ML20245A941

From kanterella
Jump to navigation Jump to search
Fowards Insp Rept 50-382/89-13 on 890522-26.No Violations or Deviations Noted
ML20245A941
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/15/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20245A943 List:
References
GL-88-17, NUDOCS 8906220288
Download: ML20245A941 (2)


See also: IR 05000382/1989013

Text

. . . _ . . . . . . . . . . _ _ . . _ _ _ _

'f

s

JUN l 51989

In Reply Refer To:

Docket: 50-382/89-13

Louisiana Power & Light Company

ATTN:

J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

New Orleans, Louisiana 70160

!

Gentlemen:

1

i

This refers to the inspection conducted by Messrs. T. O. McKernon and

R. V. Azua of this office during the period May 22-26, 1989, of activities

authorized by NRC Operating License NPF-38 for Waterford Steam Electric

F

i

Station, Unit 3, and to the discussion of our findings with Mr. J. R. McGaha

L

l

and other members of your staff at the conclusion of the inspection.

1

j

Areas examined during the inspection included followup of previous inspection

findings and the licensee's expeditious actions related to Generic Letter 88-17

(loss of decay heat removal). Within these areas, the inspection consisted of

'

selective examination of procedures and representative records, interviews with

-

personnel, and observations by the NRC inspectors.

The enclosed inspection report details our inspection of expeditious actions

addressed by Generic Letter 88-17 and those provisions taken with regard to

'

observations noted in the NRC letter to Mr. J. G. DeWease (LP&L) dated March 8,

!

1989. Your long-range programmed enhancements will be inspected during a

!

subsequent inspection.

'

Within the scope of the inspection, no violations or deviations were

identified,

We have also examined actions you have taken with regard to previously

i

identified inspection findings. The status of these items is identified in

'

paragraph 2 of the enclosed report.

l

Should you have any questions concerning this inspection, we will be pleased to

i

discuss them with you.

i

!

Sincerely,

f

8906220288 890625

$DR

ADOCK 050003B2

b. .

bc-

'"

J

PNu

'

I

James L. Milhoan, Director

1

Division of Reactor Projects

!

Enclosure:

(See next page)

)

RIV:RI:TPS*

RI:TPS*

C:TPS*

D:DRS+

D:D ~

'

TMcKernon:lm

RAzua

WSeidle

LJCallan

JLMilhoan

/ /89

/ /89

/ /89

/ /89

f //f /89

  • previously concurred

[60!

I t

- _ _ _ _ _ _ _

_

.

___. __ ___ _ _ ____-____ _ _ _ _ _ _

.

,e

.

Louisiana Power & Light Company

-3-

bec w/ enclosure:

bec to DMB (IE01)

.

bec distrib by RIV:

l

  • RRI
  • R. D. Martin, RA
  • Section Chief (DRP/A)
  • DRP
  • RPB-DRSS
  • MIS System
  • Project Engineer (DRP/A)
  • RSTS Operator
  • RIV File
  • DRS
  • D. Wigginton, NRR Project Manager (MS:

13-D-18)

l

'

Lisa Shea, RM/ALF

  • T. M. McKernon
  • W. Seidle
  • R. Azua
  • w/766