Office of Nuclear Material Safety and Safeguards Procedure Approval Reviewing the Non-Common Performance Indicator, Uranium Recovery Program, Interim State Agreements (SA) Procedure SA-110 Issue Date: August XX, 2020December 20, 2019 Review Date: August XXDecember 20, 20225 Michael C. Layton Original Signed by Director, NMSS/MSST Kevin Williams Date: 12/20/19 Formatted: Indent: Left: 0.1", Space Before: 0 pt, Line spacing: Exactly 13.75 pt, Tab stops: 3.35", Left + 4.6",

Left Lizette Roldan-Otero, Ph.D.Paul Michalak Original Signed by Acting Branch Chief, NMSS/MSST/SALPB Paul Michalak Date: 12/10/19 Stephen Poy Original Signed by Procedure Contact, NMSS/MSST/SALPB Stephen Poy Date: 12/11/19 David CrowleyTerry Derstine Original Signed by Chair, Organization of Agreement States, Chair David CrowleyTerry Derstine Date: 12/19/19 ML19324D066 NOTE Any changes to the procedure will be the responsibility of the NMSS Procedure Contact.

Copies of NMSS procedures will beare available through the NRC Web site at https://scp.nrc.gov.

Interim Procedure SA-110: Reviewing the Non-Common Page: 1 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 I. INTRODUCTION This document describes the procedure for conducting reviews of Agreement State and U.S. Nuclear Regulatory Commission (NRC) uranium recovery program activities using the Non-Common Performance Indicator, Uranium Recovery Program as specified in[ NRC Management Directive (MD) 5.6, Integrated Materials Performance Evaluation Program (IMPEP).]

II. OBJECTIVES A. To verify adequacy of an Agreement State or NRC uranium recovery program through the evaluation of performance with respect to five sub-elements:

Technical Staffing and Training; Status of the Uranium Recovery Inspection Program; Technical Quality of Inspections; Technical Quality of Licensing Actions; and Technical Quality of Incident and Allegation Activities. Review of the activities and actions should confirm that:

1. Technical staffing and training is adequate and well managed, as generally assessed according to Office of Nuclear Material Safety and Safeguards (NMSS) State Agreements (SA) Procedure SA-103, Reviewing the Common Field Code Changed Performance Indicator, Technical Staffing and Training.
2. Licensees are inspected at prescribed frequencies and to verify that statistical data on the status of the inspection program is maintained and can be retrieved, as generally assessed according to NMSS Procedure SA-101, Reviewing the Common Performance Indicator, Status of Materials Inspection Program.
3. Technical quality of inspections is adequate, as generally assessed according to NMSS Procedure SA-102, Reviewing the Common Performance Indicator, Technical Quality of Inspections.
4. Technical quality of licensing actions is adequate, as generally assessed according to NMSS Procedure SA-104, Reviewing the Common Performance Indicator, Technical Quality of Licensing Actions.
5. Response to incidents and allegations is adequate, as generally assessed according to NMSS Procedure SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Allegation Activities.

B. To conduct a performance-based evaluation of the uranium recovery program, considering unique programmatic needs and risk information into consideration when possible.

Interim Procedure SA-110: Reviewing the Non-Common Page: 2 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 III. OVERVIEW An effective uranium recovery licensing and inspection program depends on having a sufficient number of experienced, knowledgeable, and well-trained technical personnel.

Periodic inspections of licensed operations are essential to ensure that activities are conducted in compliance with regulatory requirements and consistent with good safety practices. The inspection frequency is dependent on the amount and type of radioactive material, the type of operation licensed, and the results of previous inspections.

Modifications to the inspection frequency take into account licensee performance and inspection history into account. Information regarding the number of overdue inspections is a significant measure of the status of a uranium recovery inspection program, and thus the capability for maintaining and retrieving statistical data on the status of an inspection program must exist.

The licensing program evaluation includes review of licensing actions, decommissioning actions, and financial surety reviews, including notifications and examination of any actions that have been pending for a significant amount of time, to demonstrate effective and efficient regulation.

Responses to incidents and allegations must be conducted appropriately and in a timely manner in order to protect health, safety, and the environment, as well as maintain public confidence.

IV. ROLES AND RESPONSIBILITIES A. IMPEP Review Team Leader (Team Leader)

1. In coordination with the IMPEP Program Manager, the Team Leader determines which team member is assigned lead review responsibility for this performance indicator.
2. Assigns team member(s) to perform inspector accompaniments. Formatted: Font: (Default) Arial
3. Gathers the information from the Program necessary to select the Formatted: List Paragraph, Right: 0.45", Space Before: 0 inspectors to be accompanied and licensed activities to be inspected. pt, After: 12 pt, Line spacing: Exactly 12.5 pt, Numbered +

Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 +

Alignment: Left + Aligned at: 1.25" + Indent at: 1.5"

4. Selects inspections based upon radiological safety and security Formatted: Font: (Default) Arial significance of the licensed activity, from the Programs pending inspections. The Team Leader may delegate these actions to the principal reviewer. Formatted: Font: (Default) Arial
5. Communicates the teams findings to Program Management and Formatted: List Paragraph, Numbered + Level: 1 +

ensures that the teams findings are in alignment with MD 5.6. Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left

