ML20244C938
| ML20244C938 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 06/05/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20244C941 | List: |
| References | |
| NUDOCS 8906150216 | |
| Download: ML20244C938 (2) | |
See also: IR 05000298/1989016
Text
. - _ _ _ _ _ _ _ _ _ _ _ _
--
'
- .
.
In. Reply Refer To:
Docket: 50-298/89-16
Nebraska Public Power District
ATTN: George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
Columbus, NE 68602-0499
Gentlemen:
This refers to the inspection conducted by Mr. L. T. Ricketson of this office
during the period May 1-5, 1989, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our
findings with Mr. G. R. Horn and other members of your staff at the conclusion
of the inspection on May 5, 1989.
Areas examined during the inspection included portions of the radiation
protection program. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
and observations by the NRC inspector. The inspection findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The rrsponse directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
@
,
J. L. Milhoan, Director
Division of Reactor Projects
Enclosures:
(see next page)
M
- RIV:FRPS
- C:FRPS
- C:RPB
- D:DRSS
D:D f/
LTRicketson/tw
REBaer
BMurray
ABBeach
JLMilhoan
/ /89
/ /89
/ /89
/ /89
4 /f/89
- previously concurred
8906150216 890605
~
l
k
ADOCK 05000298
G
PNV
'
..
_-__ -
.-
_.-
,
.
.
.
.
.
l
l
Nebraska Public Power District
- 2.-
1
.
Enclosures:
1.
Appendix A.- Notice of, Violation
i
2.
Appendix B - NRC Inspection Report
50-298/89-16
-
3.
Procedures Reviewed
4
cc w/ enclosures:
Cooper Nuclear Station
I
ATTN: Guy Horn, Division Manager
of Nuclear Operations
P.O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control. Program Director
bec to DMB (IE06)
'
bec distrib. by RIV:
j
- RRI
- R. D. Martin, RA
{
- Section Chief (DRP/C)
Lisa Shea, RM/ALF
- RPB-DRSS
- MIS System
l
- RIV File
- Project Engineer (DRP/C)
i
- RSTS Operator
- DRP
i
l
- P. O'Connor, NRR Project Manager (MS:
13-D-18)
.I
,
i
- DRS
G. F..Sanborn, EO
j
- A. B. Beach
- R. E. Hall
l
- B. Murray
- R. E. Baer
.i
- L. T. Ricketson
{
- w/766
'
l
l
'
!
i
l
!
L----_--_----
- - - - -