From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
References
GL-88-01, GL-88-1, NUDOCS 8905020265
Download: ML20245F129 (4)


Text

!

1 1

1 April 26, 1989 j

4 Docket No. 50-458 GnTf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

Post Office Box 220 St. Francisville, Louisiana 70775

Dear fir. Deddens:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - GENERIC LETTER 88-01 By letter dated March 8,1989, the NRC staff forwarded a request for additional information regarding Generic Letter 88-01, NRC Position On IGSCC In BWR Austenitic Stainless Steel Piping.

Based on internal discussions, the j

staff has revised page A-1 of Attachment A.

Please replace page A-1 with the enclosed revised page.

If your staff has any questions regarding this revision, please contact Mr. Walter A. Paulson, NRR Project Manager.

Sincerely,

/s/

Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

l See next page DISTRIBUTION Docket. Fi le.

NRC PDR Local PDR PD4 Reading G. Holahan L. Rubenstein J. Calvo P. Noonan W. Paulson F. Hebdon OGC-Rockville E. Jordan B. Grimes ACRS(10)

PD4 Plant File PD4/L PD4/ i PD4/D [

PNoonan WPaulson:sr JCalvo 04@89 04/g/89 04/24/89 9

P

i Q 53Cy 4

[g UNITED STATES 8

NUCLEAR REGULATORY COMMISSION g

j.

WASHINGTON, D. C. 20555

]

e I

,U

%,*sse*/"

April 26, 1989 Docket tio. 50-458 i

Gulf States Utilities

{

ATTH: Mr. James C. Deddens SeniorVicePresident(RBNG) j Post Office Box 220 St. Francisville, Louisiana 70775 l

Dear Mr. Deddens:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - GENERIC LETTER 88-01

.By letter dated March 8, 1989, the NRC staff forwarded a request for additional information regarding Generic Letter 88-01, NRC Position On IGSCC In BWR Austenitic Stainless Steel Piping.

Based on internal discussions, the staff has revised page A-1 of Attache.cnt A.

Please replace page A-1 with the enclosed revised page.

If your staff has any questions regarding this revision, please contact Mr. Walter A. Paulson, W.1 Project Manager.

Sincerely,

,f d'hv' Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page l

i l

l

l f Mr. James C. Deddens Gulf States Utilities. Company River Bend Nuclear Plant CC*

Troy B. Conner, Jr., Esq.

Mr. J. E. Booker Conner and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.

20006 Besumont, TX 77704 Mr. Les England Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs P. O. Box 220 P. O. Box 14690 St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

. Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.

234. Loyola Avenue Department of Justice 3

New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild-Reinike Baton Rouge, Lcuisiana 70806 Louisianians for Safe Energy, Inc.

2108 Broadway Street New Orleans, Louisiana 70118-5462 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisville, Louisiana 70775

(

Office of Executive Director for Operations Mr. Frank J. Uddo 611 Ryan Plaza Drive, Suite 1000 Uddo & Porter Arlington, Texas 76011 6305 Elysian Fields Avenue Suite 400 Philip G. Harris New Orleans, Louisiana 70122 i

Cajun Electric Power Coop. Inc.

10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895 l

1

Revised:

i

  • b l

1 ATTACHMENT A GENERAL QUESTIONS / REQUESTS Reviews of several ifcensee submittals have shown that most (although not all) of the submittals commonly lack certain information that is needed for evaluetion of the submittals. Thus, this general list of questions and requests has been prepared for submission to each of the licensees. For those attachmentforwhichtherequestedinformationwassupplied(portionsofthis in the detail requested herein) in the original submittal, the utilities may reference the relevant pages or tables in the original submittal and supply only the requested information that was not provided. Please certify that you comply with the staff positions in GL-88-01 or identify and justify any deviations taken.

Item 1.

Position on NRC Staff Positions Generic Letter 88-01 states on page 3:

" Pursuant to 10 CFR 50.54(f), you, as a BWR operating reactor licensee or construction permit holder, are requested to furnish, under oath or affirmation, your current plans relating to piping replacement, inspection, repair, and leakage detection. Your response should indicate whether you intend to follow the staff positions included in this letter, or propose alternative measures."

~

The staff positions outlined in Generic Letter 88-01 include positions on:

(1) Materials.

(2) Processes.

(3) Water Chemistry.

(4) Weld Overlay.

(5) Partial Replacement.

(6 Stress Improvement of Cracked (8)) Crack Evaluation and Repair Weldments.

( ) Clamping Devices.

Criteria.

(9 Inspection Method and Personnel.

(10) Inspection Schedules.

( 1) Sample Expansion.

(12) Leak Detection.

(13) l Reporting Requirements.-

I l

Please supply information concerning whether the licensee:

(1) endorses these positions, (2) proposes alternate positions, exceptions, or provisions, and (3) is considering or planning to apply them in the future. Please describe any alternate positions, l

exceptions, or provisions that are proposed.

Please supply this information using a table such ai the illustrated l

in the example shown in Table 1.

A-1 l

j