+ Aligned at: 1.25" + Indent at: 1.5"

Interim Procedure SA-110: Reviewing the Non-Common Page: 3 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 B. Principal Reviewer

1. Selects, reviews, and evaluates relevant documentation; conducts interviews with staff; conducts inspector accompaniments for this indicator (unless performed by another team member); evaluates the quality of inspection, licensing, incident, and allegation casework; and maintains a summary of the review for this indicator, including a summary of all casework files reviewed.
2. Coordinates the review of the indicator with other reviewers, if needed. Formatted: Right: 0.19", Space After: 12 pt, Line spacing:

Exactly 12.5 pt

Interim Procedure SA-110: Reviewing the Non-Common Page: 4 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019

1. Informs the Team Leader of the teams findings throughout the onsite review.

Formatted: Indent: Left: 1.25", No bullets or numbering

2. Presents the teams findings to the Program at the staff exit meeting.

Formatted: Indent: Left: 1.25", No bullets or numbering

3. Completes their portion of the IMPEP report for the Uranium Recovery Program performance indicator.

Formatted: List Paragraph, Right: 0", Space Before: 0 pt,

4. Attends the Management Review Board meeting for the IMPEP review; No bullets or numbering presents and discusses the teams findings for the Uranium Recovery Formatted: Body Text, Indent: Left: 1", Right: 0.19",

Program performance indicator (this can be done either in person or Space Before: 0.05 pt, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Tab remotely). stops: Not at 1.54" V. GUIDANCE A. Scope

1. This procedure applies only to the review of uranium recovery program activities common to the Agreement States and the NRC, including 11e.(2) byproduct and source material inspections and licensing activities related to yellowcake production; and the construction, operation, and decommissioning of these facilities.
2. This procedure applies only to the review of uranium recovery actions performed by the Agreement States or the NRC in the period since the last review. The Principal Reviewer for this indicator may review earlier actions to ensure that outstanding items found in a previous review of the uranium recovery program have been addressed.

A. Evaluation Procedures

0. The Principal Reviewer should specifically refer to MD 5.6, Part II (Performance Indicators) and Part III (Evaluation Criteria), Non-Common Performance Indicator, Uranium Recovery Program. These criteria should apply to program data for the entire review period. A finding of satisfactory is appropriate when a review demonstrates the presence of the following conditions:

. The uranium recovery program meets the satisfactory finding for the common performance indicators Technical Staffing and Training, Status of Materials Inspection Program, Technical Quality of Inspections, Technical Quality of Licensing Actions, and Technical Quality of Incident and Allegation Activities as identified in Directive Handbook 5.6 Sections II.B.1, II.C.1, II.D.1, II.E.1, and II.F.1, respectively.

Interim Procedure SA-110: Reviewing the Non-Common Page: 5 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019

a. Uranium recovery licensees are inspected at regular intervals in accordance with frequencies prescribed in Inspection Manual Chapters (IMC) 2641 In-Situ Leach Facilities Inspection Program and 2801 Uranium Mill and 11e.(2)

Byproduct Material Disposal Site and Facility Inspection Program, or compatible Agreement State procedure; inspection schedule deviations are generally the result of decisions that consider the risk of licensee operation, past licensee performance, and the need to temporarily defer the inspection(s) to address more urgent or more critical priorities; and there is a plan to reschedule any missed or deferred inspections or a basis established for not rescheduling.

a. Inspection findings are well-founded and communicated to licensees at the exit briefings, and confirmed formally in writing in 30 days, or 45 days for a team inspection, after inspection completion.
a. A review of inspector field notes or completed reports indicates that inspections are complete and reviewed promptly by supervisors or management.
a. Procedures are in place and implemented to help identify root causes and poor licensee performance. Follow-up inspections address previously identified open items and/or past violations.
a. Inspection findings of performance issues lead to appropriate and prompt regulatory action by program staff and management.
a. Supervisors or designated senior staff accompany all inspectors on an annual basis.
a. Review indicates that uranium recovery inspections address potentially important radiological health, safety, and environmental concerns.
a. Review of completed licensing actions and a representative sample of licensing files indicates that licensing actions are thorough, complete, consistent, and of acceptable technical quality.
a. Procedures compatible with the NMSS procedures listed in the Section VII.

References to SA-107 Reviewing the Non-Common Performance Indicator, Legislation, Regulations, and Other Program Elements and other applicable guidance documents are implemented and followed. In determining compatibility, the Principle Reviewer should exercise flexibility by taking into account the uranium recovery facilities and the type of uranium recovery operations (e.g., conventional, in-situ recovery, heap leach, etc.) the program regulates during the review period.

a. Public hearings have occurred in accordance with the States administrative

Interim Procedure SA-110: Reviewing the Non-Common Page: 6 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 laws.

1. Evaluation for each sub-element for this Non-Common Performance Indicator should be conducted in a manner similar to, but not necessarily part of, the respective Common Performance Indicators.
1. In applying the evaluation criteria, the Principal Reviewer should exercise flexibility to determine the rating for this indicator. The team should consider the current status of the program and any mitigating factors that may have affected performance. The team should also consider the life cycle of the uranium recovery facilities and the type of uranium recovery operations (e.g., conventional, in-situ recovery, heap leach, etc.) the program regulates during the review period.

