ML20238C921
| ML20238C921 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/28/1987 |
| From: | De Agazio A Office of Nuclear Reactor Regulation |
| To: | Shelton D TOLEDO EDISON CO. |
| References | |
| DB-87-007, DB-87-7, TAC-65375, NUDOCS 8709100450 | |
| Download: ML20238C921 (5) | |
Text
_
h 3;
, %. 50-346 i
Doch Seri
- 10. DB-87-007
/
i4r. Donald C. Shelton Vice President - Nuclear Toledo Edison Company 300 Madison Avenue Toledo, Ohio 43652
Dear Mr. Shelton:
j
$UBJECT:
MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS 1
DAVIS-BESSE NUCLEAR POWER STATION (TAC #6b375) j i
j This is to acknowledge receipt of the Toledo Edison Cnmpany letter dated l
December 1, 1986, which transmitted a proposed amendment to the Davis-Besse j
Nuclear Power Station Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.
The submitted document has been reviewed and we have determintd that additional l
information and revisions to the plan are required prior to our approval.
l When rdubmitting page charge revisions, do not reference site procedures l
in lieu of providing the appropriate commitment within the Security Plan.
The enclosed comments are insed 'upon pertinent NRC regulations and published guidance describing methods acceptable to the NRC staff for implementing specific parts of those regulations.
i It is requested that you provide your response to these comments no late" than October 30, 1987.
j The reporting and/or record keeping requirements contained in this letter i
affer.t fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
i Should you have any questions concerning the enclosed comments, please contact the reviewer, Barry Manili, at (301) 492-7077.
Si ncer_ely,
Albert W. De Agazio, Project Manager Project Directorate III-1 i
Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security Plan Comments RSGB rf Sec R l
BManili CBuracker (2) cc w/ enclosure:
Region III (RIngramDocketFile50-346) s See aext page ADeAgazio Case _ File NRC PDR Rhricksoit wo snel Local PDR r
LBush w/o encl OSEE PREVIOUS CONCURRENCE PAGE OFC : RSGB *
- RSGB *
- RSGB *
- RSGB *
- PD III-1
- PD 111-1 v;. 8P.*.@.a.
NAME :BManili/bc :CBuracker
- LBush
- RErickson
- Ring m
- ADeAga o
...............................................................................2hfg...a DATE$8/10/87
$8/10/87
$8/10/87
$8/11/87
$8/)3/87-l8/gf/87 8709100450 870828 PDR ADOCK 05000344.
_ F_.
(:,..
m p
,M l %
.. m 1
I Dscket'No. 50-346-i i
' AUG 2 81987 Hr. Joe Williams, Jr.
Senior Vice President - Nuclear Toledo Edison Company 300 Madison Avenue
- j/
x Toledo, Ohio'43652 s
]
Dear Mr. Williams
{
This q to acknowledge receipt of the Toledo Edison Company letter dated-Decemben l, 1986, which transmitted a proposed amendment to the Davis-Besse s
Nuclear Power Station Physical Security Plan'in response to the Miscellaneous Amendments'and Search Requirements.
/
Thesubmitteddocumenthasbeenreviewedandweha[edeterminedthatadditional j
information and revisions to the plan are required prior to our approval.
1 When resubmitting page change revisions, do not' reference site' procedures j
in lieu of providing'the appropriate commitment within the Security Plan.
l The enclosed comments 'are based upon pertinent NRC regulations and published
]
guidance describing methods,. acceptable to,the NRC staff, for implementing a
specific parts of those r'eguletions.
i It is requested that you provide your re/
{
N sponse to these comments within 30 days i
frora receipt of this letter. \\
The reporting and/or record. keep \\
i ing, requirements contained.in this letter j
effect fewer than ten respondents;,therefore, OMB clearance is not required i
under P.L. 96"511.
\\
1 Should you have any questions co'ncerning the enclosed comments, please contact the reviewer, Barry Manili, at'(301) 492-7077.
./
/
Sincerely,
/
\\
r
/
/
Albert W. Deagazio, Project Manager ProjectDirectKateIII-1 Division of Reactor Projects III, IV, V f
and Special Projects
/
Office of Nuclear Reactor Regulation
'/
Enclosure:
/
DISTRIBUTION W/ ENCLOSURES:
Physical Security /
, Plan Comments RSGB rf Sec rf j
BManili CBuracker (2)
L Region III RIngram cc w/ enclosure:
Seenextpage[
l ADeagazio Docket File 50-346 Case File NRC POR RErickson w/o enc 1 Local PDR l
LBusn w/o enci
~
l.
