ML20237H401

From kanterella
Jump to navigation Jump to search
Amends 30 & 21 to Licenses NPF-35 & NPF-52,respectively, Revising Tech Specs to Add Two Containment Penetration Conductor Overcurrent Protective Devices to Table 3.8.1A & Table 3.8.1B,respectively
ML20237H401
Person / Time
Site: Catawba  
Issue date: 08/18/1987
From: Youngblood B
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20237H402 List:
References
NUDOCS 8708250005
Download: ML20237H401 (13)


Text

-

t

~9,,

UNITED STATES 8'

NUCLEAR REGUL ATORY COMMISSION '

n

p WASHINGTON, D. C. 20555

\\...../

DUKE POWER COMPANY i

, NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE, INC.

i DOCKET NO. 50-413 l

CATAWBA NUCLEAR STATION, UNIT 1 l

AMENDMENT TO FACILITY OPERATING LICENSE l

l Amendment No. 30 1

License No. NPF-35 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the-Duke Power Company acting for itself, North Carolina Electric Membership)

Corporation and Saluda River Electric Cooperative, Inc., (licensees dated November 17, 1986, and supplemented July 1, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in confonnity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public;-

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-35 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in-Appendix A, as revised through Amendment No. 30, and the Environmental Protection Plan 8708250005 070818 PDR ADOCK 05000413:

P PDR

e

' contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

@\\

B. J. Youngblood, Director Project Directorate II-3 Division of Reactor Projects-I/II

Attachment:

Technical Specification Changes Date of Issuance: August 18, 1987

)

l l

n

/

XA)

G r

MD0nd,a}n:macPDIL-3DRP-I/II PDII-3/DRP-I/II Q-) Bet escal PDI P-I/II (1 RiLuh BJYo'n blood KJabbour 07/3D /87 07/ 3 ; /87

/ g /8 Op } /87 356 YllW

N e

p o

UNITED STATES p-i NUCLEAR REGULATORY COMMISSION lt WASHINGTON, D. C. 20555 s

i

%,...../

DUKE POWER COMPANY NORTH CAROLINA MUNICIPAL POWER AGENCY N0. 1 PIEDM0NT MUNICIPAL P0WER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 21 License No. NPF-52 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 2 (the facility) Facility Operating License No. NPF-52 filed by the Duke Power Company acting for itself, North Carolina Munici No.1 and Piedmont Municipal Power Agency, (licensees) pal Power Agency dated November 17, 1986, and supplemented July 1,1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and i

i the Comission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; j

D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-52 is hereby amended to read as follows:

1 (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 21, and the Environmental Protection Plan l

J contained in Appendix B, both of which are attached he:eto, are hereby incorporated into this license.

Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION x6\\

B. J. Youngblood, Director Project Directorate II-3 l

Division of Reactor Projects-I/II

Attachment:

Technical Specification Changes Date of Issuance: August 18, 1987 PDI kDRP-I/II PDII DR -I/II OG-Betbsa PDI

-l/II MDu, an:mac KJabbour yJt JPl B

ungblood 07/.70/87 07/3)/87

[f 3 /87

'/87 DSH V//r(Y?

4 ATTACHMENT TO LICENSE AMENDMENT NO. 30 FACILITY OPERATING LICENSE NO. NPF-35 DOCKET NO. 50-413 AND TO LICENSE AMENDMENT NO. 21 FACILITY OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and j

contain vertical lines indicating the areas of change. The corresponding overleaf pages are also provided to, maintain document completeness.

Amended Overleaf 1

Page Page i

3/4 8-35 3/4 8-36 l

3/4 8-37 3/4 8-38 3/4 8-58 3/4 8-57 3/4 8-60 3/4 8-59 l

l l

l 1

I

TABLE 3.8-1A (Continued)

UNIT 1 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES l

l DEVICE NUMBER & LOCATION SYSTEM POWERED 2.

