ML20237F221

From kanterella
Jump to navigation Jump to search
Requests That Encl Summary of 870420 Meeting Be Forwarded to H Myers,Per H Myers Standing Request.Distribution for Meeting Summary Re Facility Also Encl
ML20237F221
Person / Time
Site: 05000000, Sequoyah
Issue date: 05/21/1987
From: Axelrad J
NRC
To: Fay E
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
Shared Package
ML082310219 List:
References
FOIA-87-726 NUDOCS 8712290450
Download: ML20237F221 (2)


Text

jk2 RIOug

,ef (o

UNITED STATES g.

NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D. C 20555 E

j[

N N Q L d a // & n,

gy g 1 1987 J$

- fhl

$k NOTE T0: To m

FROM:

Jane Axelrad

SUBJECT:

TRANSMITTAL OF DOCUMENTS TO OR. HENRY MYERS In accord with Dr. Myers' standing request for copies of meeting notices and sumar

, please forward the attached document to him.

. L1 b Ifv bakl.

[vda]neAxelrad

Attachment:

Mtg. Summary for 4/20/87 Mtg.

j i

e 8712290450 871222 f, /

PDR FOIA WANN87-726 PDR

/

li

4 7

DISTRIBUTION FOR MEETING

SUMMARY

DATED: May 13, 1987 Facility:

Sequoyah Nuclear Plant, Units 1 and 2*

Docket File NRC Participants NRC POR J. Donohew.

Local POR J. Keppler J. Axelrad S. Ebneter S. R. Connelly, OIA

'S. Richardson C. Jamerson, w/o enc 1.

J. Zwolinski F. Miraglia B. D. Liaw ACRS (10)

G. Zech,'RII OGC-BETH M. Branch E. Jordan J. Partlow Dr. Henry Myers SON File Projects Rdg TVA-Bethesda

  • Copy sent to persons on facility service list
  1. pe veo+#6' UNITED STATES

!I

' t, NUCLEAR REGULATORY COMMISSION I

WASHINGTON D C.20666 5

May 18, 1987 Docket Nos. 50-327/50-328 LICENSEE:

Tennessee Valley Authority FACILITY:.

Sequoyah Nuclear Plant, Units 1 and 2

SUBJECT:

MEETING OF APRIL 20, 1987 BETWEEN THE OFFICE OF SPECIAL

-l PROJECTS, NRC AND THE TENNESSEE VALLEY AUTHORITY

]

1 On Monday, April 20, 1987, a meeting was held in Chattanooga,. Tennessee, between the Office of Special Projects (OSP), NRC and the Tennessee Valley Authority (TVA). The meeting was held at TVA's corporate headquarters from

'i 1:00 p.m. to 5:00 p.m. for the OSP staff to present the conclusions of its J

review of Revision 4 of Volume I of TVA Nuclear Performance Plan and for the TVA staff to present the status of the implementation of. Volume II of the.TVA Plan. Volume I is for the' corporate level and Volume II is for the.Seoucyah a

site. Revision 4 of Volume I was submitted on March 26, 1987, and Revision 1 l

of Volume II was submitted April 1,1987.

The meeting was transcribed. 1:: the agenda for the meeting. is the' transcription of the meeting. is the list of those attending the meeting. is-the material handed out by TVA.

There was no handout from the OSP staff.

n neh Chief Sequoyah Restart Division of TVA Projects Office of Special Projects Enclosures As stated cc: See attached lists i

6 b i c)o; j

'iff -