Notice of Violation from Insp on 890501-05.Violation Noted:Individual Passed Section of Electrical Conduit from Controlled Area in RHR HX Room a to Individual Outside Controlled Area W/O First Performing Survey
ML20244C942
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/05/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20244C941 List:
References
50-298-89-16, NUDOCS 8906150217
Download: ML20244C942 (1)


Text

- - - . _ _ _ _ ___ __ __

... =,- .*

APPENDIX A NOTICE OF VIOLATION .

Nebraska Public Power; District Docket: 50-298 Cooper Nuclear Station Operating' License: DPR-46

. During an' NRC inspection conducted 'May- 1-5, 1989, a' violation of_NRC ,

requirements was identified. The violation involved the failure to follow-procedures as required by Technical Specification (TS). In accordance withLthe-

" General ~ Statement of Policy and Procedure for NRC Enforcement: Actions,".10.CFR Part 2, Appendix C (1988), the violation is listed below:

Failure to Follow procedures TS 6.3.4 requires that " Radiation control procedures. shall. be mainta'ined' and made available to all station personnel, The'se. procedures shall showo permissible radiation exposure, and shall'be consistent with.the.

requirements of 10 CFR 20."

Health Physics Procedure 9.2.3,.Section VIII.B.1 requires an instrument and/ smear survey prior to removal of equipment and tools from'a controlled area.

Contrary to the above, the NRC inspector observed, on May 4,:1989, an -

individual pass a section of electrical conduit from a controllad area in the Residual Heat Removal Heat Exchanger Room A to an indivicaal' outside the controlled area without first performing or' having performed.a survey to determine the level of radioactive contamination on'the conduit.

Additionally, the NRC inspector observed, on the same' day, unsurveyed sections of steel hangers which were partially' removed from the controlled area in Residual Heat Removal Heat Exchanger. Room B. .

el This is a Severity Leve! V violation. (Supplement IV)(298/8916-01)

Pursuant to the provisions of 10 CFR 2.201, Nebraska Public Power. District is q hereby required to submit to this office, within 30 days of the date'of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted,.

(2) the corrective steps which have been taken and.the.results achieved,-

(3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, ,

consideration will be given to extending the response time. i l

Dated at Arlington, Texas, this 5th day of June 1989.

j l

@9 8906150217 09thb05 i PDR ADDCK OtKNDO298 i e PNU j