ML20244C408

From kanterella
Jump to navigation Jump to search
Requests Review of Encl Draft risk-based Insp Guide for Proprietary Info & Comments & Suggestions.Meeting Will Be Conducted Re Insp of Activities & Review Draft.W/O Encl
ML20244C408
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/23/1989
From: Tourigny E
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8904200197
Download: ML20244C408 (2)


Text

.- - -__ _ _ . .__ - _

~

  • t t

March 23, 1989

. Doc ket' Nos . : '50-325- llTION(w/oencl):.

p: .50-324 ' .' g.'STR y

..ocal' PDR '-

E Mr. E. E. Utley - , . PD21 r/f .

N . Senior Executive Vice' President' S. Varga (14E4)

. Power Supply and' Engineering.' G. Lainas- -

and Construction E. Adensam P.~0. Box 1551 P. Anderson Raleigh, North' Carolina' 27602 E. Tourigny-

. 0GC.

Dear Mr.'Utley:

S.'Long(10A2)

L -

H. Dance, A.' Belisle, W. Ruland, RII-m

Subject:

. Review of Draft Brunswick Risk-Based Inspection Guide for Proprietary Information ,

The. enclosed draft Risk-Based Inspection Guide' (RIG) has' been produced .to

. assist NRC inspectors in focusing on risk-significant. aspects of Brunswick Steam Electric. Plant design and operation. Your. Brunswick PRA was used in

? preparing the RIG. Because you have marked your PRA as proprietary

< information, we have marked the draft RIG as proprietary. pending your review

of its content.' We do- not believe that we have included any infonnation in '

this RIG .that .is proprietary in nature, and.would like to treat the final version as nonproprietary. . Therefore, we requestithat you review the draft

~

RIG and inform us of any contents that you'believe are' proprietary.

We would also'be. pleased to receive any technical comments or suggestions that

you care to make on the draft. Our Resident Inspector at Brunswick is -

receiving a copy for his review,: also. Before finalizing the RIG, one of the authors and NRC's Project Engineer intend to meet with the Resident on site' to; conduct inspection activities and review the draft. They could meet with your

. staff at that time, if you are interested. Your staff should also feel free-to contact our Project Engineer, Steve Long, at any time to discuss the draft or the project. He can be reached at -(301) 492-3162.

Thank you for your cooperation in providing the necessary information' to produce this. RIG.and for reviewing the draft.

t 0 8904200197 890323 PDR ADOCK 05000324

f. PDC J

~ - .. ,

b'.f ' i ,

Mr' E. E. Utley -

. 2

.The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore,' OMB clearance is r.ot required under P.~L.96-511.

Sincerely,

/N Eomond G. Tourigny, Senior Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear. Reactor Regulation

Enclosure:

As stated cc: See next page A

0FC :PRAB:DREP :LA:PD #iPD21:D R :0 C 6, :D: 1 RPR  : : :

3DRPR

. ___.. . ....... g..___:. ________:._..._______.

!......:______.....__..:_g.hderhnhy3ry, NAME :SLong: jaw /f tPA  : ny B. 1 ee :EA nsam  : : :

DATE :3/2t /89 :3/M89 :3/t2/89 :3/j@89  :

. 3/,'V89 w i

l l

l

- - - - - - _ - _ _-