Forwards Emergency Preparedness Implementation Appraisal Followup Insp Rept 50-412/87-49 on 870629-0701.No Violations Noted.All Emergency Preparedness Items Needing Correction Prior to Initial Criticality or Full Power Corrected
ML20238C797
Person / Time
Site: Beaver Valley
Issue date: 09/02/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20238C799 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8709100382
Download: ML20238C797 (2)


See also: IR 05000412/1987049

Text

_

.

.

SEP 0 2 1937

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. J. J. Carey

Senior Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject:

Inspection Report No. 50-412/87-49

This report forwards the findings of the Emergency Preparedness Implementation

Appraisal (EPIA) followup inspection which was conducted June 29-July 1,1987,

by Messrs. E. Fox, Jr., C. Gordon and K. Christopher of this office and an

.NRC contractor at your Beaver Valley Power Station, Unit 2, Shippingport,

Pennsylvania.

Discussions of our findings were held by Mr. Fox with

Mr. Pavlechko and other members of your staff at the conclusion of the

inspection.

The areas examined during this inspection were limited to reviewing your

corrective actions taken on the findings and improvement items identified

during the Emergency Preparedness Implementation Appraisal (Inspection No.

87-14) conducted on March 2-6, 1987. Within these areas, the inspection

consisted of selective examinations of procedures, representative records,

interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were observed. All emer-

gency preparedness items in need of correction prior to initial criticality

or full power operations have been corrected.

Your cooperation with us in this matter is appreciated.

Sincerely,

02 : i al signe

y,

~

(lN

q

f

,

Thomas T. Martin, Director

d

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-412/87-49

0FFICIAL RECORD COPY

IR BV 87-49 - 0001.0.0

{

08/26/87

87091003B2 870902

PDR

ADOCK 05000412

G

PDR

. _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ .

_

_ _ _ _

.,

'

Duquesne Light Company

2

'

i.

i

cc w/ enc 1:

J. D. Sieber, Vice President, Nuclear

\\

J. Crockett, Senior Manager, Nuclear Operations

(

E. Ewing, Quality Assurance Manageri

R. J. Swiderski, Manager, Startup Grwp -

J. P. Thomas, Manager, Engineering

?

R. E. Martin, Manager, Regulatory Affairi

C. O. Richardson, Stone and Webster Engineering Corporation

Public Document Room (PDR)

.,

Local Public Document Room (LPDR)

<

f

Nuclear Safety Information Center (NSIC).

NRC Resident Inspector

o

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

J. Beall, SRI, BV-I

P. Tam, LPM, NRR

T. Martin, DRSS

S. Ebneter, DRS

A. Lodewyk, DRS

Robert J. Bores, DRSS

Dave Matthews, NRR, PEPB

)

0k

}RI:DR3S 9.Wb

t

RI:DFf$

RI:DRS

Fogdh/ms

Lazarus

Bellamy

l

8/$ /87

8/g /87

8/y/87

p

f

0FFICIAL RECORD COPY

IR BV 87-49 - 0002.0.0

08/26/87

_ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _