1 CPERATING DATA FEPORT j
DOCKET 50-413 DATE 9-15-97 OPERATING STATUS COMPLETED BY J. A. Feavis TELEPHONE 704/373-7567
- 1. Unit Nase: CATA4BA 1
- 2. Reporting Period: AUGUST 1,1987-AL'SUST 31, 1927
- 3. Licensed Therral Pcwer (FWt):
3411
_. _.. _ *Nateplate Rating I
- 4. N ueplate Rating (Gross MWe):
1305 i Notes
- 5. Design Electrical Rating (Net MWe):
1145 I (Bross MWe) calculated as I
6 Maximuc Dependable Capacity (Gross MWe):
1 1450.000 MW, x.90 power i
- 7. Marious Dependable Capacity (Net MWe):
1145 i factor per Fage iii, I
- 8. If Cbnges Occur in Capacity Ratings (Items Nusber 3 Through 7) Since last I NUREG-0020.
I Report. Give Reasons: _ _ _
l I
-..._........._....._..................................................._......~..._._ _..._._..........
.9, Power Level To Which Festricted, If Any (Net FWe):
- 10. Reasen For Restrictions, If any:
............................................................................=..............................................
This Month Yr.-to-Date Cuaulative
- 11. Pours In Reporting Period 744.0 5,031.0 19,056.0
- 12. Number Of Hours Reacter Was Critical 681.3 5,242,0 14,279.3
- 13. Reactor Feserve Shttdo,n Hears
--0--
- 14. hours Str.erator On-Line 671.2 5,152.6 13,923.3
- 15. Urit Reserve Shutdan Hours
--0--
--0--
- 16. Eress Thermal Energy Generated (rWH) 2,195,415 16,866,024 43,439,246
- 17. Gross Electrical Energy 6ererated (PWH) 774,794 5,902, 9 4 15,183,576
- 18. het Electrical Energy Generated (MW4) 729,438 5,555,191 14,178,197
- 19. U m t Service Facter 90.2 63.4 72.5
- 20. Umt Availability factor 90.2 88.4 72.5
- 21. Unit Capacity.acter (Us n; MDC Net) 25.6 E3.2 65.0
- 22. Unit Capacity Factor (Using CER Net) 85.6 63.2 65.0 E3, Unit Forced Outage Rate 9.8 10.7 16.6
- 24. Shutdans Scheduled Over hert 6 Menths (Type, Date, and Duration of Each):
.....R.e. f_u.e.l. i..n.S_...O_c.t.o..b.e..r..2.,.. 1 9. 8_7..... 8. w_e. e_k. s................ _... _.......... _........_....... _.... _...
- 25. If Enut D an At End Of Report Ferted. Esticated Date of Startuc:
- 26. Unita In inst Status (Prict to Ce n ercial Operation):
Forecast Achieved INii!AL CRIT![ALITY IhlTIAL ELECTRICITY COMERCIAL OfEFATION 8709170190 870915 PDR ADOCM 05000413 R
pan
3 1
AVERABE DMLY UNIT POWER LEVEL' DOCKET NO.
50-413 UNIT.
Catawba 1 l
DATE Septesber 15,1987 i
CDMPLETED J. A. Feavis.
-l
... =-
TELEPHONE 704-373-7567 w.
RONTH August,1987 IAY' AVER;6E DAILY POWER LEVEL DAY AVERASE DAILY POWER LEVEL (MWE-Net)
(MWE-Net)
- 1 -
1107 17 1121 2
1108 18 1121 3-
-1109 19 1117 4
1108 20 1121
.....=-
5 1109 21 1118
................=--
6-1107
-22 974 c7 1109-23 0
0 till 24 0
.-=.......
9
-1102 25 0
.10.
1109 26 630 11.
1113 27 1090 l.
12 1115 28 1110
=............
13
!!!4 29 til3
-...s....
1' 1:
14
,1121 30 1117 1
15 1124 31 1114
..................=
16 1123
._____a
..__.--.-_-m_-__
d 8 R_3 3BL V
E LU N
I U OT R
E t st -
1 W5
.)
