ML20237J556

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to First 10-yr Inservice Insp Program & First 10-yr Augmented Inservice Insp Program,Clarifying Info Per 870327 & 0708 Telcons
ML20237J556
Person / Time
Site: Limerick Constellation icon.png
Issue date: 08/11/1987
From: Kowalski S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML20237J557 List:
References
NUDOCS 8708180232
Download: ML20237J556 (2)


Text

.-

PHILADELPHIA A ' ELECTRIC COMPANY 2301 M ARKET STREET -

P.O BOX 8699 PHILADELPHIA A PA.19101 (215) 841-4 5o 2 S. J. KOW ALSKl e

ViCE PRESIDENT gg Mr. Walter R. Butler, Director Docket No.:. 50-352 BWR Project Directorate No,l+

Division of BWR Licensing ll U.S. Nuclear Regulatory Conmission Washington, DC 20555'

Subject:

Limerick Generating Station Unit 1 First 10-Year Interval Inservice Inspection Programs

References:

(1) Telecon between B. Turovlin et. al. (NRC) to C. A. Mengers.et. al. (PECo), dated March 27, 1987 l

-(2) Telecon between R. J. Clark et. al. (NRC) to C. A. Mengers et. al. (PECo),. dated July 8, 1987 Attachments:

1.

Limerick Generating Station Unit 1 and Conmon Plant First 10-Year Interval Inservice Inspection Program, Rev. 3 1

2.

Limerick Generating Station Unit 1 and Comon Plant First 10-Year Interval Augmented Inservice Inspection Program, Rev. 3.

Flies:

GOVT 1-1 (NRC)

GEN 5-1 (P-500)

Dear Mr. Butler:

'J The reference (1) and (2) telecons requested clarification of l

1 certain Information to support the NRC Staff's review of the Inservice and Augmented Inservice Inspection Programs for the first I

10-year interval of operation of Limerick Generating Station Unit 1.

The attachments to this letter provide the requested clarifications in the form of Revision 3 of the Inservice and Augmented Inservice inspection Programs. Each attachment consists of only the affected l

pages which have beun changed to reflect the requested clarifications.

l The changes are' indicated by the rev3sion bars in the left margin on each page and the revised List of Effective Pages for the appropriate Program sections. An instruction page is included for updating Revision 2 of each ISI Program to Revision 3.

f l

1' I

8708180232 870811 PDR ADOCK 05000352 PDR

's L

\\

l

)

Pursuant to 10CFR50.55a(g)C5), the information provided in the Inservice and Augnented Inservice Inspection Prograns nay be updated 1

concurrent with the performance of inservice examinations and we are proceeding with this understanding. We trust that, with this submittal of these doctnents, Operating License Condition 2.C.7 is satisfled and that your approval will be forthcoming.

Should additional information be required, please do not j

hesitate to contact us.

Sincerely,

,, f t J.7* t;~aA r.

DLS/pdO8048704 Attachments Copy to:

W. T. Russell, Regional Administrator USNRC Region I G. Kelly, Lirerick Generating Station Unit 1 Resident inspector

____