B. Review Guidelines

1. The response generated by the Agreement State or the NRC to relevant questions in the IMPEP questionnaire should be used to focus the review.
2. The Principal Reviewer should be familiar with the following NRC (Inspection Manual Chapters (IMCs) with regard to the sub-elements, Technical Staffing and Training and Technical Quality of Uranium Recovery Inspections:

IMC 1248, Appendix H, Training Requirements and Qualification Journal for Uranium Recovery Inspector; IMC 1248, Appendix I, Training Requirements and Qualification Journal for Uranium Recovery Project Manager/Technical Reviewer; IMC 2801, Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program; and IMC 2620, On- Site Construction Reviews at Inactive Uranium Mill Tailings Sites.

IMC 2641, In-Situ Leach Facilities Inspection Program;

3. The Principal Reviewer should be familiar with the following NUREGs with Formatted: Font: (Default) Arial regard to the sub-element Technical Quality of Licensing Actions: Formatted: Indent: Left: 1", Numbered + Level: 4 +

Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left NUREG-1620, Standard Review Plan for the Review of a Reclamation Plan for + Aligned at: 1.6" + Indent at: 1.85" Mill Tailings Sites, and NUREG-1569, Standard Review Plan for In-Situ Leach Uranium Extraction License Applications.

3.4. When reviewing a uranium recovery inspection program, tThe Principal Reviewer should consider the following NRC Inspection Procedures (IP): w hen reviewing a uranium recovery inspection program:

Interim Procedure SA-110: Reviewing the Non-Common Page: 7 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 IP 89001, In-Situ Leach Facilities, IP 87654 Uranium Mill In-Situ Leach Uranium Recovery, and 11e.(2)

Byproduct Material Disposal Site Decommissioning I inspection, and current applicable NMSS policy.

4.5. The Principal Reviewer should evaluate for closure or/ modification any issues or recommendations identified during the previous IMPEP review.

C. Review Details

1. Technical Staffing and Training To determine technical staffing and training, in addition to the applicable guidance noted in NMSS Procedure SA-103, Reviewing the Common Performance Indicator, Technical Staffing and Training, the evaluation of staffing and training should be conducted in the same manner and as part of the Directive Handbook to MD 5.6,Section II.B.1 - Common Performance Indicator 1Technical Staffing and Training.

The uranium recovery program staffing evaluated under this indicator can include contractual support or support from other State agencies.

Professional staff should have bachelor's degrees or equivalent training in the physical sciences, life or earth sciences, or engineering. Staff and support contractors qualifications, training, and experience should include the disciplines of health physics; civil or mechanical engineering; geology, hydrology and other earth sciences; or environmental science, depending on the life cycle of the uranium recovery facilities and the type of uranium recovery operations (e.g., conventional, in-situ recovery, heap leach, etc.) the program regulates during the review period.

The following steps for review of this indicator are recommended:

Step 1: Prior to the onsite review, examine the questionnaire responses with respect to the technical staffing and training identified by the Agreement State or the NRC during the review period.

Step 2: During the onsite review, interview the staff to verify positions, expertise required for position, education history and years of experience. Document the staff responses and any change in the number and types of positions and expertise of the staff from the last IMPEP review.

Step 3: During the onsite review, request that staff provide an assessment of their workload and their opinion on whether current staffing and training is sufficient to conduct the required inspections, review licensing actions, prepare

Interim Procedure SA-110: Reviewing the Non-Common Page: 8 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 licensing documents, and conduct all required responsibilities. Document the staff responses to these questions.

Step 4: During the onsite review, interview program management to verify the process and timing for filing vacant positions. If the program has staff vacancies, discuss with management the Programs plans to fill those vacancies.

2. Status of the Uranium Recovery Inspection Program To determine the status of the uranium recovery inspection program, in addition to the applicable guidance noted in NMSS Procedure SA-101, Reviewing the Common Performance Indicator, Status of Materials Inspection Program, the evaluation of the status of the uranium recovery inspections should be conducted in the same manner and as part of the Directive Handbook to MD 5.6,Section II.B.2 - Common Performance Indicator 2Status of Materials Inspection Program.

The frequency of periodic inspections of licensed uranium recovery operations evaluated under this indicator are essential to ensure that activities are being conducted in compliance with regulatory requirements and consistent with good safety practices. The frequency of inspections is specified in IMC 2601, In-situ Leach Facilities Inspection Program, for in situ leach mining facilities and in IMC 2801, Uranium Mill and 11e(2) Byproduct Material Disposal Site and Facility Inspection Program, for conventional uranium and thorium mills. Uranium recovery facilities that are on standby or under decommissioning also should be inspected at the frequencies specified. Inspections should occur more frequently if significant regulatory concerns develop, before major changes are made to operations, or if generic problems are identified. There must be a capability for maintaining and retrieving statistical data on the status of the inspection program for the uranium recovery program.

