Ack Receipt of Util Transmitting Proposed Amend to Physical Security Plan in Response to Miscellaneous Amends & Search Requirements.Addl Info Requested within 30 Days,Prior to NRC Approval
ML20238D914
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/02/1987
From: Chan T
Office of Nuclear Reactor Regulation
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
References
GL-87-08, GL-87-8, TAC-65427, NUDOCS 8709110495
Download: ML20238D914 (5)


Text

{

?,ff

.)

}

}

,~

(t

, 1Jcket No. 50-344 SEP N.g, Mr. David W. Cockf kld Viv. President, Nuclear Por1Mnd General Electrie Company 1.?] South West Salntn Street Iortland, Oregon 97204

Dear Mr. Cockfield:

This is to acknowledge receipt of the Portland G u eral Electric Comoany let;er dated December 19,1936, 'which tiansmitud' a proposed amendment to the Trojan Huc har Plant. Ch>sical 14: v.ity Pieh in response to the MiMellaneous Am9ndments old Sorch Regtf rements.

The sebaitted document has oeen reviewcd aad.we have determined that additional in ornation and revisicqs to the plan are recuired prior to our approvnl.

r The enclond comments are based upon certinert NRC re7ulations and published guidance de'. scribing methods, acceptable to the NrA: ct6ff, for implement bg specific parts of those regulations.

I'. is r? quested that Mc *nc:t;de your response to these comments within 30 day, from recnipt cf;1pis 'etter, or provide a schedule for doing so within 15 days.

The reporting ond/or record keeping requirements con (ained in this letter affect fewer than ten re.pondents; trerefore, OM8 clearance it not required under P.L.96-511.

Should you have any quest %ns concerning, th s enc',osed comments, please contact the reviewer, Jare Gibson, at (301) 492-8457.

Sincerely, Terence L. Chan, Pr ojec';. Panager Project Directorate V Division of bacte. Project 2 III, IV,V and Special Projects Office of Nuclear Reactor Regulation tnclowe:

DISTRIBUTIC4 W/ ENCLOSURES:

Physical U ctrity Plan Comments, RSGB rf Sec rf JLGibso" CBuracker (2) cc weenci n ure:

Region 1 JLee See next page TChan "DocketFile50-$4 Case File NRC PDR l

RErickson w/o enc 1 Local PDR

  • See previou:, concurrence LBush w/o enti

~

OFC : RSGB

RSGB
RSGE
RSGB'"
Pit V
PD V o);i.....

y e

...............,..........,..........7...............,.........,......

NAME :JLOsbson/an :CBuracker

L0ush
RErickson
JLee'
ichan D

...............:............................................................d))*

DATE :9/ /87

9/ /87
9/ /87
9/ /87
9/ /87 9/2./87
j[2 /

OFFICIE~ifEC06 C0P f G709J10495 G70902 FEM ADDCK 00000344 F

PDR mm2m7mBMMNM-MM

.?

Docket No,.-50-344 Mr. David W. Coc'kfield Vice President, Nuclear Portland General Electric Company 121 South West Salmon Street Portland, Oregon 97204'

Dear Mr..Cockfield:

.This is to' acknowledge receipt of the Portland General Electric Company letter dated December 19, 1986, which. transmitted a proposed amendment'to

~

the Trojan Nuclear Plant Physical Security Plan in response to the Mf:cellaneous Amendments and Search Requirements.

T The submitted document lias been reviewed and we have determined that additional information and revisions'to the plan:are required prior to our approval.

The anclosed comments are b'ased upon pertinent,NRC regulations and published guid.ince describing methods,' acceptable to the NRC staff, for implementing spec'fic parts of those regula'tions.

N

/

It h requested that you provide your response to these comments within:

30 da/s from receipt of this letten

/

s The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents;;therefore,- OMB clearance is not required under P.L.96-511.

Should you have any questions concerning tiie enclosed comments, please.

contact the reviewer, Jane Gibson, at (301) 492-8457.

A Si ncere'ly,

\\'

N N

Terrance Chan, Project Manager Project Directorate V Division of Reactov. Projects V Offica of Nuclear' Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf Sec rf JLGibson CBuracker (2) cc w/ enclosure:

Region V JLee.

l See next page TChan Docket File 50-344 Case File NRC PDR-RErickson w/o enc 1 Local PDR LBush w/o enc 1 n]

rJ OFC :RSGB

RSGB-
RSGB y
R$GB
PD V-
PD V

.... ;. )........................f..p y NAME$JLGib n/an$CBur(a'g, cIker Bush

REr on
J
TChan L mSE DATE :8/ /8h
8// /8h 8/ /8h 8/ /8h 8/[/8h 8/ /h OFFICIAL RECORD COPY L

--.----------l

ENCLOSURE Docket No. 50-344 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMEN 0MENTS AND SEARCH REQUIREMENTS)

TROJAN NUCLEAR PLANT.

Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the proposed security plan.

Reference 10 CFR 73.55.

I State that vital area access controls will not be dropped for life threatening situations not involving public health and safety. ' Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide-a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior te re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force.

Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

Provide a statement that only bona fide federal, state, and local law enforcement personnel on official duty are exempt from the required equipment searches upon entry to the protected area.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that a current authorization access list will be established for each vital area.

Reference 10 CFR 73.55 (d)(7)(1)(A).

j i

Provide a commitment to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.

Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).

Reference i

10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

l Provide a commitment that all keys, locks, combinations, and related access I

control devices used to control access to protected and vital areas shall be changed or rotated at least every 12 months or whenever there is evidence or suspicion that any of these devices may have been compromised.

Reference 10 CFR 73.55(d)(9).

4 Provide a commitment that whenever an individual's' unescorted access is' revoked due to lack of trustworthiness, reliability, or inadequate work performance,.

keys, locks, combinations, and related access control devices to which that person had access shall be changed or rotated.

Reference 10 CFR 73.55(d)(9).

I

' Docket'No. 50-344,

Provide a commitment that the secondary power supply systems for both the alarm annunciator equipmer,t and non portable communications equipment,shall be located i

within a vital arer Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08

'(Q&A #16).

Indicate what components of the secondary power supply system will be protected as vital.

Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time of.

entry, and time of exit of a11' individuals. granted access to a vital area except those individuals entering or exiting the reactor control room.

Reference 10 CFR 73.70(d) and Regulatory Guide 5.65,' paragraph 3.2.

(

o'

l Mr. David W. Cockfield l

Portland General Electric Company Trojan Nuclear Plant l

CC*

Senior Resident Inspector

-)

U.S. Nuclear Regulatory Commission 1

Trojan Nuclear Plant Post Office Box 0 j

Rainier, Oregon 97048 i

Michael J. Sykes, Chairman Board of County Commissioners l

Columbia County

-j St. Helens, Oregon 97501 Mr. David Kish Oregon Department of Energy Labor and Industries Building Room 121 i

Salem, Oregon 97310 i

l Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite.210 Walnut Creek, California 94596 I

l l