600 VAC MCC (Continued) 1MXR-F01B Primary Bkr Incore Instrument Room Ventila-l Backup Fuse tion Unit 1B Fan Motor 1MXR-F02B Primary Bkr Control Rod Drive Vent Backup Fuse Fan Motor 10

)

l l

1MXR-F03A Primary Bkr Lower Containment Ventilation j

Backup Fuse Unit 10 Fan Motor i

l 1MXR-F04C i

Primary Bkr Upper Containment Ventilation

)

Backup Fuse Unit 1D Fan Motor 1MXY-F02A l

Primary Bkr NC Pump 1A Oil Lift Pump Motor 1 Backup Fuse 1MXY-F02B Primary Bkr NC Pump ID Oil Lift Pump Motor 1 l

Backup Fuse 1MXY-F02C l

Primary Bkr Reactor Building Lower Containment Backup Fuse Welding Machine Receptacle IRCPL0185 l

IMXY-F02D Primary Bkr Upper Containment Reactor Building Backup Fuse Welding Receptacle IRCPL0193 1MXY-F03A Primary Bkr Reactor Coolant Drain Tank Pump l

Backup Fuse Motor IA 1MXY-F030 l

Prima"y Bkr Ice Condenser Refrigeration l

Backup Fuse Floor Cool Pump Motor 1A-1MXY-F05A Primary Bkr Lighting Transformer Backup Fuse ILR8 1MXY-F05B Primary Bkr Lighting Transformer Backup Fuse ILR11 CATAWBA - UNITS 1 & 2 3/4 8-35 Amendment No.30(Unit 1)

Amendment No.21(Unit 2) l l

4 l

TABLE 3.8-1A (Continued) f UNIT 1 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER & LOCATION SYSTEM POWERED 2.

600 VAC MCC (Continued)

IMXY-F05C l

Primary Bkr Lighting Transformer

)

Backup Fuse ILR14 1MXY-F06A Primary Bkr -

Ice Condenser. Air Handling Backup Fuse Unit 1A5 Fan Motor,A & B l

1MXY-F06B Primary Bkr Ice Condenser Air Handling Backup Fuse Unit 1All Fan Motor A & B 1MXY-F06C Primary Bkr Ice Condenser Air Handling i

Backup Fuse Unit 1812 Fan Motor A & B 1MXY-F050 r*

l Primary Bkr Ice Condenser Air Handling l

Backup Fuse Unit 1A15 Fan Motor A & B 1MXY-F08A 1

Primary Bkr Incore Drive Assembly Backup Fuse Motor 1A 1MXY-F08B Primary Bkr Incore Drive Assembly Backup Fuse Motor 1C l

IMXY-F08C l

Primary Bkr Incore Drive Assembly l

Backup Fuse Motor IE 1MXY-F08D Primary Bkr Lower Containment Auxiliary Backup Fuse Charcoal Filter Unit Fan Motor 1A 1MXZ-F02A Primary Bkr NC Pump 1A 011 Lift Pump Backup Fute Motor 2 IMXZ-F02B Primary Bkr NC Pump 10 Oil Lift Pump Backup Fuse Motor 2 CATAWBA ' UNITS 1 & 2 3/4'8-36

)

1 I

TABLE 3.8-1A (Continued) l UNIT 1 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER & LOCATION SYSTEM POWERED 2.

600 VAC MCC (Continued) 1MXZ-F03A Primary Bkr Reactor Coolant Drain Tank Backup Fuse Pump Motor 1B 1MXZ-F04B Primary Bkr Lighting Transformer ILR1 Backup Fuse l

1MXZ-F04C Primary Bkr Lighting Transformer ILR2 Backup Fuse l

1MXZ-F04D i

Primary Bkr Lighting Transformer ILR3

-l Backup Fuse 1MXZ-F05A I

l Primary Bkr Reactor Coolant Pump Jib l

Backup Fuse Hoist No. R019 TH R022 i

1MXZ-F05C l

Primary Bkr Lower Containment Auxiliary Backup Fuse Charcoal Filter Unit Fan Motor IB 1MXZ-F06A Primary Bkr Incore Drive Assembly Motor 1B Backup Fuse IMXZ-F06B Primary Bkr Incore Drive Assembly Motor ID l

Backup Fuse l'

1MXZ-F06C l

Primary Bkr Incore Drive Assembly Motor IF Backup Fuse 1MXZ-F06D Lower Containment Reactor Building Primary Bkr Welding Receptacle IRCPL0194 Backup Fuse 1MXZ-F07B Primary Bkr Lighting Transformer ILR4 Backup Fuse 1MXZ-F07C Primary Bkr 5 Ton Jib Crane in Containment Backup Fuse Crane No. R005 CATAWOA - UNITS 1 & 2 3/4 8-37 Amendment No.30(Unit 1)

Amendment No.21(Unit 2) l

_J

e TABLE'3.8-1A (Continued) l i

UNIT 1 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES i

DEVICE NUMBER & LOCATION SYSTEM POWERED 1

)

2.