The following steps for review of this indicator are recommended:

Step 1: Prior to the onsite review, examine the questionnaire responses with respect to the status of the uranium recovery inspections identified by the Agreement State or the NRC during the review period.

Step 2: During the onsite review, interview the staff to verify the number of inspectors and required inspections for each licensee. Document the staff responses and any change in the number and types of licensee inspections conducted each year since the last IMPEP review.

Step 3: During the onsite review, request that staff provide their assessment of the status of the uranium recovery inspections. Interview staff and determine how many inspections were on time, and how many were late or missed. Also

Interim Procedure SA-110: Reviewing the Non-Common Page: 9 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 determine the reasons for the late or missed inspections. Document the staff responses to these questions.

Step 4: During the onsite review, review the program tracking system to verify that inspections were completed in accordance to the IMC 2801 Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program and that inspection results were issued to the licensee in a timely manner.

Step 5: Document the case information as required by SA-101, Reviewing the Common Performance Indicator, Status of Materials Inspection Program.

3. Technical Quality of Uranium Recovery Inspections To determine technical quality of uranium recovery inspections, in addition to the applicable guidance noted in NMSS Procedure SA-102, Reviewing the Common Performance Indicator, Technical Quality of Inspections, the evaluation of the technical quality of the uranium recovery inspections should be conducted in the same manner and as part of the Directive Handbook to MD 5.6,Section II.B.3 -

Common Performance Indicator 3Technical Quality of Uranium Recovery Inspections.

The Principal Reviewer or other review team members will accompany the Agreement State or NRC inspectors to evaluate their knowledge and capabilities. During these accompaniments, the programs performance regarding evaluation of licensees adherence to regulatory requirements, and the safe and secure use of agreement material at uranium milling facilities during the inspections above will also be assessed. Ideally, these accompaniments will occur at a time other than the onsite review of the Agreement State or the NRC program. Reviews of this sub-element focus on the scope, completeness, and technical accuracy of completed inspections and related documentation. The Principal Reviewer will conduct in-depth, onsite reviews of completed inspection reports. In addition, the Principal Reviewer will verify that supervisors or designated senior staff generally conduct accompaniments of inspectors on an annual basis to provide management quality assurance.

The following steps for review of this indicator are recommended:

Step 1: Prior to the onsite review, examine the questionnaire responses with respect to the technical quality of uranium recovery inspections identified by the Agreement State or the NRC during the review period.

Step 2: Prior to the onsite review, examine the applicable Agreement State or NRC inspection procedures, and accompany inspector(s)s at a uranium recovery facility. The number of inspector accompaniments should be in accordance with SA-102. Observe the inspectors conducting the inspection and their adherence to applicable inspection procedures. Document your observations and the staff responses to questions.

Interim Procedure SA-110: Reviewing the Non-Common Page: 10 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 Step 3: During the onsite review, inquire as to how inspection reports and findings are transmitted to the licensee. Request information on how safety concerns or violations are addressed during an inspection and what actions licensees are expected to take to respond to safety concerns and violations uncovered during anthe inspection. Document the staff responses.

Step 4: During the onsite review, request that staff provide inspection reports, including those where safety concerns or violations were identified for your review. Review the inspection reports against applicable inspection guidance.

Review the quality and clarity of these inspection documents. Review any required actions taken by the licensee to respond to any inspection safety concerns or violation findings.

Step 5: During the onsite review, request that staff provide their assessment of the technical quality of the uranium recovery inspections and if any improvements are needed to enhance the quality of the inspections or applicable inspection guidance. Document the staff responses to these questions.

Step 6: Document the case information as required by SA-102, Reviewing the Common Performance Indicator, Technical Quality of Inspections.

4. Technical Quality of Licensing Actions To determine technical quality of licensing actions, in addition to the applicable guidance noted in NMSS Procedure SA-104, Reviewing the Common Performance Indicator, Technical Quality of Licensing Actions, the evaluation of the technical quality of the uranium recovery licensing program should be conducted in the same manner and as part of the Directive Handbook to MD 5.6,Section II.B.4 - Common Performance Indicator 4Technical Quality of Licensing Actions.

The Principal Reviewer will evaluate whether the essential elements of the regulatory licensing requirements for radiation protection, qualifications of personnel, facilities and equipment, operating and emergency procedures, financial qualification and assurance, closure and decommissioning procedures, and institutional arrangements are met in a manner sufficient to establish the basis for a licensing action. Licensing actions and other related activities may be accomplished through the preparation and use of internal licensing guides, policy memoranda, or use of the NRC compatible guides to ensure technical quality in the licensing program. Onsite visits of Pre-licensing inspection of complex facilities are conductedduring the licensing process are conducted, when appropriate.

The following steps for review of this indicator are recommended:

Interim Procedure SA-110: Reviewing the Non-Common Page: 11 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 Step 1: Prior to the onsite review, examine the questionnaire responses with respect to the technical quality of licensing actions identified by the Agreement State or the NRC during the review period.

Step 2: Prior to the onsite review, if possible, or at the beginning of the onsite review, examine the applicable NRC or Agreement State or NRC licensing procedures.

