. _ _ _ _ - _ _ _ _ _- -

~

Technical Specifications L-77 Research RemetEr Brieh== Youne University Included in this document are the technical specifications and the basis for technical specifications. These basis, which provide technical support for tne individual technical specifications, are included for information purposes only. They are not part of the technical specifications and do not constitute limitations or requirements to which the licensee must adhere.

1. Definitions 1.1. certified operators - A certified operator is sa individual authorized by the chartering or licensing organization to carry out the duties and responsibilities associated with the position requiring the certification.

1.2. channel - A channel is the combination of sensor, line, amplifier, and output devices which are connected for the purpose of measuring the value of a parameter.

1.3. channel check - A channel check is a qualitative verification of acceptable performance by observation of channel behavior. This verifica-tion may include comparison of the channel with other independent channels or methods measuring the same variable.

1.4. channel calibration - Calibration is an adjustment of the channel such that its output corresponds with acceptable accuracy to known values of the parameter which the channel measures.

1.5. operable - Operable means a component or system is capable of performing its intended function.

1.6. operating - Operating means a component or system is performing its intended function.

1.7. reactor operating - The reactor is operating whenever it is not secured or shutdown.

1.8. reactor secured - A reactor is secured when:

1.8.1. It cont ains insuf ficient fissile material or moderator present in the reactor, adjacent experiments or control rods, to attain criticality under optimum available conditions of moderation and reflection.

1.9. research reactor - A research reactor is defined as a device designed to support a self-sustaining neutron chain reaction for research, development, educational, training, or experimental purposes, and which may have provisions for the production of radio-isotopes.

1 G906200082 890612 PDR ADOCK 05000262 P FDC

1.10. shall, should and may - The word "shall" is used to denote a i requirement; the word "should" to denote a recommendation; and the word "may" to denote permission, neither a requirement nor a recommendation.

2. Safety Limits and Limiting Safety System Setting Safety Limit - Not applic able. The reactor shall remain secured.

l

3. Limiting Conditions for Operation Not applicable. The reactor shall remain secured.
4. Surveillance Requirements Specified surveillance actions shall be performed in accordance with the following schedule.

4.1. Control and safety system.

4.2. Applicability

The reactor facility.

4.2.1. Objective

To maintain surveillance for potential exposure to radiation.

4.2.2. Specifications

4.2.2.1. TLD dosimeters shall be checked by the commercial vendor quarterly. The report generated shall be reviewed by the Radiation Safety Officer quarterly.

4.2.2.2. Port able radiation survey instruments shall have a semiannual calibration.

4.2.3. Bases. Periodic quality assurance procedures should insure confidence that measurements and observations are correct.

4.3. Reactor Area.

4.3.1. Applicability. This specification pertains to the reactor facility.

4.3.2. Objective. To assure the radiation safety of the reactor area.

4.3.3. Specifications.

4.3.3.1. The fire alarm test frequency (NFPA 72d priority signaling systems) shall be on a biannual basis in accordance 2

with NFPA # 73E. Testing shall be performed by personnel from

. Physical Facilities.

4.3.3.2. The door locks and alarm systems shall be checked quarterly. ,

4.3.3.3. The shield water level shall be visually inspected annually. This requirement shall be void once the {

plutonium / beryllium source is removed from the reactor. ,(

4.3.3.4. The RSO shall conduct an annual visual inspection of the reactor structure for water leakage. This requirement shall persist as long as the shield tank is filled with water.

Any leakage, corrosion, or damage shall be corrected. -

4.3.3.5. The Radiation Safety Of ficer or his designated -

representative shall make a radiation survey of the area s semiannually.

4.3.3.6. Two TLD dosimeters shall be placed in the nuclear (=

laboratory and one TLD dosineter shall be placed immediately 1 outside the nuclear facility in order to maintain a record of potential exposure levels inside and immediately adjacent to -=

l the facility.

4.3.4. Basis

The fuel has been removed, and the power to the reactor has been cut. The only persons allowed unaccompanied access to the f acility are the Radiation Safety Officer and the Facility Chief. Currently the building housing the reactor is occupied less than five hours per quarter. Under these conditions the rate of exposure would have to be in excess of 200 mrem / hour in order to cause those individuals most heavily exposed, to accumulate more than 1.25 rem / quarter. The highest rate of exposure recorded by TLD monitors in the reactor f acility during 1988 was 23 mrem / quarter.

