Confirms 890522-26 Dates for Special Insp to Evaluate Plants for Compliance W/Sections Iii.G,Iii.J & Iii.L of App R to 10CFR50.Latest Rev to Piping & Instrumentation Flow Diagrams for Hot & Cold Shutdown Sys Requested by 890424
ML20244A848
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/30/1989
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8904180225
Download: ML20244A848 (2)


Text

_

( ,4 .

P MAR 3 01989 i4 V.

Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R, SECTIONS III.G.,

III.J. AND III.L. AND ASSOCIATED FIRE PROTECTION FEATURES - BRUNSWICK PLANT, DOCKET NOS. 50-325 AND 50-324 This letter is to confirm the dates of May 22-26, 1989, for the special

- inspection of Brunswick which were established during the telephone conversation L

of March . 17, 1989,. between W. E. Enzor, of_ your staff, and H. C. Dance of

.this office.

The purpose of this' inspection is to evaluate Brunswick Units 1 and 2 for compliance with Sections III.G, III.J. and III.L, of Appendix R to 10 CFR 50.

'This will be a team type inspection composed of personnel from the NRC Regiori' II Office.

In ' order for us to properly prepare' and perform this type of comprehensive ,

and complex inspection, we request that you provide this office with the latest . '

revision to the following additional, information by April 24, 1989:

1. Piping and instrumentation (flow) diagrams for hot shutdown .and cold

~

shutdown systems and alternative or dedicated shutdown.

2. Plant layout and equipment location drawings which identify the physical .

plant locations of hot shutdown and cold shutdown equipment.  !

3. Color coded marked-up electrical raceway drawings which identify the -

cable routing of power and control circuits for those plant systems necessary to achieve and maintain hot shutdown.

4. Single line AC and DC power and control electrical distribution diagrams.
5. Plant layout drawings which identify fire area delineation and fire protection equipment locations.
6. Marked-up plant layout drawings which identify the locations of emergency lighting units.

8904180225 890330 ADOCK 05000324, I\

PDR g PNU

.2F'I  !

l Carolina Power and Light Company 2

W 0W -

7. Associated circuit analysis.
8. Plant . operating procedures which describe normal and cold shutdown from inside the ~ control room, emergency hot and cold' shutdown from emergency: control stations outside and independent of the control .. room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.

i

9. Fire damage control and repair procedures for cold shutdown systems.

In addition to the information requested above, copies of.any other analysis and/or evaluation which demonstrate compliance to Sections ~III.G, III.J and III.L of Appendix R should be available on site for review during this inspection. Appropriate personnel, knowledgeable with respect to those plant systems required for. safe shutdown and their capabilities, should be available at the site during this inspection. Also, we request that your staff make the necessary arrangements to permit . team members ready access to the radiologically controlled areas of the plant if necessary.

Your cooperation with us during this inspection will be appreciated. Should this letter, we will be glad to discuss them you with have you. :any- questions Contact G. Wiseman 'concerning(404) at 331-5678.

Sincerely, I original Signed by l Charles W. Hehl /for i Luis A. Reyes, Director Division of Reactor Projects

.cc: R. B. Starkey, Jr. , Manager Brunswick Nuclear Project J. L'. Harness, Plant General Manager State of North Carolina bec: D. Kubicki, NRR  ;

NRC Resident Inspector DRS Technical Assistant Document Control Desk x

4

- ~,

RI , RI RII , RII RII

'7'; hft fDWard er/ Coni n G

CJul an HDancf/ - AG -

03/p[//89 03/g//89 03/;)/89 03/q/89 03/a7/89 l

_ _ _ _ _ - _ _ _ _ - - _ - - - - - _ _ _ - _