Text
_ _
[7N C:mm:nw::lth Edison
) One First Na'ional Plaza Chicago, Illinois C '/' Address Reply to: Post Office Box 767
%d Chicago, Illinois 60690 0767 August 24, 1987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Zion Nuclear Power Station Units 1 and 2 Nureg - 0737, Supplement 1 - Confirmatory order Regulatory Guide 1.97 NRC Docket Nos. 50-295 and 50-304 TAC Nos. 51367/8 References (a): June 12, 1984 letter from S.A. Varga to D.L. Farrar (b): August 1, 1986 letter from P.C. LeBlond to H.R. Denton (c): May 15, 1987 letter from D.R. Muller to D.L. Farrar Gentlemen:
Reference (a) transmitted an order confirming Commonwealth Edison Company's commitment made in response to Generic Letter 82-33.
Included among these items was a commitment to submit a preliminary report describing how the requirements of Regulatory Guide 1.,97 have been or will be met at Zion Station. That report was submitted in reference (b).
Reference (c) provided Commonwealth Edison Company with an interim j
Technical Evaluation Report (TER) and requested a response regarding the twenty-two open items identified in the TER.
Commonwealth Edison Company's review of these open items is contained in the Attachment to this letter.
Two items will require additional study, as discussed in the Attachment.
These items are:
3.3.5 - Containment Isolation Valve Position 3.3.11 - Accumulator Tank Level and Pressure f
i 8708310175 870824 PDR ADOCK 05000295 P
l e
.O j e l
l l
l l
n.
_ I This additional review is expected to be cor91ete by October 30, 1987. The results of this work will be provided to L.se NRC staff at that time.
If any further questions arise regarding this matter, please direct them to this office.
Very truly yours, P.C. LeBlond Nuclear Licensing Administrator Attachment cc: Resident Inspector - Zion J. A. Norris - NRR 1
l 3491K
\\
l l
l
'1 l
l l
ATTACHMENT l
1 l
l l
1 l
1 RESPONSE TO THE NRC ZION R.G. 1.97 TECHNICAL I
l EVALUATION REPORT I