I C
AD O
ND SN O
U
- at rG 4d 1 A_0 4
T N
M C
U E
FR D
reoE
- TL C
E
' R
.E NM A
G a e pR 0d 2 7
E
ph eU 5 C 0_J_(
ROR TZ TN TA I C EL E
t eSRN
~
RTU I
I K
TA YC Y
i r
(
O C
b P yt EEYE CNE UA US UE TP LN L
ES h rt el NAA O
DI O
T ER DF DN x onvi
. NDDH NTT NT N
NT M
ON O
EfEEF
)
T EP ACN O
P OT ON UR E
O EI 4
(
KI EL E
V TI E TE TL T T AOT AC CN LE S
E C CK CM CO S C EI A EI OU PT U
M A
P D
C E C EO E
E NRE NS m)
C R I E RM RR R D I BM I E an RN O
A I U R
mca E BT EV EC L G EAT ET aSl W
U WL WA C N WCS WL r
p O FO OA OE U A OEN OI ccx P OR PV PR N R PRI PT SiE t(
S l l a N
aamr O
T d uuoe I
N X
X X
U U
X onnt h T
E X
E X
R R
X h aaut
)
C 7
5 N E X
V X
T T
L t MMAO U
8 O D X
L X
S S
E e-(
D 2
P O X
A X
N N
U M1 234
)
E 1
M C X
V X
I I
F 3
R O
(
t C
R s
E u
E W
g SM D
G B
B E
E C
)
O u
4 YE O C
H C
I I
R A_
P ST C
(
D N
A E
S T
S NTR N
ENO W
H CEP O
)
O T
I VE N
n D
N LER i
T O
a U
M l
H TN p
ni S
T TD UW X
x oL J
)
R 3EO FHO
/
1 E
i T
O MH OSD R
(
t t&
(
I P
s c
N E
ee ig
)
U R
2 A
B D
A B
D rt rn REASON u
t
(
s l r i o ei N
2 a
Ra O
8 F e I S c
yT TR 2
t ngr AU 7
nanort r RO enit oso(
UH mel ati t pt el anar D
ninuurire ouif gemeh s q a e e pd
)
1 TYPE F
5 F
F F
F aEMRROAO e-(
RABCDEFGH
)
2 6
9 2
3 6
6
(
2 2
2 2
E B
8 8
8 8
8 d
T e
A l
D 7
7 7
7 7
7 d u 8
8 8
8 8
8 ed ce rh oc p
p p
p p
FS NO 8
9 0
1 1
2 FS 5
5 6
1 6
6
)
1 l!
l
_ A 8 R_3 E
I i gW5 gL _ -
V E
E E
t st -
.)
I C
U.
U
- at rG A_0 4A1 4
T N
DR D
reoE
- T[
C E
A G a e pR 0A?.7 E
.R DE D
ph eU
+
5 C 0_ J_ (
RCR EL E
t eSRN 1i RTU YC Y
ir O
C AU A
bP yt
.EEYE CNE LN L
i rne OMTBN O R.
E ES h rt el NAA O
DI DF DN xonvi NDDH NTT ON
.O EfEEF
)
T..
EP ACN E
O EI 4
(
KI EL E
E EI A EI OU PT U
R RTT RR D
M A
C NRE NS m)
C I BM I E an I U R
ri RLR R
S l l a N
aamr O
T d uuoe N
U X
onnth I
T E
R X
h aaut
)
C 7
5 NE T
L t MMAO U
OD S
E e-(
D 2_
PO N
U M1 234
)
E MC I
F 3
i R
O
(
t C
R s
E u
E W
g S MD E
C
)
O u
4 Y EO I
R S TC A_
P
(
D N
A E
S T
S NT R N
EN O W
H CE PO
)
O T
I V EN n
D N
LE R i
T O
a U
M l
H T N p
'S T
TD U WX x
)
R 3EO FH O/
E i
T O
MH OS DR
(
t t
(
I P
s N
E ee i
)
U R
2 B
D rt REASON u
(
l r
i o N
a R
O Fe I S c
TR t ngr AU nanort RO enit os UH mel at D
- pt el ana
- r. i n u ouif gemeh sqaeepd pt
)
1 TYPE F
F aEMRROA e-(
RABCDEFG
)
2 6
7
(
2 2
E B
B d
T e
2 A
l f
D 7
7 d u o
8 8
ed ce 2
rh oc E
p p
FS G
A NO 3
4 FS P
6 6
)
1
(
l!
i i-DOCKET NO:
50-413 UNIT:
Catawba 1 DATE:
9/15/87 NARRATIVE
SUMMARY
Month: August, 1987 Catawba Unit 1 began the month August operating at 100% full power. The unit reduced power to 90% for approximately two hours on 8/09 to perform Control Valve Movement Tests, and returned to 100% power at 0730 on 8/09. At 1600 on 8/22, the unit began reducing power to go off line due to Unidentified Reactor Coolant System Leakage. The unit came off-line at 0047 on 8/23, and at 0058 the Reactor tripped due to a failed Source Range Detector. The unit returned to service at 0136 on 8/26, and following several start-up related power holds, reached 100% power at 0850 on 8/27, where it operated for the remainder of the month.