Step 3: During the onsite review, request that staff provide several examples of documentation of licensing actions completed since the last IMPEP. These should include new licensing actions, license renewals, license amendments, license termination, surety reviews, major construction or decommissioning decisions, and any others if possible. Review the quality and clarity of these licensing action documents and their adherence to any applicable guidance.

Document your review of these actions.

Step 4: During onsite review, request that staff provide their assessment of the technical quality of the licensing actions and if any improvements are needed to enhance the quality of the licensing actions or applicable guidance. Document the staff responses to these questions.

Step 5: Document the case information as required by SA-104, Reviewing the Common Performance Indicator, Technical Quality of Licensing Actions.

5. Technical Quality of Incident and Allegation Activities To determine technical quality of incident and allegation activities, in addition to the applicable guidance noted in NMSS Procedure SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Allegation Activities, the evaluation of the uranium recovery program incidents and allegations of safety concerns should be conducted in the same manner and as part of the Directive Handbook to MD 5.6,Section II.B.5 - Common Performance Indicator 5Technical Quality of Incident and Allegation Activities.

The following steps for review of this indicator are recommended:

Step 1: Prior to the onsite review, examine the questionnaire responses with respect to the incidents and allegations identified by the NRC or Agreement State or NRC during the review period.

Step 2: Prior to the onsite review, perform a search of the Nuclear Material Events Database (NMED) to determine if there were any events in this indicator identified for the program under review.

Step 3: Prior to the onsite review, if possible, or at the beginning of the onsite review, examine the applicable NRC or Agreement State or NRC incident response and allegation procedures.

Interim Procedure SA-110: Reviewing the Non-Common Page: 12 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 Step 4: During the onsite review, request a summary list of incident and allegation cases and select specific case files to review.

Step 5: During the onsite review, evaluate the quality of the case files to determine if the response was thorough and commensurate with the safety significance of the incident or allegation.

Step 6: During the onsite review, interview staff responsible for handling incident and allegation response to gain an understanding of the process by which incidents and allegations are resolved, and to answer any questions about the case files that were reviewed.

Step 7: Document the case information required by the casework summary sheets applicablereferenced in appendices to SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Allegation Activities.

D. Evaluation Process

1. The Principal Reviewer should specifically refer to MD 5.6, Part II (Performance Indicators) and Part III (Evaluation Criteria), Non-Common Performance Indicator, Uranium Recovery Program. These criteria should apply to program data for the entire review period. A finding of satisfactory is appropriate when a review demonstrates the presence of the following conditions:
a. The uranium recovery program meets the satisfactory finding for the common performance indicators Technical Staffing and Training, Status of Materials Inspection Program, Technical Quality of Inspections, Technical Quality of Licensing Actions, and Technical Quality of Incident and Allegation Activities as identified in the Handbook to MD 5.6. Sections III.B.1, III.C.1, III.D.1, III.E.1, and III.F.1, respectively.
b. Uranium recovery licensees are inspected at regular intervals in accordance with frequencies prescribed in Inspection Manual Chapters (IMC) 2641 In-Situ Leach Facilities Inspection Program and 2801 Uranium Mill and 11e.(2)

Byproduct Material Disposal Site and Facility Inspection Program, or compatible Agreement State procedure; inspection schedule deviations are generally the result of decisions that consider the risk of licensee operation, past licensee performance, and the need to temporarily defer the inspection(s) to address more urgent or more critical priorities; and there is a plan to reschedule any missed or deferred inspections or a basis established for not rescheduling.

c. Inspection findings are well-founded and communicated to licensees at the exit briefings, and confirmed formally in writing in 30 days, or 45 days for a team inspection, after inspection completion.
d. A review of inspector field notes or completed reports indicates that

Interim Procedure SA-110: Reviewing the Non-Common Page: 13 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 inspections are complete and reviewed promptly by supervisors or management.

e. Procedures are in place and implemented to help identify root causes and poor licensee performance. Follow-up inspections address previously identified open items and past violations.
f. Inspection findings of performance issues lead to appropriate and prompt regulatory action by program staff and management.
g. Supervisors or designated senior staff accompany all inspectors on an annual basis.
h. Review indicates that uranium recovery inspections address potentially important radiological health, safety, and environmental concerns.
i. Review of completed licensing actions and a representative sample of licensing files indicates that licensing actions are thorough, complete, consistent, and of acceptable technical quality.
j. Procedures compatible with the NMSS procedures listed in the Section VII.

References to SA-107 Reviewing the Non-Common Performance Indicator, Legislation, Regulations, and Other Program Elements and other applicable guidance documents are implemented and followed. In determining compatibility, the Principle Reviewer should exercise flexibility by taking into account the uranium recovery facilities and the type of uranium recovery operations (e.g., conventional, in-situ recovery, heap leach, etc.) the program regulates during the review period.

k. Public hearings have occurred in accordance with the States administrative laws.
2. Evaluation for each sub-element for this Non-Common Performance Indicator should be conducted in a manner similar to, but not necessarily part of, the respective Common Performance Indicators.
3. In applying the evaluation criteria, the Principal Reviewer should exercise flexibility to determine the rating for this indicator. The team should consider the current status of the program and any mitigating factors that may have affected performance. The team should also consider the life cycle of the uranium recovery facilities and the type of uranium recovery operations (e.g., conventional, in-situ recovery, heap leach, etc.) the program regulates during the review period.