The radiation exposure instrument currently used in surveys is a Victoreen 470 ionization chamber. This instrument is capable of detecting exposures of as low as 0.1 mrem /hr which is approximately three orders of magnitude less than the exposure rate necessary to produce an overexposure to the most frequent occ u pant . Thus it is reasonable to suppose with the current static condition of the facility that first, no significant exposure can occur in the facility unless there is physical manipulation of the Pu/Be source, and second, if there were a change in status that change would be readily detectable well below the level at which serious exposure would be anticipated with the current monitoring system.

5. Design Features:

5.1. Reactor

The reactor is an L-77 research reactor. The fuel has been removed and shipped of f site and the power to the reactor has been cut.

The beam ports shall be locked except upon approval of RSC to conduct 3

i

measurements pursuant to decommissioning activities.

5.2. Reactor Facility: The reactor is located in the Nuclear Laboratory.

This is a dedicated facility located on the southwest portion of the Brigham Young University campus. The building is of concrete and masonry construction. Unaccompanied access is limited to the Radiation Safety _

Officer and the Reactor Facility Chief or Unitzersity Police. Any other i access shall be under the supervision of the RSO or the Facility Chief.

The doors shall remain locied and the alarm engaged whenever there are no occupants in the building.

5.3. Anticipated chacses in configuration: Under the Possession Only License the major anticipated configuration change may be the removal of the plutonium / beryllium source. Until the source is removed, the shielding water shall be maintained at a level no less than one foot below the top edge of the shielding tank.

6. Administrative Controls:

6.1. Organization

(see figure 1) 6.1.1. President. The president is the Chief Administrative Officer responsible for the University. As such he shall have ultimate responsibility for the operation and management of the nuclear reactor.

6.1.2. Executive Vice President (EVP) . The Executive Vice President reports directly to the President and shall have direct responsibility for the reactor.

6.1.3. Radiation Safety Officer. The Radiation Safety Officer (RS0) shall be appointed by the Executive Vice President with the advice of the Chairman of the Radiation Safety Committee. He shall be responsible to the EVP for the day-to-day administration of the radiation safety program and serves as the Secretary of the Radiation Safety Committee. lie prepares the University's Radiation Safety Manual. The Radiation Safety Officer shall also be responsible for preparing, for the signature of the Chairman of the Radiation Safety Committee, reports of all reportable occurrences to the ap,*;opriate regulatory agency and for ensuring that appropriate follow up action is taken.

6.1.4. Training Requirements. At least one member of the Radiation Safety committee shall have a PhD in physics. The Radiation Safety Of ficer shall have a minimum of one year experience in working with radiation and radiation safety.

6.1.5. Radiation Safety Commit tee. The members of this committee shall be appointed by the Executive Vice President. This committee shall be composed of four members, to include: the Radiation Safety Of ficer, a f aculty member from the Physics Department, a f aculty member from the College of Biological Science, and a member from the 4

Campus Safety Office. The Radiation Safety Committee (RSC) shall meet quarterly. 3 of 4 members shall constitute a quorum. The minutes shall be recorded and sent to the committee members. The minutee shg11 be reed and approved at the etart of each meeting. The RSC reports directly to the Executive Vice President.

, .=

The Radiation Safety Committee shall have both review and audit functions with regard to the Reactor Facility. The RSC shall advise

{

the Reactor Administrator as well es level one management on all L_

matters pertaining to reactor facility safety.

6.1.5.1. Any changes in equipment, procedures, facilities or license including these technical specifications shall be reviewed by the RSC.

6.1.5.2. Audit Function: The records of safety surveys and deficiency reports shall be examined by the Radiation Safety -

Commit t ee. Audits shall be performed on an annual basis.

6.1.5.3. The RSC shall review surveillance performed in compliance with technical specifications.

=

6.2. Procedures

Procedures shall be adequate to assure both the safety -

and adequate security of the reactor. Substantive changes to the procedures shall be made only with approval of the RSC. Temporary changes to procedures which do not change their original intent may be made by the .

