28, 1989, at 1:00 p.m.

Location of Meeting: Region II Office, 29th Floor Conference Room Purpose of Meeting: Enforcement Conference on Environmental Qualification Issues NRC Attendees: S. D. Ebneter, Regional Administrator, RII M. L. Ernst, Deputy Regional Administrator, RII t.. A. Reyes, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Director, Division of Reactor Safety (DRS)

G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff M. V. Sinkule, Chief, Reactor Projects Branch 2, DRP R. V. Crlenjak, Chief, Reactor Projects Section 2B, DRP H. N. Berkow, Director, Project Directorate 11-2, Office of Nuclear Reactor Regulation C. A. Julian, Chief, Engineering Branch, DRS T. E. Conlon, Chief, Plant Systems Section, DRS Licensee Attendees: W. S. Wilgus, Vice President, Nuclear Operations B. Simpson, Director, Nuclear Engineering R. C. Widell, Director, Nuclear Operations Site Support L. Tiscione, Manager, Nuclear Procurement Engineering Services D. Shook, Manager, Nuclear Electrical /I&C Engineering P. Tanguay, Manager, Nuclear Operations Engineering NOTE: Attendance by NRC personnel at this NRC/ Licensee meeting should be made known by 2:00 p.m., June 23, 1989, via telephone call to K. Poertner, FTS: 242-4197.

~

Original signed by 8906300212 890619 2 P. J. Fredrickson (for)

DR ADOCK 050 Approved by R. V. Crlenjak, Chief Reactor Projects Section 2B I

Distribution: (See page 2) l  ; O

.Z2 %5

i ao

.o *' . **

JUN 191989 Notice of Significant Meeting 2 Distribution: J. Taylor, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research J. Lieberman, Director, Office of Enforcement i R. Borchardt, Regional Coordinator, ED0 bec: NRC Resident Inspector Document Control Desk '

State of Florida l

1 1

l i

1 I

1 I

1 1

l RII RI RII RII ,

11 RII j l

<9 k KPoertner h

RCrienjak PFr d ckson WF 1 Ik h GJenki s 4 06/ N/89 06//4/89 06/g/89 /of89 '/9 06//$/89 l RI l

l ME t l

L.______ _ _ _ _ _

06/ /89 j