ML20245C739

From kanterella
Jump to navigation Jump to search
Forwards Exam Repts 50-424/OL-88-03 & 50-425/OL-88-03 of Exams Administered on 881108 to 890112
ML20245C739
Person / Time
Site: Vogtle  
Issue date: 04/17/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20245C742 List:
References
NUDOCS 8904270367
Download: ML20245C739 (2)


Text

- _ - _. _

y

-i April 17, 1989 Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President -

-Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

V0GTLE ELECTRIC GENERATING PLANT EXAMINATION REPORT 50-424/425/0L-88-03 The NRC administered examinations on November 8-10, December 5-7, 1988, and January 11-12, 1989, to employees of your company who had applied for licenses to operate Unit 2 of the Vogtle Nuclear Plant.

Preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosure:

Exam Report 50-424/425/0L-88-03 cc w/ encl:

G. Bockhold, Plant Manager K. Holmes, Site Training Director State of Georgia bec w/ enc 1:

(See page 2)

[A PN sen

L

't i

l Georgia Power Company 2

April 17, 1989 bec w/ enc 1:

' J. Hopkins, NRR M. Sinkule, DRP J. Arildsen, DRS Senior Resident Inspector Operator Licensing Branch, DLPQ:NRR Document Control Desk P. Isaksen, INEL, Contractor F. Jaggar, INEL, Contractor RIl RII R1 Ril BMichael:tj JAfildsen t u ro TPiebles 04//;3/89 04/j)/89 0 /6 /89 04/,7 /89

/