600 VAC MCC (Continued)

IMXZ-F07D Primary Bkr Reactor Cavity Manipulator Backup Fuse Crane No.'R007'& R027

]

1MXZ-F08A Primary Bkr

' Steam Generator Drain Pump Backup Fuse Motor'1 1MXZ-F08C Primary Bkr 15 Ton Equipment Access Hatch Backup Fuse Hoist Crane No. R009 1MXZ-F08D Primary Bkr Control Rod Drive 2 Ton Jib Backup Fuse Hoist Crane No.'R017 1MXZ-F08E Primary Bkr Reactor. Side Fuel Handling

( f, j

Backup Fuse Control Console SMXG-F01C Primary Bkr Standby Makeup Pump Drain Isol Backup fuse Viv 1NV876 SMXG-F05C Primary Bkr Pressurizer ~ Heaters 28, 55 & 56 Backup Fuse SMXG-F06A Primary Bkr Standby Makeup Pump to Seal Backup Fuse Water Line Isol Viv INV877 3.

600 VAC Pressurizer Heater Power Panels PHP1A-F01A Primary Bkr-Pressurizer Heaters Backup Fuse 1, 2, & 22 PHP1A-F01B Primary Bkr Pressurizer Heaters Backup Fuse 5, 6, & 27 CATAWBA - UNITS l'& 2-3/4 8-38 j

4 TABLE 3.8-1B (Continued)

^!

UNIT 2 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES 4

DEVICE NUMBER & LOCATION SYSTEM POWERED 2.

600 VAC MCC (Continued) l 2MXP-F028

. Control Rod Drive Vent 1

Primary Bkr Bac'kup Fuse Fan Motor 2B-2MXP-F03A Primary Bkr Lower Containment Ventilation-1 Backup Fuse Unit 2B Fan Motor

. I 2MXP-F04C l

l Primary Bkr Upper Containment.. Ventilation i

Backup Fuse Unit 2B Fan Motor.

i 2MXP-F05C Primary Bkr Containment Pipe Tunnel Backup Fuse Booster Fan Motor 2B.

j 2MXQ-F01A 4-Primary Bkr Upper Containment Return Backup Fuse Air Fan Motor 2A 2MXQ-F01B l

Primary Bkr Incore Instrument Room Verti-Backup Fuse lation Unit 2A Fan Motor 2MXQ-F028 Primary Bkr Control Rod Drive Vent Fan-Backup Fuse Motor 2C 2MXQ-F03A Primary Bkr Lower Containment Ventilation Backup Fuse Unit 2A Fan Motor 2MXQ-F04C Primary Bkr Upper Containment Ventilation Backup Fuse Unit 2A Fan Motor 2MXR-F01A Primary Bkr Upper Containment Return Air.

Backup Fuse Fan Motor 2D U

CATAWBA - UNITS 1 & 2 3/4 8-57 9

k l'

TABLE 3.8-18'(Continued)

UNIT 2 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER & LOCATION SYSTEM POWERED

)

2.

600 VAC MCC (Continued) 2MXR-F01B Primary Bkr Incore Instrument Room Ventila-Backup Fuse tion Unit 28 Fan Motor 2MXR-F02B Primary Bkr Control Rod Drive Vent Beckup Fuse Fan Motor 20 2MXR-F03A Prirrary Bkr Lower Containment Ventilation Backup Fuse Unit 2D Fan Motor

.2MXR-F04C Primary Bkr Upper Containment Ventilation Backup. Fuse Unit 20 Fan Motor 2MXY-F02A Primary Bkr NC Pump 2A Oil Lift Pump Motor 1 Backup Fuse 2MXY-F028 Primary Bkr NC Pump 2D 011 Lift Pump Motor 1 Backup Fuse

-1 2MXY-F02C l

Primary Bkr Reactor Building Lower Containment Backup Fuse.

