ML20244A570

From kanterella
Jump to navigation Jump to search

States Inability to Respond to Positions 1.g to 5.b of Branch Technical Position Lsb 6-4 by 790401.Requests 60-day Extension to 790601,in Order to Provide Accurate Assessments of Containment Purging & Determine Proper Corrective Action
ML20244A570
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/30/1979
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-08291, TAC-8291, NUDOCS 7904100312
Download: ML20244A570 (1)


Text

- _ . ._

n .. .

y p

[ f M.)

be[ by PORTLAND 01:NERAL ELE CTRIC COMPANY 121 S. W. S AI.M ON STACET

// [2[7 PORTLAN o. Q AEoCN 97204

c. J. S A C CH L .

4s s.o r4e wc s == ssio so March 30, 1979 Trojan Nuclear Plant Docket 50-344 License NPF-1

ai Director of Nuclear Reactor Regulation ATTN
Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

1 In our response dated January 3, 1979 to your letter of November 28, 1978, regarding Containment purging during normal Plant operation, we committed to provide responses to two items by April 1,1979.

These two items were positions 1.g and 5.b of Branch Technical Position CSB 6-4.

)

Although we have completed the analyses required by these two items of the Branch Technical Position, <e have not completely assessed .

the results nor determined the corrective action necessary. We there- f fore cannot meet the previously committed-to-date of April 1. We .!

would propose a 60-day extension, until June 1, 1979, to provide this -l information.  ;

i As stated in our letter of January 3, we are limiting our purges of the Containment to less than 90 hr per year. We have restricted purging l to those occasions when it is only felt to be necessary for personnel '!

exposure reduction and purging is not being conducted for temperature l or humidity control. i s

Unless info:med otherwise, we will assume this approach is satisfactory, {

and we will provide the additional responses by June 1, 1979. j Sincerely, 70i o H lc o 3 t'l- , j l

/f 8 '

' 1 y ep+

c: Director \

State of Oregon Department of Energy i

'l

"M e -e.o = e, w ,em mir w $h.* w %