RSO. All such temporary changes shall be documented and submitted to subsequent review by the RSC. Procedures shall be in effect for the following items:

6.2.1. Emergency procedures.

6.2.2. Security.

6.2.3. Calibration.

6.2.4. Surveys.

6.2.5. Surveillance.

6.3. Required Actions:

6.3.1. Action to be taken in the event of an occurrence defined in Sect ion 6.4.2.1.

6.3.1.1. Corrective action shall be taken to return condi-tions to normal.

6.3.1.2. All such occurrences shall be promptly reported to the Level 2 authority or designated alternates. -

5

6.3.1.3. All such occurrences including action taken to prevent or reduce the probability of a recurrence shall be reviewed by the Radiation Safety Committee.

6.4. Reports. All written reports shall be sent within the prescribed interval to the NRC, Washington, D.C. 20555, Attention: Document Control /

Desk, with a copy to the Regional Administrator, Region IV.

6.4.1. Operating Reports. Routine annual reports covering the activities of the reactor f acility duriny the previous calendar year shall be submitted to the appropriate NRC of fice by March 31 of the subsequent year. The following information shall be included in the report.

6.4.1.1. Tabulation of major preventive and corrective maintenance operations having safety significance.

6.4.1.2. Tabulation of major changes in the reactor facility proc edure s.

6.4.1.3. The results of any environmental surveys performed cutside the f acility.

6.4.1.4. A summary of radiation exposures received by ==-

facility personnel and visitors in any one year including the dates and times of significant exposures (above 500 mrem).

6.4.1.5. A summary of any ef fluents or discharges from the reactor f acility.

6.4.2. Special Reports.

6.4.2.1. Prompt Notification with Written Follow up. The types of events listed below shall be reported as expeditiously +

as possible by telephone and confirmed by telegraph, mail-gram, or f acsimile transmission to the Director of NRC Region IV or his designated representative no later than the first work day following the event, with a written follow up report within two weeks to the Document Control Desk and the Regional Administrator. Information provided shall contain narrative material to provide completed explanation of the circumstances surrounding the event.

6.4.2.1.1. Unanticipated releases of radioactivity to the environment exceeding 500 times the limits specified for such materials in Appendix B Table II of 10 CFR part 20, 6.4.2.1.2. Exposure of personnel exceeding the limits as stated in 10 CFR 20.403 (b) 1.

6.4.2.1.3. Damage to, or thef t of, the sealed source.

6 m

6.4.3. Reports Within 30 Days. The types of events listed below shall be reported to the Document Control Desk and the NRC Region IV Administrator or his designated representative within 30 days of .

their occurrence.

6.4.3.1. Any change in the facility organization.

6.4.3.2. An observed inadequacy in the implementation of administrative or procedural controls such that the inadequacy causes or could have caused an unsafe condition with regards to reactor maintenance.

6.5. Records

Records of the following activities shall be maintained and retained for the period specified below. The records may be in the form of logs, data sheets, or other suitable forms. The required information I i may be contained in single, or multiple records, or a combination thereof. . - =

6.5.1. Records to be Retained for a Period of at least five years.

6.5.1.1. Normal reactor f acility operations.

6.5.1.2. Principal maintenance operations.

6.5.1.3. Reportable occurrences.

6.5.1.4. Surveillance activities required by the Technical Specif ica t ion s.

6.5.1.5. Reactor f acility radiation and contamination surveys stere required by applicable regulations.

6.5.1.6. Special Nuclear Material inventories, receipts, and shipments.

6.5.1.7. Approved changes in operating procedures.

6.5.1.8. Records of meeting and audit reports of the Radiation Safety Commit tee.

s 6.5.1.9. Scaled source leak test results.

6.5.2. Records to be Retained for Five Years or for the Lifetime of the Reactor Facility whichever is Greater (Note: Annual reports may be used where applicable as records in this section).

6.5.2.1. Gaseous and liquid radioactive effluents released to the environment.

7

4 6.4.2.2 As built drawings.

8

'-w 4 . ,

Figure 1 Organization _ Chart University President Executive Vice-President Radiation Safety Radiation Safety Officer Committee Facility. Administrator Dean of the College of Physical and Mathematical Science Facility Chief