Formatted: Indent: Left: 1.25", No bullets or numbering Discussion of Findings with the Agreement State Radiation Control Program or NRC

Interim Procedure SA-110: Reviewing the Non-Common Page: 14 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019

1. The IMPEP team should follow the guidance in SA-100, Implementation of the Integrated Materials Performance Evaluation Program (IMPEP), for discussions of technical findings with technical staff, supervisors, and management. If performance issues are identified by the reviewer(s) that lead to programmatic weaknesses, the reviewer(s) should seek to identify the root cause(s) of the issues which can be used as the basis for developing recommendations for corrective actions. Appendix D of SA-100 contains criteria regarding the development of recommendations by the IMPEP team.
2. In terms of general guidance for the IMPEP review team, a finding of "satisfactory" should be considered when none or only a few or small number of the cases or areas reviewed involve performance issues/deficiencies (e.g.,

inspection, licensing, staffing, etc.) ; an "unsatisfactory" finding should be considered when a majority or a large number of cases or areas reviewed involve performance issues/deficiencies, especially if they are chronic, programmatic, and/or of high-risk significance; and a finding of "satisfactory, but needs improvement" should be considered when more than a few or a small number of the cases or areas reviewed involve performance issues/deficiencies in high-risk-significant regulatory areas, but not to such an extent that the finding would be considered unsatisfactory.

2. A single rating will be assigned to this performance indicator using the guidance in Section V.E.2. of this procedure. If an Agreement States program is limited to the regulatory oversight of uranium recovery facilities, the review team will provide individual ratings for each of the sub-indicators as if they were common performance indicators in accordance with MD 5.6. See SA-100 for additional guidance.

Note: Examples of Less than Satisfactory Findings of Program Performance can be Formatted: Font: (Default) Arial found in the IMPEP Toolbox on the sState cCommunications pPortal Web site. These Formatted: Indent: Left: 0.5", No bullets or numbering examples may assist the reviewer in identifying less than fully satisfactory findings of a Formatted: Font: (Default) Arial Programs performance Formatted: Font: (Default) Arial 3.

Formatted: Font: (Default) Arial VI. APPENDICES Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial Appendix A - Examples of Less than Satisfactory Programs Formatted: Normal, No bullets or numbering X.VI. REFERENCES Memorandum of Understanding Between the NRC and OSHA; Worker Protection at NRC- Licensed Facilities, July 19, 2013. (ADAMS Accession No. ML11354A432)

Memorandum of Understanding Between the NRC and MSHA, 45 FR 1315, January 4, 1980. (ADAMS Accession No. ML093020131)

Memorandum to M. Virgilio, Re: Adjustments to the Uranium Recovery Inspection

Interim Procedure SA-110: Reviewing the Non-Common Page: 15 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 Program February 13, 2004 (ADAMS Accession No. ML040480067).

NMSS SA Procedures available at https://scp.nrc.gov.

Formatted: Indent: Left: 0" SA-100, Implementation of the Integrated Materials Performance Evaluation Program (IMPEP).

SA-101, Reviewing the Common Performance Indicator, Status of Materials Inspection Formatted: Indent: Left: 0", First line: 0" Program.

SA-102, Reviewing the Common Performance Indicator, Technical Quality of Inspections. Formatted: Indent: Left: 0" SA-103, Reviewing the Common Performance Indicator, Technical Staffing and Training.

SA-104, Reviewing the Common Performance Indicator, Technical Quality of Licensing Actions.

SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Formatted: Indent: Left: 0", First line: 0" Allegation Activities.

SA-107, Reviewing the Non-Common Performance Indicator, Legislation, Formatted: Default, Indent: Left: 0.5", First line: 0",

Right: 0", Space Before: 0 pt Regulations, and Other Program Elements.

NRC Inspection Manual Chapters available at https://www.nrc.gov/reading-rm/doc-collections/insp-manual/manual-chapter/.

IMC 1248, Appendix H, Training Requirements and Qualification Journal for Uranium Recovery Inspector.

IMC 1248, Appendix I, Training Requirements and Qualification Journal for Uranium Recovery Project Manager/Technical Reviewer IMC 2641, In-Situ Leach Facilities Inspection Program.

IMC 2620, On-Site Construction Reviews at Inactive Uranium Mill Tailings Sites (Title I, Uranium Mill Tailings Radiation Control Act).

IMC 2801, Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program.

NRC Inspection Procedures at https://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html IP 87654, Uranium Mill, In-Situ Leach Uranium Recovery, and 11e.(2) Byproduct Material Formatted: Indent: Left: -0" Disposal Site Decommissioning Inspection.

