Provides Guidance on Methods for Containment Integrated Leak Rate testing.Point-to-point & Total Time Methods Only Acceptable Methods Approved by Staff.Mass Point Method May Be Used on Interim Basis
ML20244D778
Person / Time
Issue date: 04/01/1986
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Partlow J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20244D710 List:
References
TAC-52665, NUDOCS 8604110058
Download: ML20244D778 (2)


Text

- - _ _ -

Ret. 2 I- *.-

James G. Part1rv, Director Division of" Inspection Programs MEN)RANDUM FOR:

0f fice of Inspection and Enforcement Darrell G. Eisenhut, Deputy Director Of fice of Nuclear Reactor Regulation FROM.

IDAN t CONTA1W,ENT INTEGRATED LEAK RATE TEST!NO (

$UBJECT:

ON TE5ilHO METHODS 986, there appears to be a As indicated in yeer memorandum dated February ptable CILRT methods associated Appendix J which have been approved to date.necessary to review h

Appendix J, Section 711. A.3(a), are that all CILRT5 l Standard (ANSI) requirements.

accordance with the provisions of the American NationaThis acceptable methods related to leak rate computation.

These are the only acceptable methods officially N45.4-1972...".

In 1981, ANS!/ANS-56.8 was issued with the intent and the " Total Time" methods.

This proposed The staf f has not approved this revision.

approved by the staff.

~

new standard has been considerably expanded an replace N45.4-1972.

i t" method One of the changes is the introduction of the " sass po n associated with a minimum test duration of B hours.

staff has taken two

=

version.

h Based on the introduction of the " sass point" sethod, t eThe firs The staff believes that parallel approaches towards implementation.

be used in the interir, d

until the more formal review process is complete.t provided the CILRT duration is at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Testing", is k

Draf t Regulatory Guide M5 021-5, " Containment System Lea currently under internal review along with propose better stabilization d for this sinism The approach in this draf t guide would eliminate the neeThe of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration f or the C]LRT on the basis that er, are uncertain.

criteria would be developed for future tests.

of both the draf t guide and Appendix J revision tion of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> "eass point" sethod.

should be applied for CILRT evaluations utilizing the

/

\\

O NBD e

r,m

y -- -_- - ___ __ _

l c;.

.2 James G. Partlow t

this topic is considered appropriate, contac

'If further discussion on127626.

'Mr.. Jack Kudrick,-

D.h:WC 6; Darrell G. Eisenhut Deputy DirectorD R. Bernero cc:

R. k'. Houston G. Laines B. D. Liaw J. Milhoan J. 5hapaker

1. Speis D. Crutchfield E. Rossi D15TRIBUT10N

'3hMAL F 1LL PSB R/F J. Kudrick

'8. D. Liaw R. Le11std.

W. Johnston G. Lair.as R. Bernero D. Eisenhut

5. McNeil

', t i.'

y s' s *.

g.'..e

.T*-

,,t p.,

  • M :v f l

9 sc

(',

E PSE: DBL +

t.,

si

~

.Kudrick:yef

  • 5ee Prtvious Sheet,(or Concur g e Ath BWR:pBL : p.5Wp 't: D i

7:..DEisen 4 A.W'w...(g......:...e,v.46rnertg:.......- -

LBt.FWR.B 1, :

l 3/ /7 /86 H1 A E5:PpfR.

a

.<.:....MA)..:..k':

.:..........h:....lMs

E5
W hnston : GL

~ : F55: DBL *

I/7 /.).L

( %: R8a'dt d

'3/tA/86 3/tN.

8_

86

.:............:.....A.....:...........

. LGHulman 3/Ot /86

3/;./86 NN2h~3/*A /86-----

~ --