UNITED STATES f-NUCLEAR REGULATORY COMMISSION g
E WASHINGTON, D C. 29 55
(
/
July 23, 1987 Docket No. 50-338 l
MEMORANDUM FOR:
T. Murley*
J. Partlow R. Capra W. Troskoski j
J. Sniezek*
F. Congel W. Butler F. Miraglia*
J. Roe V. Nerses R. Starostecki* S. Black
- J. Stolz S. Varga*
- 8. Boger*
E. Adensam D. Crutchfield* G. Lainas*
L. Rubenstein L. Shao*
F. Schroder B. J. Youngblood MC.!Rossi*D G. Holahan A. Thadani J. Richardson W. Lanning R. Cooper k
THRU:
Lester S. Rubenstein Director Project Directorate II-2 Division of Reactor Projects-I/II FROM:
Leon B. Engle, Project Manager Project Directorate II-2 Division of Reactor Projects-l/II
SUBJECT:
NORTH ANNA UNIT 1 STEAM GENERATOR TUBE RUPTURE l
As of 10:00 a.m., July 22, 1987, the licensee is initiating an inspection progran to EC all three SG's A B, C on the cold leg side. EC testing has 1g-already commenced on the hot leg side of SG "C" to meet TS. The licensee is considering removing the tube with the circumferential break for non-destructive /
destructive testing, if possible.
l l
The AIT team, licensee and Westinghouse met on 7/22/87 to discuss EC techniques and SG probes.
l A meeting between the staff and VEPC0 is tentatively scheduled to be held at 10:00 a.m. on July 29, 1987, at the North Anna Site to discuss the results of the licensee's inspection and follow-up actions to be taken by the licensee,
$ St h $ {w f
Y' D
eon B. Engle, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II l