Forwards Insp Rept 50-482/89-09 on 890313-17 & Notice of Violation
ML20245E922
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/21/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20245E925 List:
References
NUDOCS 8905020191
Download: ML20245E922 (2)


See also: IR 05000482/1989009

Text

..

3

[,,

. ,

APR 21 IW

-

.

In Rep _1y Refer To:

Docketi' STN 50-482/89-09-

Wolf Creek-Nuclear Operating Corporation

ATTN: Bart D.-Withers

,

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

]

Gentlemen:

a

This refers to the inspection conducted by Dr. J. B. Nicholas of this office.

during the period March 13-17, 1989, of activities authorized by NRC Operating

License No. NPF-42 for Wolf Creek Generating Station, and to the discussion of.

our findings with Mr.

R..M. Grant and other members of your staff at the

conclusion of the inspection on March 17, 1989

f

.-

Areas e nmined during the inspection' included the' liquid and gaseous-

radioactive waste management. programs and portions of the occupational

radiation exposure control program. Within these areas, the inspection

'3

consisted of selective examination of procedures and representative records,

1

interviews with personnel, and observations by..the NRC inspector. The

j

inspection findings are documented in the enclosed inspection report,

q

During this inspection, it.was found that several of your activities were in.

violation of. NRC requirements. Three violations are described-in the enclosed

Notice of Violation.

Violation A involves the failure to per. form exit'whole

body counts. Although this violation is considered of minor safety

-significance under the NRC Enforcement Policy and may not have been issued,

the NRC staff is interested in the corrective actions taken to ensure a

potentially significant violation does not occur.

Violation B involves a

,

radiation exposure to the skin of an individual of 12. 5. rems, in excess of

1

NRC's quarterly limit of 7.5 rems for exposures to the skin of the whole

1

body. This exposure a'pparently resulted from a hot particle. ;While NRC

normally classifies exposures of this magnitude at Severity Level'III, we have .

<

classifieo this violation at Severity Level IV due to the small-area of the'

a

skin affected by the hot particle and the minimal health implications of such

an exposure. We also took into accoui.t the fact that the Wolf Creek- Nuclear

Operation Corporation had implemented a hot particle control programwhich has

i

been effective in maintaining exposures within limits.

Violation C involves-

1

the failure to complete a Technical Specification surveillance test.

4

You are requer.ted to. respond to the violations, in writing,-in'accordance with

i

the provisions of Section 2.201.of the NRC's " Rules of Practice,".Part 2,

Title 10, Code of Federal Regulations. Your response should be based on the

~

,

l

specifics contained 1n the Notice of Violation enclosed with this' letter.

'

.

RIV:FRPS

C:FRPS

CtRPB

D

S

DPR

E0

  • JBNicholas;1m *REBaer
  • BMurray

Bhe h

t

Callan

  • GFSanborn

/ /89

/. /89

/ /89

4 20/89

4 /2 (/89

' / /89

/

  • Previously concurred.

f1

p

!.

1 905020191'~890421

-

'3 - '

'

POR

ADOCK 05000482

.'

j

Q

PDC

- .

,

_____

_ _ _ _ .

__- - __-____ _--_

__ - -

1

,

.,

..

,

Wolf Creek Nuclear Operating

-2-

Corporation

1

..

Should you have any questions c.oncerning this inspection, we will be pleased t'o

{

discuss them with you.

j

1

Sincerely,

2

i

i

)

L. J. Callan, Director

-l

Division of Reactor Projects

l

Enclosures:

1.

Appendix A - Notice of Violation

i

2.

Appendix B - NRC Inspection Report

50-482/89-09

3.

Attachment - Documents Reviewed

j

l

cc w/ enclosures:

)

Wolf Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

'

of Licensing

I

P.O. Box 411

j

Burlington, Kansas 66839

i

Wolf Creek Nuclear Operating Corporation

ATTN: Gary doyer, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Commission

ATTN:

Robt.rt D. Elliott, Chief Engineer

Fourth Floor, Docking State Office Building

Topeka, Kansas 66612-1571

,

Kansas Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RRI
  • R. D. Martih, RA
  • Section Chief (DRP/D)
  • DRP

,

  • RPB-DRSS

R. DeFayette, RIII

  • RIV File

SRI, Callaway, RIII

  • MIS System
  • RSTS Operator

l

  • Project Engineer, DRP/D

Lisa Shea, RM/ALF

  • DRS
  • R. E. Baer
  • D. V. Pickett, NRR Project Manager (MS:

13-D-18)

  • J. B. Nicholas
  • B.

Beach

  • R. Hall
  • B. Murray

R. Wise, AC

G. F. Sanborn, E0

w/766

a

____-__ - -