Text
EO-MfW
. g ag k
y UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. Saa*8 aaa1
.....,o!
September 2, 1998 Mr. D. N. Morey Vice President - Farley Project Southem Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO PLANT STAFF QUALIFICATIONS - JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. MA1364 AND MA1365)
Dear Mr. Morey:
The NRC staff has recently identified a concern regarding licensee commitments related to plant staff qualifications. Title 10 of the Code of Federal Regulations (10 CFR) Part 55,
" Operators' Licenses," was revised in March 1987, to establish upgraded requirements for licensed reactor operators, as a result of the experience gained from the accident at Three Mile Island, Unit 2. NRC Regulatory Guide (RG) 1.8, Revision 2, " Qualification and Training of Personnel for Nuclear Power Plants," April 1987, describes methods acceptable to the staff for complying with the revised rule. The Statements of Consideration for the Part 55 rule change state that, "Those facility licensees that have made a commitment that is less than that required by the new rules must conform to the new rules automatically." The staff is concemed that several facilities have Technical Specifications that reference industry standards that may not fully meet the revised requirements of 10 CFR Part 55.
The staff previously considered that the standards applied through the industry's accreditation process were equivalent to the guidance contained in RG 1.8, Revision 2. Current Technical Specification (CTS) 6.3.1 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, references American National Standards Institute (ANSI) N18.1-1971, " Selection and Training of Personnel for Nuclear Power Plants," for plant personnel, with the exception of the Radiological Manager, who shall meet or exceed the qualifications of NRC RG 1.8, September 1975. In your pending application to convert your CTS to the format of the improved Standard Technical Specifications, you propose to retain the same commitments.
in RG 1.8, Revision 2, the NRC staff endorses, with conditions, certain parts of industry i
standard ANSI /ANS-3.1-1981, " Selection, Qualification, and Training of Personnel for Nuclear p[
Power Plants," as an acceptable approach for complying with the qualification and training requirements of 10 CFR Parts 50 and 55. This endorsement applies to the positions identified 1
as shift supervisor, senior operator, licensed operator, shift technical advisor, and radiation l
protection manager. For positions other than those identified, the RG finds acceptable the c
l approach provided in ANSI N18.1-1971.
g\\
Please describe how your commitment to an ANSI standard other than that endorsed by NRC RG 1.8, Revision 2, currently meets the requirements of 10 CFR Part 55, as discussed in the Statements of Consideration for the rule change given above. If you determine that additional
.:q p.
ww 9909090167 990902
"" "'""'~'
"'d-y PDR ADOCK 05000348 P
1
)
4,7 D. N. Morey September 2, 1998 actions are necessary to revise the existing TS, an opportunity to accomplish these actions in an efficient manner is available through revision of your current submittal. If appropriate,
. please provide your plans and schedule for those actions. You are requested to provide a response within 45 days of receipt of this letter.
If you have any questions regarding this request, please call me at (301) 415-2426.
Sincerely, l
ORIGINAL SIGNED BY:
Jacob 1. Zimmerman, Project Manager Project Directorate ll-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket Nos. 50-348 'and 50-364 cc: See next page i
Distnbution.
Docket File JArildsen ACRS PUBLIC JFoster LPlisco, Rll PD ll-2 Rdg.
CSchulten PSkinner, Ril JZwolinski OGC i
To receive a copy of this document, indicate in'the box: "C" = Coph without attachment / enclosure "E" = Copf with a teachmentlenclosyse "N" = No copy OFFICE PM:D l6 LA:PDil\\20 ld D:Pp j L l-
-l l
l NAME JZiflildprman:en - LBerry AOI /
H eerk $ /
l DATE 9 /9.l98
)/G/98 4 9 /1 /98
/ - /98
/ /98
/ /97 DOCUMENT NAME: G:\\FARLEY\\lTSRAl.#2 OFFICIAL RECORD COPY i :
6-
.J
u
.s D. N. Morey actions are necessary to revise the existing TS, an opportunity to accomplish these actions in an efficient manneris available through revision of your current submittal. If appropriate, please provide your plans and schedule for those actions. You are requested to provide a response within 45 days of receipt of this letter.
if you have any questions regarding this request, please call me at (301) 415-2426.
Sincerely, 4 J.
Ja mb 1. Zim rman, Project Manager Project Directorate ll-2 Division of Reactor Projects - t/11 Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: See next page i
h
(
l
Joseph M. Farley Nuclear Plant ec:
I Mr. L. M. Stinson Rebecca V. Badham General Manager-SAER Supervisor Southern Nuclear Operating Company Southern Nuclear Operating Company Post Office Box 470 P. O. Box 470 Ashford, Alabama 36312 Ashford, Alabama 36312 Mr. Mark Ajtuni, Licensing Manager Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm Post Office Box 306 1710 Sixth Avenue North Birmingham, Alabama 35201 Mr. J. D. Woodard Executive Vice President Southem Nuclear 0, arating Company Post Offica Box 1295 Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission i
Post Office Box 6406 i
Dothan, Alabama 36302 I
- Regional Administrator, Region ll U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85
)
Atlanta, Georgia 30303 l
Resident inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, Alabama 36319 I