James G. Part1rv, Director Division of" Inspection Programs MEN)RANDUM FOR:
0f fice of Inspection and Enforcement Darrell G. Eisenhut, Deputy Director Of fice of Nuclear Reactor Regulation FROM.
IDAN t CONTA1W,ENT INTEGRATED LEAK RATE TEST!NO (
$UBJECT:
ON TE5ilHO METHODS 986, there appears to be a As indicated in yeer memorandum dated February ptable CILRT methods associated Appendix J which have been approved to date.necessary to review h
Appendix J, Section 711. A.3(a), are that all CILRT5 l Standard (ANSI) requirements.
accordance with the provisions of the American NationaThis acceptable methods related to leak rate computation.
These are the only acceptable methods officially N45.4-1972...".
In 1981, ANS!/ANS-56.8 was issued with the intent and the " Total Time" methods.
This proposed The staf f has not approved this revision.
approved by the staff.
~
new standard has been considerably expanded an replace N45.4-1972.
i t" method One of the changes is the introduction of the " sass po n associated with a minimum test duration of B hours.
staff has taken two
=
version.
h Based on the introduction of the " sass point" sethod, t eThe firs The staff believes that parallel approaches towards implementation.
be used in the interir, d
until the more formal review process is complete.t provided the CILRT duration is at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Testing", is k
Draf t Regulatory Guide M5 021-5, " Containment System Lea currently under internal review along with propose better stabilization d for this sinism The approach in this draf t guide would eliminate the neeThe of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration f or the C]LRT on the basis that er, are uncertain.
criteria would be developed for future tests.
of both the draf t guide and Appendix J revision tion of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> "eass point" sethod.
should be applied for CILRT evaluations utilizing the
/
\\
O NBD e
r,m
y -- -_- - ___ __ _
l c;.
.2 James G. Partlow t
this topic is considered appropriate, contac
'If further discussion on127626.
'Mr.. Jack Kudrick,-
D.h:WC 6; Darrell G. Eisenhut Deputy DirectorD R. Bernero cc:
R. k'. Houston G. Laines B. D. Liaw J. Milhoan J. 5hapaker
- 1. Speis D. Crutchfield E. Rossi D15TRIBUT10N
'3hMAL F 1LL PSB R/F J. Kudrick
'8. D. Liaw R. Le11std.
W. Johnston G. Lair.as R. Bernero D. Eisenhut
- 5. McNeil
', t i.'
y s' s *.
g.'..e
.T*-
,,t p.,
- M :v f l
9 sc
(',
E PSE: DBL +
t.,
si
~
.Kudrick:yef
- 5ee Prtvious Sheet,(or Concur g e Ath BWR:pBL : p.5Wp 't: D i
7:..DEisen 4 A.W'w...(g......:...e,v.46rnertg:.......- -
LBt.FWR.B 1, :
l 3/ /7 /86 H1 A E5:PpfR.
a
.<.:....MA)..:..k':
.:..........h:....lMs
- E5
- W hnston : GL
~ : F55: DBL *
- I/7 /.).L
( %: R8a'dt d
'3/tA/86 3/tN.
- 8_
86
.:............:.....A.....:...........
. LGHulman 3/Ot /86
- 3/;./86 NN2h~3/*A /86-----
~ --