Text
_.
.
I
[
l
'
.
-
.
.
JM OE
j
In Reply Refer To:
Docket: 50-285/89-17
!
Dmaha Public Power District
ATTN:
Mr. Kenneth J. Morris
Division Manager - Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell, T. Reis, and
T. O. McKernon of this office during the period April 1-30, 1989, of activities
authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to
the discussion of our findings with Mr. L. T. Kusek, Acting Plant Manager, and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included review of previously identified
items; operational safety verification; plant tours; monthly maintenance
observations; monthly surveillance observations; security observations;
radiological protection observations; and in-office review of periodic,
special, and nonroutine event reports. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The
inspection findings are documented in the enclosed inspection report.
Within the sccpe of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
'
discuss them with you.
Sincerely,
Original Signed By
g61gQ $$$o jb
km/>rc/ 7 hek6r
James L. Milhoan, Director
,
a
Division of Reactor Projects
cc w/ enclosure:
(see next page)
- RIV:RI
- DRP/B
- C:DRP/B
D;DP.FdM
TReis/nc
PHHarrell
RPMullikin
TFWesterman
J}.MiJhoan
05/12/89
05/12/89
/ /89
/ /89
6f(e,/89
l
- previously concurred
I\\
.
- -- - -_____-_.
--
5
-
.
.
,
,
..
Omaha Public Power District
-2-
<
'
Enclosure:
Appendix - NRC Inspection Report
50-285/89-17
cc w/ enclosure:
G. R. Peterson, Manager
Fort'Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, tamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D.C.
20036
Nebraska Radiation Control Program Director
-b'cc to DMB (IE01)
bec distrib. by RIV:
R. D. Martin, RA
- MIS System
.'
- Section Chief (DRP/B)
- DRP
- RIV File
- Project Engineer (DRP/B)
- RSTS Operator
- P. Milano, NRR Project Manager (MS 13-D-18).