Welding Machine Receptacle 2RCPLO185 2MXY-F02D Upper Containment Reactor Building Primary Bkr

' Welding Receptacle 2RCPL0193 Backup Fuse l

2MXY-F03A Primary Bkr Res: tor Coolant Drain Tank Pump Backup Fuse Motor 2A l

2MXY-F03D

' Primary Bkr Ice Condenser Refrigeration l

Backup Fuse Floor Cool Pump Motor 2A i

i j

2MXY-F05A Primary Bkr Lighting Transformer L

Backup Fuse 2LR8 i'

l 2MXY-F05B Primary Bkr Lighting Transformer Backun Fuse 2LR11 CATAWBA - UNITS 1 & 2 3/4 8-58 Amendment No. 3C(Unit 1)

Amendment No. 23(Unit 2)'

1 1

TABLE 3.8-1B (Continued)

I UNIT 2 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER & LOCATION SYSTEM POWERED 2.

600 VAC MCC (Continued) 2MXY-F05C Primary Bkr Lighting Transformer Backup Fuse 2LR14 2MXY-F06A Primary Bkr Ice Condenser Air Har.dling Backup Fuse Unit 2A5 Fan Motor A & B 2MXY-F06B Primary Bkr Ica Condenser Air Handling Backup Fuse Unit 2A11 Fan Motor A & B 2MXY-F06C Primary Bkr Ice Condenser Air Handling Backup Fuse Unit 2B12 Fan Motor A & B 2MXY-F06D Primary Bkr Ice Condenser Air Handling Backup Fuse Unit 2A15 Fan Motor A & B 2MXY-F07C Primary Bkr EXH Reactor Building Equipment Backup Fuse Hatch Jib Cranes R035 & R036 2MXY-F08A Primary Bkr Incore Drive Assembly Backup Fuse Motor 2A 2MXY-F0BB Primary Bkr Incore Drive Assembly Backup Fuse Motor 2C 2MXY-F08C Primary Bkr Incore Drive Assembly Backup Fuse Motor 2E 2MXY-F08D l

Primary Bkr Lower Containment Auxiliary Backup Fuse Charcoal Fi?ter Unit Fan Motor 2A 2MXZ-F02A Primary Bkr NC Pump 2A Oil Lift Pump

{

Backup Fuse Motor 2 CATAWBA - UNITS 1 & 2 3/4 8-59 l

c-

~

i 1

)

9 TABLE 3.8-1BA (Continued)

UNIT 2 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER & LOCATION SYSTEM POWERED 2.

600 VAC MCC (Continued) 2MXZ-F02B Primary Bkr NC Pump 20 Oil Lift Pump Backup Fuse Motor 2 2MXZ-F03A Primary Bkr Reactor Coolant Drain Tank Backup Fuse Pump Motor 2B 2MXZ-F04B Primary Bkr Lighting Transformer 2LR1 Backup Fuse 2MXZ-F04C Primary Bkr Lighting Transformer 2LR2 l

Backup Fuse 2MXZ-F04D Primary Bkr Lighting Transformer 2LR3 Backup Fuse 2MXZ-F05A Primary Bkr Reactcr Coolant Pump Jib Backup Fuse Hoist No. R023 TH R026 2MXZ-F05C Primary Bkr Lower Containment Auxiliary i

Backup Fuse Charcoal Filter Unit Fan Motor 2B 2MXZ-F06A Primary Bkr Incore Drive Assembly Motor 2B Backup Fuse 2MXZ-F06B Primary Bkr Incore Drive Assembly Motor 2D Backup Fuse 2MXZ-F060 Lower Containment Reactor Building Primary Bkr Welding Receptacle 2RCPL0194 Backup Fuse 2MXZ-F06C Primary Bkr Incore Drive Assembly Motor 2F Eackup Fuse 2MXZ-F07B Primary Bkr Lighting Transformer 2LR4 Backup Fuse CATAWBA - UNITS 1 & 2 3/4 8-60 Amendment No.30(Unit 1)

Amendment No.21(Unit 2) a j