APR 19 1902
Docket Nos. 50-348,50-364
Alabama Power Company
ATTN:
W. G. Hariston, III
Senior Vice President
Nuclear Operations
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT N05. 50-348/89-07 AND 50-304/89-07)
This refers to the Neclear Regulatory Commission (NRC) inspection conducted by
G. F. Maxwell on Mart.h 11 - April 10,1989.
The inspection included a review
of activities authorized for your Farley facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
elements to be included in your response are described in the er:losed Notice
of Violation.
The violation described in the enclosed Notice is similar to violations
contained in the Notices sent to you by our letters dated February 25 and
September 16, 1988.
Because "similar violations," as described in the NRC
Enforcement Policy, are of significant concern to the NRC, please give
particular attention in your response to the identification of the root cause
of this problem and your corrective action tn prevent recurrence.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budgat as required by the
Paper work Reduction Act of 1980, Pub. L. No.96-511.
?b0*$$$CK0500034g
99 890419
Q
'\\
.ZEO I
___
._
-_
-
_
--
_ _ _ _ _ _ _ _ _ - _ - _ _ _
1
(
.
..
.
.
IE E
l
Alabama Power Company
2
l
l
Should you have any questions concerning this letter, please contact us.
Sincerely,
l
(Original signed by LAReyes)
'
Luis A. Reyes, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
!
B. M. Guthrie, Executive Vice President
R. P. Mcdonald, Executive Vice President
J. D. Woodard, Vice President
Nuclear Support
D. Morey, General Manager
Nuclear Plant
.1. W. McGowan, Manager-Safety Audit
and Engineering Review
S. Fulmer, Supervisor-Safety
Audit and Engineering Review