Forwards Insp Repts 50-313/89-18 & 50-368/89-18 on 890416-0531 & Notice of Violation.Unresolved Item Noted
ML20245D736
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/16/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20245D738 List:
References
RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 8906270216
Download: ML20245D736 (2)


See also: IR 05000313/1989018

Text

_ __

_

,

.

'.

.

JUN i 61999

-

'

In Reply Refer To:

,

Dockets: 50-313/89-18

!

50-368/89-18

!

Arkansas Power & Light Company

i

ATTN: Mr. Gene Campbell

i

Vice President, Nuclear

]

Operations

,

P.O. Box 551

i

Little Rock, Arkansas 72203

f

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnson and R. C. Haag

of this office during the period April 16 through May 31, 1989, of activities

authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

f

Units 1 and 2, and to the discussion of our findings with Mr. N. S. Carns and

other members of your staff at the conclusion of the inspection.

i

Areas examined during the inspection included f6lowup on previously identified

!

items, followup of events, operational safety verification, surveillance,

i

maintenance, and installation and testing of modifications.

Within these

areas, the inspection consisted of selective exaraination of procedures and

i

representative records, interviews with personnel, and observations by the NRC

inspectors. The findings are documented in the enclosed inspection report.

!

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation (Notice) enclosed with this letter.

An unresolved item is identified in paragraph 7 of the enclosed inspection

report regarding the adequacy of work controls on limit switch adjustment for

correction of a problem with closing time of a containment isolation valve.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by tne Papenvork Reduction Act of 1980, PL 96-511.

h

D

G

' &

h h/d

RIV:SR1r

C:DRP/A

D:DPf

l

WDJohnson

DDChamberlain

JLMilhoan

6/jf/89

6/f5/89

6//f/89

9

3

,\\

-

-

-

- - ~

!

.

)

J

..

.

1

-

Arkansas Power & Light Company

-2-

'

1

.

Should you have any questions concerning this inspection, we will be pleased to

,

discuss them with you.

j

l

Sincerely,

Original Signed BT,

$ w g M 7..

Ak60

James L. Milhoan, Director

Division of Reactor Projects

i

'

Enclosures-

'

1,

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-313/89-18

50-368/89-18

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

N. S. Carns, b rector

Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

,

l

bec distrib. by RIV:

  • RRI
  • Robert D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

l

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A

,

  • C. Harbuck, NRR Project Manager (MS:

13-D-18)

  • C. Poslusny, NRR Project Manager (MS:

13-D-18)

  • DRS(2)
  • w/766

l

l

.

l

l

I

!

l

!

L