Rev 5 to Surveillance Instruction SI-7.1, Diesel Generator Ac Electrical Power Source Operability Verification (Diesel Generator/Offsite Source)
ML20237K152
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/18/1985
From: Deweese C, Flynn F
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20237K146 List:
References
SI-7.1, NUDOCS 8708190109
Download: ML20237K152 (8)


Text

. _ _ _ _ _ _ _ _ _ _ -

., e TENNESSEE VALI,EY AUTil0RITY SEQUOYAH NUCI, EAR P1, ANT SURVE l l,t.ANCE INSTRUCTION SI-7d DIESEL. CENERATOR_

AC_ ELECTRICA!. POWER SO_U_RCE OPERAH_II.lTY VERIFICAT!ON

.(DIESE!, GENERATOR

_ /OFFSITE SOUR [E),

REV.- 6 m

in lNPROCESS

..n PREPARED BY: C. E. Deweese/F. E. Flynn RESPONSIBLE S6t.rlON: . .OperationVD REVISED BY: Johnh son O'

SUBMITTED BY: di1 t 3 Responsible Se tion Supervisor Cs PORC REVIEW DATE: 10 N

'O APPROVED BY: %d sTfEs h

.O P!snt' Manager o DATE APPROVED: NOV 18 BBS ,.  ;

Reason for revision (include all Instruction Change Form Nos.):

Revised to ensure that 1..evels are verified for fuel oil day tanks and seven_ day tanks.

.'{

The last page of this instruction is number: 6 8708190109 870813 PDR P

ADOCK 05000327 PDR

~_m______

SEQUOYAll NUCLEAR PLANT PLANT INSTRUCTION REVISIOli LOG SI-7.1 SURVEILLANCE INSTRUCTION Payos REASON FOR REVIS!Off (INCLUDE COMMIT-REVISIOff Date MENTS AND AI L ICF FultM NUMi$ERS)

Affceted LEV E!. Apptoved 0 7/17/80 All 1 8/1/80 1

_2 12/13/82 4 3 2/25/83 4 O 2,3 4 4/3/84 e

5 N( V 18 G35 r, n.

c _

D O

0585L/j1p

la l

. y

[g

  • SQNP- i L . SI-7.1 - Unit U, ,

Page 1.of 2 i Rev. I 1.0 SCOPE '

'l

.This' test includes 2' l.1 Verif ying operability by m.snually starting each of the three operable dicscl generators prior to taking a dicscl gener.itor out of .scrvice. l 1.2 i by manually starting each of.the three operable Verifying operabil'ty diesel generators within one hour of declaring a' diesel generator in- i operable (if not a scheduled outage) and at. least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. I 1

1 1.3 . Demonstrating operability of remaining AC sources.and that the ' diesel 1

generators are aligned to provide standby power Lo the a6sociated shut--

'down boards.

t 1.4 Verifying.' operability any time a Diesel has been declared inoperable and l

. C' '{

the maintence that was preformed has'no Post m.sintence requirement in the-

., maintence Instruction.

. 2.0 . REQUIREMENTS (Tech Specs)

{

2.1 The diesel starts from ambient condition and accelerates to at least 900 rps in'5 10 seconds. The generator voltage and frequency sha!! be be-tween 6210 and 7590 volts and 58.8 and 61.2 Hz within 10 seconds after g manual start. (SR-4.8.1.1.2.a.4) 3- 2.2 Determine AC sources operab!c by verifying correct breaker alignments.-

(SR-4.8.1.1.1.a)-

0 3.0 PRECAUTIONS

.g.

3.1 Do not operate engine without crankcase vent open.

3.2 Do not operate engine with > 205 F. high Jacket water temperature.

3.3 Do not operate engine above cranking speed with < 30 lb. lube oil . pressure. I 3.4 To prevent damage to exciter-regulator field,-do not operate the generator system at speeds 5 850 RPM for extended periods of time with exciter regulator in operation. -

3.5 Operate the unit-local parallel switches in parallel position when synchro- ~

nizing to the electrical system.  ;

3.6 CO2 fire protection system should be in service for each D/C roes.

~

3.7 Never isolate D/G on SD board during testing. In the event of a safety injection signal, ESF equipment would start and overload the diesel. ~

l 1

e o

j. O

SQNp 51-7.1 - Unit 0

p. sac 2 of 2 Mcv. 4 3.9- lit the event of a crankranc hi . preneurc t rip IN) Niff at t empt to restart until a thorough therkout has been pcsformed by msantcuanrc.

