Discusses Insp Rept 50-302/89-01 on 890101-27 & Forwards Notice of Violation.Response Should Address Violations & Programmatic Problems in Engineering/Technical Support SALP Functional Area
ML20244D897
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/13/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20244D899 List:
References
NUDOCS 8904240190
Download: ML20244D897 (2)


See also: IR 05000302/1989001

Text

- - _ _ - _ - - - - _ _ - - - _ _ __ _ ._

-- - _ - - - . _- - - - _ _ _ _ _

f,i

r . .

..

.

.

h

..

APR 131989

l

Docket No. 50-302

ls License No. DPR-72

F1orida Power. Corporation

Mr. W. S. Wilgus, Vice President,

Nuclear Operations

ATTN: Manager, Nuclear Operations Licensing

P. O. Box 219-NA-21

Crystal River, 'FL 32629

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-302/89-01)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

.P. Holmes-Ray on January 1 27, 1989. The inspection included a review of the

circumstances ' surrounding improperly sized ASCO solenoid valves installed in

the Instrument Air system. The report documenting this inspection was sent to

you by letter dated February 17, 1989. As a result of this inspection, failures

to . comply = with NRC regulatory requirements were identified and NRC concerns

relative to the inspection findings were discussed in an Enforcement Conference

held on March 6,1989.

The violations -described in the enclosed Notice of Violation involved failure

to meet. the requirements of Technical Specification 3.6.3.1 and failure to

promptly idantify and correct conditions adverse to quality.

In accordance with the " General Statement of Policy and Procedure for NRC

Enforcement Actions," 10 CFR Part 2, Appendix C (1988) (Enforcement Policy),

the violations described in the enclosed Notice have been categorized as

> Severity Level IV problems.

The violations described in the anclosed Notice involve your identification

of a discrepant condition and failure to take proper corrective action for

approximately 60 days. At the Enforcement Conference, you attributed the root

cause to be inadequate training in that an engineering supervisor did not

recognize the safety significance of the discrepant condition. These viola-

tions are further examples of programmatic problems in the Engineering / Technical

Support SALP functional area for which you recently received a Category III.

Your response to this Notice should address both the violations and the larger

programmatic problems.

You are required to respond to this letter and the enclosed Notice and should

-follow the instructions. specified therein when preparing your response. In

your response, you should document the specific actions taken and any

additional actions you plan to prevent recurrence.

890424019o 3904 3 2

ADDCK O

gDR PDC gg

.

W ~

__ _____

-

.

.

l

l .

'

Florida Power Corporation 2 APR 137ggg

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Sincerely,

Original signed by

Stewart D. Ebneter

Regional Administrator

Enclosure:

Notice of Violation

cc w/ encl:

G. L. Boldt, Vice President,

Nuclear Production

A. H. Stephens, General Counsel

R. C. Widell, Director, Nuclear

Operations Site Support

P. F. McKee, Director, Nuclear

Plant Operations

State of Florida

J. Lieberman, OE

bcc w/ encl:

NRC Resident Inspector

Document Control Desk

9

RII /

Ril Rg RIl

R1 'i RI 84

G enk ns eyes

KPoertner:tm RCrl njak ilson ML r st

/g/89 ji/89 /89 04//0/89 04//(/89

- _ _ _ _ - _