ML20245A558
| ML20245A558 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/17/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20245A559 | List: |
| References | |
| NUDOCS 8904250268 | |
| Download: ML20245A558 (2) | |
See also: IR 05000285/1989015
Text
g
y-_
--
,
. - - - -
-
-
- _ - - - -
- -- -
- -
[; .
,
t
4
7
,.
.
APR1 Tl989
a
l'
'
~In Reply Refer To:
Docket: 50-285/89-15
c.
,
Omaha Public Power District
ATTN:
Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney. Street.
Omaha, Nebraska. 68102
Gentlemen:
This refers'to the inspection conducted by Messrs. T. O. McKernon and M. E. Murphy
of this office during the period April 3-7, 1989, of activities authorized by
NRC Operating License DPR-40 for Fort Calhoun Station, and to the discussion of
our findings with Mr. W. G. Gates and other members of your staff at the
conclusion of the inspection.
. Areas examined during the inspection included startup physics tests and
followup to previous inspection findings. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The
' inspection findings are documented in the enclosed inspection report.
Within'the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. -The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
.
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-285/89-15
RIV:TPS *
TPS *
C:TPS *
D:
D:DRP
MEMurphy;1m
TOMcKernon
WCSeidle
JLMilhoan
LJCallan
/ /89
/ /89
/ /89
g
/89
g /l/ /39
- previously concurred
,-
-
_
-
--
- -
-
a
_-.
-
_
___ -
_
_
-
__
__
=
,
e
<
-
-
'
'
,
>.
.
Omaha Public Power Districti
-2-
'
cc'w/ enclosure:'
-l
Fort Calhoc., Station
' ATTN:
W. G. Gates, Manager.
P.O. Box 399
_ _
._
Fort Calhoun, Nebraska ' 68023
Harry H. Voigt Esq.
LeBoeuf, Lamb, Leiby & MacRae
'
1333-New Hampshire Avenue, NW
Washington, DC.-20036
Nebraska Radiation Control Program Director.
bec w/ enclosure: bec to DMB (IE01)-
bec distrib. by'RIV:
- R.D. Martin, RA
- RPB-DRSS
- SectionChief(DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Oper.itor
- Project Engineer (DRP/B)
.Lisa Shea, RM/ALF
- DRS
'*P. Milano, NRR Project Manager'(MS:
13-D-18)
i
- RRI
~
'*W.C. Seidle
l
- M.E. Murphy.
- T.O. McKernon-
- w/766
i
l
bE____ _____ __
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ . _ _ _ _
_ _ _ _ _ _ _ _ _
_ _ _ _