ML20238C124

From kanterella
Jump to navigation Jump to search
Requests That Encl Meeting Summary for 870326 Meeting Be Forwarded to H Myers,Per H Myers Standing Request. Distribution for Meeting Notice Re Facility Also Encl
ML20238C124
Person / Time
Site: 05000000, Sequoyah
Issue date: 05/26/1987
From: Axelrad J
NRC
To: Fay E
NRC
Shared Package
ML082310219 List:
References
FOIA-87-726 NUDOCS 8712300062
Download: ML20238C124 (2)


Text

- - - - _. - _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ /p* *Ecoq'o UNITED STATES '

NUCLEAR REGULATORY COMMISSION y rj n

2-E WASHINGTON, D. C. 20555 kh

'%.'.v /

"ay 26, 1987

] M: y J,~. ' '. 6.

h. n ' '4 g],'([

l NOTE TO: Tom,Ae1Imi N

FROM:

Jane Axelrad

SUBJECT:

TRANSMITTAL OF DOCUMENTS TO DR. HENRY MYERS In accord with Dr. Myers' standing request for copies of meeting notices and summaries,.please forward the attached document to him.

[

1 y

s _,wL ug ane Axelr d

Attachment:

Mtg. Summary for 3/26/87 Mtg.

Ldme 6/M/77 l

1 k

8712300062 871222 PDR FDIA

)

WANNO7-726 PDR il l

l

Distribution for Feeting Summary dated: May 18, 1957 Facility:' Secuoyah Nuclear Plant Units 1 and 2 Cocket File NRC-POR-Local POR JAxelrad SEbneter SRichardsen JZwolinski SRConnelly 30Liaw GZech JConohew TRotella JHolonich BKSingh MFields CJamerson, w/o enclosures JKelly OGC-BETH ACRS (10)

Projects Reading SEQ Files FMiraalia, w/o enclosures JPartlow EJordan Dr. Henry Myers -

TVA-Bethesca

  • Copies sent to persons on facility service lists.

Q l

6

[A Kfig%

UNITED STATES 1

y^

NUCLEAR REGULATORY COMMISSION e

3,

.i nsmuorow. o. c. nossa

.l t

e

%,...../

May 13, 1987 Docket No. 50-327, 50-328 PLANT:

Sequoyah Nuclear Plant, Units 1 & 2 UTILITY:

Tennesee Valley Authority l

SUBJECT:

MINUTES OF MARCH 26, 1987 MEETING TO DISCUSS THE SECUOYAH DIESEL GENERATOR SE0VENCING CALCULATIONS On March 26, 1987 members of the staff met with representatives of the l

d Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss -

the diesel generator load secuencing calculations that are presently ongoing for Sequoyah. Enclosure 1 is a list of, attendees.

The discussions held at the meeting mainly centered around questions the staff had on the calculations.

In response to these staff questions TVA provided a copy of Revision 5 of the calculations along with the Engineering Change Notification (ECN). A copy of this information is contained in Enclosure 2.

As a result of the meeting, the staff will continue its review of this area using the information contained in Enclosure-2..

Several agreements were reached between TVA and the staff where TVA would undertake some additional actions. These are:

(1) Continue to pursue a revision to Technical Specifications, and supporting bases, for diesel generator testing; to be submitted by September 30, 1987 (2) Timely submittal before Unit i restart, provide the excess voltage drop calculations for Unit 1; (3) Remove all unverified assumptions from the calculations; and (4) In the future, notify the staff of all revisions to the calculations and submit any revisions that change the conclusions, j

j l

Yu, h&d!

Thomas S. Rotellt, Project Manager l

Divission of TVA Projects Office of Special Projects

Enclosures:

As stated cc: See next page e

nt~ mar %m

& w A.~ f v s w

(.