See also: IR 05000454/1987031
Text
'
b@
..
,
~
AUG 271987
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
l
l
This refers to the routine safety inspection conducted by Mr. H. Peterson
and others of this office on July 27-31, 1987, of activities at the Byron
Nuclear Generating Station, Units 1 and 2, authorized by NRC Operating
'
Licenses No. NPF-37 and No. NPF-66 and to the discussion of our findings with
Mr. R. Pleniewicz and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
It is our understanding that this problem may, in fact, exist in
other Commonwealth Edison plants.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
8' Original signed by N.D. Shafer"
W. D. Shafer, Chief
Radiological Protection Branch
Enclosures:
1.
bg
2.
Inspection Reports
f
No. 50-454/87031(DRSS);
No. 50-455/87029(DRSS)
See Attached Distribution
b
RIII
RII
RIII
\\
RIII
I
RIIIq
rson/ims
Patt
n
Chris{ offer
n 1
i ds
S
OV/6l1Y
8709040346 870828
~
g;lg]
E>'21 AT
(
ADOCK 05000454
[es
G
'
.
,
,
Commonwealth Edison Company
2
g g g '7
1
Distribution
{
l
cc w/ enclosures:
'
D. Butterfield, Nuclear
Licensing Manager
V. I. Schlosser, Project Manager
l
Gunner Sorensen, Site Project
Superintendent
'
R. E. Querio, Plant Manager
i
l
DCS/RSB (RIDS)
,
Licensing Fee Management Branch
Resident Inspector, RIII Byron
[
Resident Inspector, RIII
Braidwood
D. W. Cassel, Jr. , Esq.
Richard Hubbard
2
J. W. McCaffrey, Chief, Public
Utilities Division
Diane Chavez, DAARE/ SAFE
.
L. 01shan, NRR LPM
i
H. S. Taylor, Quality Assurance
Division
D. Matthews, EPB, NRR
W. Weaver, FEMA, RV
.
S
i
e
d
a
t