ML20244C408
| ML20244C408 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/23/1989 |
| From: | Tourigny E Office of Nuclear Reactor Regulation |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8904200197 | |
| Download: ML20244C408 (2) | |
Text
.-
~
t March 23, 1989 t
'50-325-llTION(w/oencl):.
p:
.50-324
' ' g.'STR
. Doc ket' Nos. :
y
..ocal' PDR '-
E Mr. E. E. Utley -
. PD21 r/f.
N
. Senior Executive Vice' President' S. Varga (14E4)
. Power Supply and' Engineering.'
G. Lainas-and Construction E. Adensam P.~0. Box 1551 P. Anderson Raleigh, North' Carolina' 27602 E. Tourigny-0GC.
S.'Long(10A2)
Dear Mr.'Utley:
L H. Dance, A.' Belisle, W. Ruland, RII-
Subject:
. Review of Draft Brunswick Risk-Based Inspection Guide for m
Proprietary Information The. enclosed draft Risk-Based Inspection Guide' (RIG) has' been produced.to
. assist NRC inspectors in focusing on risk-significant. aspects of Brunswick Steam Electric. Plant design and operation.
Your. Brunswick PRA was used in
?
preparing the RIG. Because you have marked your PRA as proprietary information, we have marked the draft RIG as proprietary. pending your review
- of its content.' We do-not believe that we have included any infonnation in '
this RIG.that.is proprietary in nature, and.would like to treat the final version as nonproprietary.. Therefore, we requestithat you review the draft
~
RIG and inform us of any contents that you'believe are' proprietary.
We would also'be. pleased to receive any technical comments or suggestions that
- you care to make on the draft. Our Resident Inspector at Brunswick is -
receiving a copy for his review,: also. Before finalizing the RIG, one of the authors and NRC's Project Engineer intend to meet with the Resident on site' to; conduct inspection activities and review the draft. They could meet with your
. staff at that time, if you are interested. Your staff should also feel free-to contact our Project Engineer, Steve Long, at any time to discuss the draft or the project.
He can be reached at -(301) 492-3162.
Thank you for your cooperation in providing the necessary information' to produce this. RIG.and for reviewing the draft.
t 0 8904200197 890323 PDR ADOCK 05000324 f.
PDC J
~ -
b'.f ' i,
Mr' E. E. Utley -
2
.The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore,' OMB clearance is r.ot required under P.~L.96-511.
Sincerely,
/N Eomond G. Tourigny, Senior Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear. Reactor Regulation
Enclosure:
As stated cc: See next page A
3DRPR
- iPD21:D R :0 C 6,
- D:
1 RPR 0FC
- PRAB:DREP
- LA:PD g..___:.
!......:______.....__..:_g.hderhnhy3ry, NAME :SLong: jaw /f tPA ny B. 1 ee
- EA nsam DATE :3/2t /89
. 3/,'V89
- 3/M89
- 3/t2/89
- 3/j@89 w
i l
l l
- - - - - - _ - _ _-