'p Af ter a t rip ot the D/G f om high crankrame prennusc, DO NOT.open j

. top des k cover or handhole unt a l . the engine han s ooled for two l

~t hour > to prevent the ponn 1++1 4y of an explonion irom hot osI

& vapote.

1t- .l.10 Haintain D/G per 801-82.1C (82.2C),(82.3C) or (82.4C) while diesel'is A_ running.

4.0 -INSTRUCTIONS 4.1 Cumplet e weckly Elcrt r ar.s t Dist ra hut ion Check nhcet (SI ~)). Data Sheet 1.1. .s ' t .a t t .schril) .

C' 4.2 Hanually start carh dicact generator to be proven operahic per Data Sheet

, 7.1.li (three required).

.m 4.3 Af ter a 5 minute run stop the diesel generator per D.sta Sheet 7.1.b.

~

3:

O O

O C7 . -

O em L_

  • SQNP-

.'a-t .

st.7,1 t! nit 0 llata F.ackage Cover Slicci Page I of I Rev. 4 l DIESEL. GENERATOR VERIFICATION OF OPERAHil.lTY WITil ONE l>lESEl, OUT or SERVICE Unit' _ _ . Node _,

DIESEL GEN 1RATOR Otti' 0F Sr.RVICE Pcs t,uisw d Ity , _ , , . _ , . _,_,,_ , , , , , _ . _ , , _ , . 1). ate /T6mc Hearted /

it'd,' AtJO, ASr ).

D.at c/Tinw' Completed __/-

1.ist of data sheets attached:

' Instruction No. No. of

' flat.s Sheet No. Pages

. p -- Did all SI' data meet acceptance critert.i? Yes _ No O 11 following:

criters.: scre not.satastfed, notely the shift cugincir who completes the

  • 0-Was a Potential Reportable occurrance initiated? Yes No

,,,,,4 Was.a limiting condition for operation violated? .!

-Yes texplain in rcm.irkh) No (explain in remarks) l Verified By i

__ Date

~4 SMO Ti*' i O, Reason for test:

y Required by schedule - i Maintenance complete on (Instruction ':

1

.C: Another system ( )

) inoperable

.O - Plant condition (explain) .j Other texplain) l O ......

Review and Approval of Test _Results SHO.

t Date STA Date i Plant Services Coordinator Date .

FQE Staff Date Remarks: .

_.-WW.*uih> w Aussee m _aests. --

e 44uhGh.-

+ Sol 6 f a y ~ .,-

k'.~

.. 1 1 2 I ,

t - '

4 .

x - , E s

c s

u u

  • E B E s *
  • ~ 2 t t t *
3 r r r
  • 4 p S 3

]-

C3 N

3 S

t a

S t

a at

  • f S
  • . 6 1

D i

8 1

8 1

J 9

1 - 4

- 2 B

- 2 -

O

_ n. 1 34

_ ca ii t r

=

- j 2 2 2 C1 9

(

_ ce ut ri t r

- C N 4 2

2 1

C D

sc 1 2 n

i e 5

1 4 2 7

'oa t f n c .

5 1

6 1 5 OY-8 1

1 p 2 4 e

2.

3 a cc 7 9

9 4

9 9

9 9

9 5

9 9

9' 9

3 9

9

  • E I

8 2

l S

I SOY S

I er eo 4 Sf 1 A

_ 21 -

Y

_ A2 22 i . 9 7 2 C1 8 g 5 ' ) 1 D

  • 7 7 y 7 7 y 2 8 A g A 8 g 1 .

A _

2 1, 2 2 2 6 1 1 1 f F 6 1 I I s A.

1

  • i0 .

