Forwards Insp Repts 50-424/89-11 & 50-425/89-13 on 890307-10 & 30-31.No Violations or Deviations Noted.Nrc Has Understanding That Util Will Perform Unit 2 Remote Shutdown Test W/Shift Crew of Four People
ML20244E192
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/10/1989
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20244E195 List:
References
NUDOCS 8904240338
Download: ML20244E192 (2)


See also: IR 05000424/1989011

Text

y

,

g

~

.

.-

'

APR 10 B89

-

.

.

Docket Nos.'50-424,'50-425

j

License.Nos.' NPF-68, NPF-79

.j

J

Georgia Power Company

ATTN:

Mr. W. G. Hair'ston, III

Senior Vice President -

!

1

Nuclear Operations

P. O. Box 1295

Birmingham, AL _3'5201

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-424/89-11 AND 50-425/89-13

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by P. T. Burnett on March 7-10 and 30-31,1989. - The inspection included a

review of activities authorized for your Vogtle facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff.

-l

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report.

Within

'

-these areas, the inspection consisted of selective examinations 'of procedures

.and representative records, interviews with personnel, and observation of-

activities -in progress.

Within the scope of the inspection, no violations or deviations were

identified.

As discussed in the enclosed report, we understand that you will perform the

Unit 2 ' remote shutdown _ test with a shift crew of four people, including one

senior reactor operator.

Performing the test with this level of staffing will

demonstrate your capability to safely shut the plant down from outside the

control room with the minimum size shift crew described in the Vogtle 2 FSAR.

Additional operators will be available to assist if needed. Please inform this

office prior to proceeding with the test if our understanding is not correct.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sin erel ,

Alber

F. Gibson

Division of Reactor Safety

i-

Enclosure:

(See Page 2)

(

8904240338 890410

PDR

ADOCK 05000424

)g

Q

PDC

-

?l

.

.

_

-

____ - - _

_ _ _ _

_

_

_

.

-'

'

.

.

.

Georgia Power Company;

12

i:

Enclosure:

NRC Inspection' Report-

cc w/ encl:

- R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P..D.. Rice, Vice President, Project,

.

Director

C. W. Hayes, Vogtle -Quality

.

Assurance Manager

G. Bockhold,-Jr., General Manager,.

Nuclear Operations

J. P. Kane, Manager; Licensing

and Engineering

.

J. A. Bailey, Project Licensing

'

Manager

B. W., Churchill, Esq., Shawi

Pittman', Potts and Trowbridge

D.' Kirkland, III, Counsel.

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

_

Nuclear Energy

. State of Georgia

bec w/ encl:

-.E. Reis, 0GC

J. Hopkins, NRR

M. Sinkule, RII

J. Zeiler, RII'

DRS Technical Assistant

NRC Resident Inspector

Document Control Desk

g

rig

RII

RII

RI

RII

[MVSinkule

ARHerdt

T urn

e

GABelisle

CA l'an

04//[f89

04/p/89

04//p/89

04/w/89

04/p /89

RII'/

RII

N

, eyes

.EWM

hoff

4//g/89

-

044 /89

_ ____-____ _ - -

~