IP 89001, In-Situ Leach (ISL) Facilities. Formatted: Indent: Left: 0", Hanging: 0.5", Right: 0",

Don't adjust space between Latin and Asian text, Don't NRC Management Directives available at https://scp.nrc.gov: adjust space between Asian text and numbers, Tab stops:

MD 5.6, Integrated Materials Performance Evaluation Program (IMPEP). Formatted: Indent: Left: 0", First line: 0", Line spacing:

Exactly 12.55 pt, Don't adjust space between Latin and Asian NRC Regulatory Guides (RGs) available at https://www.nrc.gov/reading-rm/doc- text, Don't adjust space between Asian text and numbers, collections/reg-guides/#guides Tab stops: 0.5", Left The following may be most applicable to this performance indicator:

Interim Procedure SA-110: Reviewing the Non-Common Page: 16 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 RG 3.11, Rev. 3, Design, Construction Design, Construction, and Inspection of Embankment Retention Systems at Uranium Recovery Facilities, November 2008.

RG 4.14, Rev.1, Radiological Effluent and Environmental Monitoring at Uranium Mills, April 1980.

RG 8.11, Rev. 0, Applications of Bioassay for Uranium, June 1974.

RG 8.22, Rev. 1, Bioassay at Uranium Mills, August 1988.

RG 8.30, Rev. 1, Health Physics Surveys in Uranium Recovery Facilities, May 2002.

RG 8.31, Rev. 1, Information Relevant to Ensuring that Occupational Radiation Exposures at Uranium Recovery Facilities Will be As Low As is Reasonably Achievable, May 2002.

NRC Regulatory Issue Summaries (RIS) available at https://www.nrc.gov/reading-rm/doc-collections/gen-comm/reg-issues/

RIS 2000-023, Recent Changes to Uranium Recovery Policy, November 30, 2000.

RIS 2009-005, Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Applications for New Uranium Groundwater Facilities, and (2) the Restoration of Groundwater at Licensed Uranium in-situ Recovery Facilities. April 29, 2009.

NUREG Series available at https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/

NUREG-1569, Standard Review Plan for In Situ Leach Uranium Extraction License Applications, June 2003. (ADAMS Accession No. ML032250177)

NUREG-1620, Rev. 1, Standard Review Plan for the Review of a Reclamation Plan for Mill Tailings Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978, June 2003. (ADAMS Accession No. ML032250190)

Interim Procedure SA-110: Reviewing the Non-Common Page: 17 of 14 Performance Uranium Recovery Program Issue Date:

12/20/2019 XXIV.VII. AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)

REFERENCE DOCUMENTS For knowledge management purposes, all previous revisions of this procedure, as well as associated correspondence with stakeholders, that have been entered into ADAMS are listed below.

No. Date Document Title/Description Accession Number Formatted Table 1 7/2/2004 Request for Comments on Draft of Two New ML041880157 IMPEP Procedures Regarding Review of Uranium Recovery Programs and Low Level Waste Programs (STP-04-047) 2 4/14/2004 Summary of Comments on SA-110 ML060450028 3 8/30/2005 Final STP Procedure SA-110 ML052440571 4 1/22/2010 Revised FSME Procedure SA-110 ML093420327 5 12/20/2019 Revised NMSS Interim Procedure IP SA-110 ML19324D066 6 Xx/xx/ Resolution of Comments ML 7 Final NMSS Procedure SA-110 ML

Appendix A EXAMPLES OF LESS THAN SATISFACTORY FINDINGS OF PROGRAM PERFORMANCE Formatted: Centered, Don't adjust space between Latin and Asian text, Don't adjust space between Asian text and NOTES: numbers The effectiveness of a program is assessed through the evaluation of the criteria listed in Section III, Evaluation Criteria, of MD 5.6, Integrated Materials Performance Evaluation Program (IMPEP). These criteria are NOT intended to be exhaustive but provide a starting point for the IMPEP review team to evaluate this indicator. The review team should also take into consideration other relevant mitigating factors that may have an impact on the programs performance under this performance indicator. The review team should consider a less than satisfactory finding when the identified performance issue(s) is/are programmatic in nature, and not isolated to one aspect, case, individual, etc. as applicable.

This list is not all inclusive and will be maintained and updated in the IMPEP Toolbox on the state Formatted: Normal, Centered, Right: 0", Don't adjust space communications portal website: https://scp.nrc.gov. between Latin and Asian text, Don't adjust space between Asian text and numbers, Tab stops: Not at 0.58" The following are examples of review findings that resulted (or could result) in a program being Formatted: Centered found satisfactory, but needs improvement for this indicator:

a) The programs questionnaire response indicated that there were no allegations received during Formatted: Normal, Centered, Right: 0", No bullets or numbering, Don't adjust space between Latin and Asian text, the review period. However, in reviewing the list of incidents and concerns, the review team identified Don't adjust space between Asian text and numbers more than a few concerns that should have been identified as allegations. Each of the concerns was a statement or assertion of impropriety or inadequacy associated with regulated activities, in which the validity had not been established. There exists a programmatic issue with regard to the programs ability to properly assess and/or capture the impact of the licensees improprieties or inadequacies with regard to incidents, allegations, and concerns.

b) Based on the accompaniments and discussion with staff, the review team found that the uranium recovery program staff did not consistently use instrumentation to perform independent and confirmatory survey measurements. This indicates potential issues related to staff training.