7 t I  ; O .

it nef j- -- _

2N ,

f ._

Ueo 0

. h 3 _ 1

61. r1 Z.

, ~

O _

P7 ae. .

. 6N vt gv .

oI aae sSPPR C' ,

1 1 f( 4 4 9 ^

O g

2

_ 2 8'

'r

^ .-

4"

.1 1 7 1

Q 0 ^

5 . 0 -

1

. D I

2p . 4 B 0

2" ) _

. 2 1 B4 90r M[- f(

1 1 1 4 _

0 1 2

C1 D

2 -

1 1

7 3 )

C 1 9 5

% 7 4 0 4 _ 4 I

2 6 )

9 9 9 9 2 2 i

5 7 7

/ .

1 1 1

(

,( '

8 2 4 8

1 4

6 1

B

'7 1

1 lg 1 (/

I C1 4 n N .

1 A e

c p

~ . 1 A2 d

e i

b l

a d O

e -

1 2

1 1 1 C1 D

9 /.

s i -

v a n.

r ~ j 1

1 i v a A 1 r A T "

I

- 2 r r 2 601-r C '. 1 1 e e e N4 5 2 J k k k 1 I a a a 1 1 s.

,e e 4 _

e 1 s

' r r r d

' E B B E

. . v 0c

. X 0i 9 nJ

lIflfl fl lf 8' l ll g\lI! -

h SQNP S1-7.1 - Unit 0 Data Sheet 7.1.B Page I of 2 Hev. O  !

Dienct Generator I Date , _ , _ _ _ _ _ Rx. Opr. Hode  !

___ 1 NOTE:

Check out two calibrated stop watches f rom the tool room for this test. I Stop watch calibration dec date Stop watch calibration duc date . , _ , _ _ CSSC No. _

__ CSSC No.

i

1. Manually start the dicsci generator:

a.

Check unit-local parallcl switch in unit position on 0-N-26.

b. _ ____ Place synchronizing switch to on position.

tq. NOTE:

While starting D/G verify voltage, frequency and 4 speed are within limits within 10 sec. (with stopwatches).

'O c.

Place start-stop hand switch on 0-H-26 to start position.

d.

Verify diesel starts from ambient condition and accele-rates to at ! cast 900 rpm in 5 10 sec.

43 c.

Verify frequency between 58.8 and 61.2 Ilz $ 10 sec.

O' f.

Verify voltage between 6210 and 7590 volts 5 10 sec.

g.

C3 Verify on 0-H-27, ERCW valve 1-FCV-67-66 opens (for lA-A) 1-FCV-67-67 opens (for IB-B)

C3 - 2-FCV-67-66 opens (for 2A-A) 2-FCV-67-67 opens (for 2B-B)

CD 2.

Af ter 5 minutes of operation stop the diesel generator. ' ' ' '

a.

Verify or adjust frequency to 60 llz and voltage to 6.9 kv prior te stopping D/G. ,

b.

Stop diesel generator by use of start-stop hand switch.

NOTE:

D/G running alarm will c! car below 850 RPH also red light goes -

out and green light comes on as indicated on 0-H-26 above !. 'G mimic. When speed decreases below 550 RPH, the field will be ~

removed and the generator voltage will zero. The synchron ming switch 2-HS-54-47 vill have to be turned on to see this them turned off. The diesel will go to idle speed and run for 10 minutes then shut down. Operator at diesel building shoult verify this sequence.

O

l i

SQNP SI-7.1 -~ Unit 0 11ata Shect-7.1.B i

'Page 2 of 2 Hev. 5

'l Date .

Ex Opr.LHode _ _ _ . . _

' 2. Continued

'c. Verify > 250 gal, fuel oil in. day tank, engine I

.. gals.

d. ' Verify > 250 gal, fuel oil in day tank, engine 2 gals. i
c. Verify > 62,000 gal. (4.7 ft.) fuel oil in 7 day .!

tank- ft.

'C-

f. Verify the dicscl generator in. standby mode per its .;

respective S01. (501-82.1, 82.2, 82.3, and 82.4) 4.

  • n j I

Acceptance Criteria: Each of the above requir---ats met, i