Text
~
e
. T Commonwealth Edison 2 One First National Plaza. Chicago, Encis'
\\'
Address Reply t]; Post Office Box 767 Chicago, Illinois 60690 0767 August 1, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Zion Nuclear Power Station Units 1 and 2 NUREG-0737. Supplement 1 - Confirmatory Order - Regulatory Guide 1.97 NRC Docket Nos. 50-295 and 50-304 References (a): June 12, 1984 lotter from S. A. Varga to D. L. Farrar.
(b): April 14, 1983 letter from cordell Reed to H. R. Denton.
(c): July 20, 1983 letter from E. D. Swartz to H. R. Denton.
(d): July 28, 1983 letter from cordell Reed to H. R. Denton.
(d): August 25, 1983 letter from Cordell Reed to H. R. Denton.
Dear Mr. Denton:
Reference (a) transmitted an Order confirming Commonwealth Edison Company's commitments made in response to Generic Letter 82-33.
These commitments were originally contained in reference (b) and were modified in references (c), (d), and (e). Included among these items was a commitment to submit a pteliminary report describing how the requirements of Regulatory Guide 1.97 have been or will be met. This letter transmits the required report.
The Attachment to this letter contains a preliminary report describing how the Regulatory Guide 1.97 review was performed for Zion Station. This report provides an overview of the review process and identifies the instruments at Zion that are to be utilized to meet the requirements of Regulatory Guide 1.97.
In addition, an analysis of any deviations from Regulatory Guide 1.97 is included. This analysis includes either a justification for the deviation or a plan for upgrading the instrument.
8608050073 860801 PDR ADOCK 05000295 P
PDR l g
F Mr. H. R. Denton August 1, 1986 The submittal of a final Regulatory Guide 1.97 report and implementation schedule for Zion Staiton will be submitted by February 1, 1987 as required by reference (a). It should be noted that the February 1, 1987 submittal date was original predicated upon timely NRC approval of the DCRDR Summary Report, as discussed in reference (e).
If you have any questions regarding this matter, please contact this office.
Very truly yours, P. C. LeBlond Nuclear Licensing Administrator 1m Attachments j