ML20245D736
| ML20245D736 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/16/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20245D738 | List: |
| References | |
| RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 8906270216 | |
| Download: ML20245D736 (2) | |
See also: IR 05000313/1989018
Text
_ __
_
,
.
'.
.
JUN i 61999
-
'
In Reply Refer To:
,
Dockets: 50-313/89-18
!
50-368/89-18
!
Arkansas Power & Light Company
i
ATTN: Mr. Gene Campbell
i
Vice President, Nuclear
]
Operations
,
P.O. Box 551
i
Little Rock, Arkansas 72203
f
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and R. C. Haag
of this office during the period April 16 through May 31, 1989, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
f
Units 1 and 2, and to the discussion of our findings with Mr. N. S. Carns and
other members of your staff at the conclusion of the inspection.
i
Areas examined during the inspection included f6lowup on previously identified
!
items, followup of events, operational safety verification, surveillance,
i
maintenance, and installation and testing of modifications.
Within these
areas, the inspection consisted of selective exaraination of procedures and
i
representative records, interviews with personnel, and observations by the NRC
inspectors. The findings are documented in the enclosed inspection report.
!
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation (Notice) enclosed with this letter.
An unresolved item is identified in paragraph 7 of the enclosed inspection
report regarding the adequacy of work controls on limit switch adjustment for
correction of a problem with closing time of a containment isolation valve.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by tne Papenvork Reduction Act of 1980, PL 96-511.
h
D
G
' &
h h/d
RIV:SR1r
C:DRP/A
D:DPf
l
WDJohnson
DDChamberlain
JLMilhoan
6/jf/89
6/f5/89
6//f/89
9
3
,\\
-
-
-
- - ~
!
.
)
J
..
.
1
-
Arkansas Power & Light Company
-2-
'
1
.
Should you have any questions concerning this inspection, we will be pleased to
,
discuss them with you.
j
l
Sincerely,
Original Signed BT,
$ w g M 7..
Ak60
James L. Milhoan, Director
Division of Reactor Projects
i
'
Enclosures-
'
1,
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/89-18
50-368/89-18
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
N. S. Carns, b rector
Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
,
l
bec distrib. by RIV:
- RRI
- Robert D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/A)
l
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
,
- C. Harbuck, NRR Project Manager (MS:
13-D-18)
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- DRS(2)
- w/766
l
l
.
l
l
I
!
l
!
L