A program can not properly assess if the licensee is conducting the licensed activities in a safe manner that protects the workers and members of the public and verify if the licensee is controlling the licensed materials adequately, if it fails to properly perform independent and confirmatory survey measurements.

c) Overall, based on a review of inspection records and interviews with staff, the review team identified deficiencies in the radiation safety inspections performed since the last IMPEP review. Specifically, for a uranium recovery facility, all of the elements identified in IMC 2801, Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program were not evaluated.

d) The review team determined that the uranium recovery program training and Formatted: Normal, Centered, No bullets or numbering qualification program that was established during the review period was not compatible with IMC 1248, Appendix H, Training Requirements and Qualification Journal for Uranium Recovery Inspector because it did not contain the essential objectives of IMC 1248, Appendix H, (e.g., on the job training, training classes, etc.).

Formatted: Normal, Centered, Space After: 6 pt, No bullets or numbering A-1

f) More than a few licenses in the uranium recovery program were inspected at intervals that exceeded the IMC frequency, as per IMC 2641 In-Situ Leach Facilities Inspection Program or IMC 2801, Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program (whichever is applicable), by more than 150 percent, and at the time of the IMPEP review, one inspection was overdue and not yet completed.

g) The review team determined that inspection results for the uranium recovery program were not communicated by formal correspondence to the licensee within 30 days. Additionally, closeout letters were not sent out in more than a few inspections. As per Management Directive 5.6, Integrated Materials Performance Evaluation Program (IMPEP) inspection findings must be communicated to licensees at the exit briefings, and confirmed formally in writing in 30 days after inspection completion.

h) During inspector accompaniments, the review team observed one inspector was unable to independently perform a complete inspection. The inspector did not demonstrate proper inspection techniques, familiarity with the license being inspected, use of survey instrumentation, knowledge of proper postings/other regulatory requirements, or an understanding of the uranium recovery operations at the facilitys inspected (Directive Handbook 5.6,Section III D.2.a).

i) Formal licensing procedures did not exist during the entire review period. The lack of formal written licensing procedures led to some inconsistent, incomplete, and inaccurate licensing actions during the review period (Directive Handbook 5.6,Section III D.2.a).

The following are examples of review findings that resulted (or could result) in a program being Formatted: Centered, Space After: 6 pt, Don't adjust space found unsatisfactory for this indicator: between Latin and Asian text, Don't adjust space between Asian text and numbers a) On the inspection accompaniment, the reviewer noted that the inspector did not address Formatted: Normal, Centered, Space After: 6 pt, No bullets any of the groundwater inspection procedures addressing groundwater protection for in-situ or numbering, Don't adjust space between Latin and Asian text, Don't adjust space between Asian text and numbers recovery facilities (e.g. IP 89001, In-Situ Leach (ISL) Facilities). The reviewer observed several aspects of the in-situ recovery groundwater operations that should have triggered concerns or questions from the inspector; however, those items are not addressed during the inspection.

During the site review, the reviewer determined that the uranium recovery program routinely conducted inspections but found the program systemically did not inspect the groundwater protection provisions as required by the program. Furthermore, the reviewer was informed by staff that the program was not the responsible agency, as another State agency (i.e., under the Safe Drinking Water Act) conducts inspections for similar provisions. The reviewer informed the staff that while it is the programs responsibility to determine how its regulations are implemented, the program under the Atomic Energy Act cannot abdicate its responsibility for compliance with its regulations entirely to another program which is operating under auspices of another statute and not subject to a review.

b) For the review period, the radioactive materials program did not receive reports of any incidents related to the uranium recovery program even though there were incidents during the review period. It was determined by the review team that the program while revising their current incident and allegations procedures, does not have incident and allegations procedures to follow, nor are any incident response and allegations procedures being implemented. A program must have incident and allegations procedures and must be able to properly implement these procedures in order for the program to be able to properly capture and address incidents and allegations with regard to public health and safety as per guidance in SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Allegation Activities.

c) It was determined by the review team that most licensees were inspected at intervals A-2

that exceed the frequencies prescribed in IMC 2801, Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program or compatible Agreement State procedure (for conventional uranium mills), or intervals that exceed the frequencies prescribed in IMC 2641 In-Situ Leach Facilities Inspection Program or compatible Agreement State procedure (for in situ leach facilities).

d) Members of the review team accompanied a uranium recovery program inspector during inspections of uranium recovery facilities. In most cases, inspection findings were not well-founded and/or not communicated to licensees at the exit briefings and were not confirmed formally in writing in 30 days, or 45 days for a team inspection, after inspection completion.

Inspection findings related to performance issues did not lead to appropriate and prompt regulatory action by program staff and management in most cases. As per Management Directive 5.6, Integrated Materials Performance Evaluation Program (IMPEP), inspection findings must be communicated to licensees at the exit briefings and confirmed formally in writing within 30 days after inspection completion.

e) The review team determined that compatible inspection procedures were not in place and/or not implemented to identify root causes and poor licensee performance. Follow-up inspections did not address previously identified open items and/or past violations in most cases. As per Management Directive 5.6, corrective actions shall address root cause(s) and shall have the potential to achieve compliance and prevent recurrence in most cases reviewed.

f) The review team determined that public hearings have not occurred in accordance with the States administrative laws and/or did not address all aspects of the licensing action associated with a uranium recovery facility.

A-3