OFC :RSG
- RSGB'
- RSGB
- RSGB
- PD III-1
- PD 111-1
?....:... a....:
B
- CBuNec - r
- LBush
- RE nn
- RIngram
- ADeagazio NAME :. N ili c DATE :8/10/87
- 8/ld/87
- 8//c/87
- 8/ff/87
- 8/ /87
- 8/ /87 f
0FFICIAL RECORD COPY w ___
\\j
.c w
Docket No. 50-346 l
C l
COMMENTS ON PHYSICAL SECURITY PLAN CHANGES
'l (MISCELLANE0US AMENDMENTS AND SEARCH REQUIREMENTS) l Davis-Besse Nuclear. Power Station d
Provide a schedule for implementing the amended safeguards requirements 1
within 180 days after Commission approval of the-proposed security plan.
l Reference 10 CFR 73.55.
1 State that vital area access controls will not be dropped for life threat-ening situations not involving public health and safety.
Reference 10.CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).
Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions.
Reference 10 CFR 73.55(d)(1).
Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force.
Reference 10 CFR 73.55(d)(1) and Generic
)
Letter 87-08 (Q&A #11).
)
Provide a commitment that an access authorization system will be estab-lished to limit unescorted access to vital areas during nonemergency-I conditions to those individuals required to perform specific duties.
Reference 10 CFR 73.55(d)(7)(i).
Provide a commitment that a current authorization access list will be
{
established for each vital area.
Reference 10 CFR 73.55 (d)(7)(1)(A).
Provide a commitment that vital area access lists shall be updated and reapproved by the cognizant manager / supervisor at least every 31 days.
Reference 10 CFR 73.55(d)(7)(1)(A).
1 Provide a commitment to positively control, in accordance with the cur-rent approved access lists, all points of personnel and vehicle access to vital areas.
Reference 10 CFR 73.55(d)(7)(1)(B).
~
(
Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.
Reference 10 CFR 73.55(d)(7)(i)(C).
Provide a commitment to ensure prompt access to vital equipment to accom-modate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.
Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).
Reference 10 CFR 73.55(d)(7)(ii) and Generic letter 87-08 (Q&A #6).
u
y k
I Davis-Besse I Provide a commitment to periodically (annually) review physical security i
and contingency plans and procedures to evaluate their potential impact
{
on plant and personnel safety.
Reference 10 CFR 73.55(d)(7)(ii)(B) and l
Provide a commitment that the secondary power supply systems for both the alarm annunciator equipment and non portable communications equipment J
shall be located within a vital area.
Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #16).
Indicate what components of the secondary power supply system will be protected as vital.
Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).
Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.
Reference 10 CFR 73.70(d).
l
\\
l l
L
(
l l
Mr. Donald C. Shelton Davis-Beste 14uclear Power Station 1
Toledo Edison Company Unit No. 1 cc:
Donald H. Hauser, Esq.
The Cleveland Electric Radiological Health Program Illuminating Company Ohio Department of Health P. O. Box 5000 1224 Kinnear Road Cleveland, Ohio 44101 Columbus, Ohio 4'3212 l
Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General j
Edison Plaza 30 East Bn7ad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 i
Mr. James W. Harris, Director Gerald Charnoff, Esq.
(Addressee Only)
Shaw, Pittman, Potts Division of Power Generation j
and Trowbridge Ohio Department of Industrial Relations 2300 N Street N.W.
2323 West 5th Avenue Washington, D.C. 20037 P. O. Box 825 1
Columbus,, Ohio 43216 Regional Administrator, Region III i
U.S. Nuclear Regulatory Commission Ohio Environmental Protection Agency i
799 Roosevelt Road 361 East Broad Street Glen Ellyn, Illinois Columbus, Ohio 43266-0558 a
President, Board of Mr. Robert B. Borsum County Commissioners of Babcock & Wilcox Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 200, 7910 Woodmont Avenue Bethesda, Maryland 20814 State of Ohio Public Utilities Commission Resident Inspector 180 East Broad Street U.S. Nuclear Regulatory Commission Columbus, Ohio 43266-0573 4
5503 N. State Route 2 Oak Harbor, Ohio 43449
_