. MONTHLY REFUELING-INFORMATION REQUEST 1.
. Facility name: Catawba, Unit 1 2.--Scheduled next refueling' shutdown: October, 1987 3.
Scheduled restart following refueling: December, 1987 4.
Will refueling or resumption of. operation'thereafter require a technical specification change or.other license amendment? Yes If yes,lwhat'will these be? Technical Specification Revision If no, has reload design'and core configuration been reviewed by Safety Review-Committee regarding'unreviewed safety
~
. questions?.N/A
'5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core: 193 (b)' in the spent fuel pool: 64 1
8.'
Present licensed fuel pool capacity: 1418
'I
- Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: September, 2011 DUKE POWER COMPANY DATE: September 15, 1987 Name-of
Contact:
J. A. Reavis Phone:
704-373-7567
OPERATING DATA EEPDFT I
DOCKET 50-414 DATE 9-15-B7 GPERATINS STATUS COMPLETED BY J. A. Eeavis TELEPHONE 704/373-7567 L1. Unit Name: CATAWBA 2
- 2. Reporting Period: AUGUST 1, 1987-AUGUST 31,1987
- 3. Licensed Thermal fower (MWt):
3411
- 4. Naseplate Pating (Gross MWe):
1305 i Netes
- Nameplate Rating I
- 5. Design Electrical Rating (Net MWe):
!!45 I (Bress MWe) calculated as t
- 6. Maxisce Cependable Capacity (Eross MWe):
1 1450.000 MVA x.90 power i
.,7. Maxleus Dependable Capacity (Net MWe):
1145 i facter per Fage iii, I
- 8. If Changes 0ccur in Capacity Ratings (! tees Naeber 3 Through 7) Since Last I NURE6-0020.
I Report. Give Feasons:.,_
l
__,,_,.__,,,____I
_.. _.. _ = - -
- 9. Power Level To Which destricted, If Any (Net MWe):
- 10. Reason For Restrictions, if any:,,,_
.............. -.. _...., =
_= =......._......._.....
This Month Yr.-to-Date Cuculative
- 11. Hours In Reperting Period 744.0 5,831.0 9,072.0
- 12. H uber Of Hours Reactor Was Critical 152.1 4,657.0 6,049.9
- 13. Feactor Reserve Shutdown hours
--0--
--0--
--0--
l
-14. Haurs Generatcr On-line 151.4 4,545.6 5,871.3
- 15. Unit Reserve Shutdown Hours
--0-- -
- 16. Eress Thereal Energy Benerated (NH) 504,731 14,697,596 18,742,210
- 17. Gross Electrical Energy Generated (MWH) 175,657 5,125,200 6,542,342
- 18. Net Electrical Energy Generated (MWH) 149,402 4,806,844 6,104,046 l
- 19. Unit Service Facter 20.4 78.0 64.7
- 20. Unit Availability Fatter 20.4 78.0 64.7
- d. !init Capacity fatter (Using MDC Net) 17.5 72.0 58 E
- 22. Unit Capacity facter (Using DER Net) 17.5 72.0 59,8
- 23. Unit Fcrced Outage Rate 79.7 21.1 34.3 2b Shutdans Scheduled Dver Next 6 Months (Type, Date, and Duration of Eachh
.. _R.e..f.u..e.l. i_n g.....D.e.c.e..m.b..e.r.. 18..,..1 c 8. 7..... 8_we.e..k.s................... _......__ _....._..._.._....._........
1 L
- 25. If Stut Don At End Of Reacrt Feriod. Estimated Iate of Startup:_,Septepher _11.193]_______.....___.
1.
26'. Units In Test ftatus (Pricr tc Ccamercial Operation):
Forecast Achieved l
l l
INITIAL CRITICALITY INiilAL ELECTRICITY CO SEECIAL OFERATION
l.
AVERAGE DAILY UNIT POWER LEVEL' t.
j.
i DOCKET NO, 50-414 1
a UNIT.
Catawba 2 DATE Septester 15,1987 3
C0hPLETED
'J. A. Reavis.
TELEPHONE 704-373-7567-l fr A
i 1
- RONTH August,.1997-i i
DAY.
AVERAGEDAILYPOWERLEVEL DAY AVERASE DAILY POWER LEVEL '
(MWE-Ne't )
(MWE-Net)
-l I'
1128 17 0
'2'
-1127 18.
0
=.......-
3 1124
!?
0
=
L4 1122 20 0
.=
5 1124 21 0
=.......
6 1111' 22 0
=.-
7 176' 23 0
8 0
-24' 0
........... - =
9 0'
25 0
___.....=
10 0
26 0
=..........
11-0 27 0
12 0
28 0
13 -
0 29 0
14 0
30 0
'15 0
31 0
16 0
~-_-__2--_a_-----
A 8 R_3 I O P
T I i O
E 4B/
V E
XT O
M t st -
1 W5
.1 I
C U
NE AS
- at rG 4 A 1_A_0 4
T N
AE I V ES reoE
- T/
C E
- G
- L TA G a e pR 0A9 7
E R
OR OA SPR ph eU 5_ C _ O _ 2_ (
ROR TA TV YI t eSRN RTU H.
~-
OBA i r
(
- f O
C CCT ER T
P bPyt
- EEYE CNE USS UE
- WE rne i
'O M T B N OR DI E DT E/R hrt el NAA. O DI DT A
UF xonvi
~ NDDH NTT N
NW D
E Ef.EEF
)
T~
" V 4
~ AE I MB I E NBL
(
KI EL E
E C P" CF O"
V OU PT U
R U
U D
D M
A P
D RR DY TRR O
C E EO ER UOE m)
R WR RL
- RW mca E DE EI TED aSl W EN WX I NE
'r-p O EE OU NEE ccx P FG PA UGF SiE t(
S l l a.
N
- aamr O
T d uuoe I
N X
X X
onnth T
E X
E E
h aaut
)
C 7
5 N E P
V V
tMMAO U
8 O D M
L L
e-(
D 9
P O U
A A
M1 234
)
E M C P
V V
3 1
R O
(
t C
R s
E u
E W
g SM D H
H H
)
O u
4 YE O C
C C
A_
P ST C
(
D N
A E
S T
S NTR N
ENO W
H CEP O
)
VE N n
O T
I D
N LER i
T O
a U
M l
H TN p
n S
T TD UW X x
o
)
R 3EO FHO /
1 E
i T
O MH OSD R
( t t
(
I P
s c
N E
ee i
)
U R
2 B
A A
rt REASON u
t
(
l r io e
N 3
a R
O 6
Fe c y
I S TR 2
t ngr AU 9
nanort RO 5
enit os UH mel ati D
- pt el ana ninuurire ouif gemeh sqaeepd pt
)
TYPE S
F F
aEMRROA 1
(
e-RABCDEFG ll
)
2 6
7 7
(
E B
8 8
d T
e A
l D
7 7
7 d u 8
8 8
ed ce rh oc p
p FS NO 8
9 2
FS
)
7 7
1 1
ll
(
1 a
DOCKET NO:
50-414 UNIT:
Catawba 2 DATE:
9/15/87 q
1 I
NARRATIVE
SUMMARY
Month: August, 1987 Catawba Unit 2 began the month of August operating at 100% full power. At 2130
)
on 8/06, the unit reduced power to 85% to conduct an Auxiliary Feedwater Pump I
Discharge to Steam Generator Test. The unit then began to reduce power for a forced outage caused by an inoperable Auxiliary Feedwater Valve. -The unit remained off line, following repair to the Auxiliary Feedwater Valve, due to high seal leak-off on the "2B" Reactor Coolant Pump. The unit finished the month of August in a forced outage.
I d
I s
1 l
t
____________J
L l
i l
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Catawba, Unit 2 2.
Scheduled next refueling shutdown: December, 1987 3.
Scheduled restart following refueling: February, 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license anendment? Yes If yes, what will these be?
Technical Spec;.fication Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.-
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
' Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool: 8.
Present licensed fuel pool capacity:
1418 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
January, 2013 DUKE POWER COMPANY DATE:
September 15, 1987 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
l-i l
i-1 e
e s'
CATAWBA' NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.
Personnel Exposure For the month of July, no individual exceeded 10 percent of their allowable-annual radiation dose limit.
2.
The total station liquid release for July has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station' gaseous release for July has been compared with the Technical Specifications maximum annual dose commitment and was less j
than 10 percent of this limit.