Text
_ _ - _
i M0tTIELY 0 PIRATING REIVRT - JULY 1987 l
At the_ beginning of the report period, Oyster Creek was oprating at maximum load, 633 We.
On July 1,
power wa s reduced to 512 We to repla_e the brushes on a recirculation pump motor generator set.
Power was st.osequently returned to maximum load.
On July 9 while operating at 622 MWe, a
feedwater regulating valve malfunctioned causing a feedwater transient and subsequent reactor feed pump trip.
Power was reduced to 433 We to repair the feedwater regulating valve and to evaluate seal leaks.
The reactor feed pump was returned to service on July 11 and power was increased to 540 We.
On July 11, power was reduced to 294 We to replace a belt on a trunnion room cooling fan.
Between July 12 and 15, power was maintained between 515 and 578 We due to the environmental limit on discharge canal temperatures.
On July 15 power was increased to approximately 610 We, limited by the second stage reheaters being removed from service to support repairs to two (2) steam leaks in the condenser bay.
Repairs were completed on July 17 and the plant was returned to maximum load.
Plant load was again - reduced on several occasions due to the environmental limit on discharge canal temperatures.
On July 26, power was reduced to 400 We to stabilize reactor building closed cooling water temperature when a service water pump tripped.
Following seal repairs, the pump was returned to service and power was increased to 630 We by July 27.
On July 30, the reactor scrammed on high pressure when an air supply valve manifold f ailed, causing a main steam isolation valve to close.
A reactor cool down was in progress at the end of the report period.
1887j I
B709030234 B70731 1
PDR ADOCK 05000219 l
t l
R PDR l
Oyster Creek Station #1
[.
Docket No. 50-219
(
REFUELING INFORMATION - JULY, 1987 Name of Facility: Oyster Creek Station #1
\\;
. Scheduled date for next refueling shutdown: N/A Scheduled date for restart following refueling:
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Scheduled date(s) for submitting proposed licensing action and supporting information:
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
- 1. General Electric Fuel Assemblies - fuel design and performance analysis methods have been approved by the NRC.
J
- 2. Exxon Fuel Assemblies - no major changes have been made nor are there any anticipated.
The number of fuel assemblies (a) in the core 560
=
(b) in the spent fuel storage pool = 1392 20 (c) in dry storage
=
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
2600 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Reracking of the fuel pool is in progress. Six (6) out of ten (10) racks have been installed to date. When reracking is completed, discharge capacity to the spent fuel pool will be available until 1994 refueling outage.
1619B
I' OPERATING DATA REPORT OPERATING STATUS l
f
- 1.
IX)CKET:
50-219 i
2.
REPORTING PERIOD:
JULY, 1987 1
3.
UTILITY CONTACT:
JOHN 11. SEDAR, JR.
609-971-4698 4.
LICENSED TIIERMAL POWER (MWt):
1930 5.
NN4EPLATE RATING (GROSS We):
687.5 X 0.8 = 550 6.
DESIGN ELECTRICAL RATING (NET MWe):
650 7.
MAXIhDI DEPENDABLE CAPACITY (GROSS We):
650 8.
MAXIMthi DEPENDABLE CAPACITY (NET MWe):
620 9.
IF CilANGES OCCUR AB0VE SINCE LAST REPORT, GIVE REASONS:
NONE 10.
POWER LEVEL TO WilICH RESTRICTED, IF ANY (NET MWe):
N/A
- 11. REASON FOR RESTRICTION, IF ANY:
NONE MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HRS 744.0 5087.0 154320.0
- 13. liOURS RX CRITICAL 70LO 3785.8 98622.3 14.
RX RESERVE SHTDWN IRS 0.0 0.0 918.2
- 15. l IRS GENERATOR ON-LINE 701.0 3662.3 96032.3
- 16. (Tr RESERVE SHTDWN HRS 0.0 0.0 1208.6 17.
GROSS THERM ENER (MWil) 1248000 6437304 159393689
- 18. GROSS ELEC ENER (MWH) 405920 2153510 53821755 19.
NET ELEC ENER (MWil) 390102 2063212 51673289
- 20. UT SERVICE FACTOR 94.2 72.0 62.2 21.
lTT AVAIL FACTOR 94.2 72.0 63.0
- 23. Ur CAP FACTOR (DER NET) 80.7 62.4 51.5
- 24. UT FORCED OUTAGE RATE 5.8 28.0 11.2 25.
FORCED OUTAGE IRS 43.0 1424.7 12076.5
- 26. SlIUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):
N/A 27.
IF CURRENTLY SIRITDOWN ESTIMATED STARTUP TIME:
August 5,1987 1965B
r AVERAGE 7AILY POWER LEVEL NET MWe DOCKET #........
50-219 l'
UNIT.......... 0YSTER CREEK #1 1
REPORT DATE....... AUGUST 4, 1987
(
COMPILED BY....... JOHN H. SEDAR, JR.
TELEPHONE #......
609-971-4698 4
i.
\\
MONTH JULY, 1987 DAY MW DAY MW 1.
602 16.
593 2.
555 17.
598 3.
607 18, 613 4.
602 19.
613 5.
598 20.
581 6.
601 21.
581 7.
611 22.
586 8.
606 23.
559 9.
446 24.
498 10, 414 25.
503 11.
393 26.
493 12.
519 27.
575 l
13.
539 28, 582 14.
517 29.
598 15, 563 30.
116 31.
0 1968B
g7 ra Mu ai G
8 i n r
cp E
uu 0T s
R 9
1 n0 qx 2
A U
a4 eo 3 e 4 e N
9 t r6 rr h
0 r
(
a4 p
ot 5 u e
e 1
hB e
pp t
Ns s
si e
a l
2 a
n s
nt nF c
1 t
R9 pf N
1 ra ioa e i
7 u
eo Vem tc u
D i. lc )t 05g o
o F t S pr S
f 1 E.
u or e
e d
l M
c e
r v
c o1 ti n
en 0 e ts ts nf(
m c
e eo 4b on noi o
MTBN u
t e
tt t
ts tr S
a O.EEYE r tor fi 5
t ao r
I e
- a e r
r e p N AA D !
Co ou ai nur i
O on c rc
- v el Gah n
e 1
e T N D PSI i
t t
t El iR e
E td rr i so b r yt b
K T T P
& tct
)
E E c e fd lbt ipr n1 i
C N L L e An a r I
e6 h
c h
tnv1 x
I r
s e
x O U P E u
v e
ne r
a EfEE0 E
o D
t T a
r r r oh i.e e
3 C
P e
it a
r O
w t
e C
"C o ce fse 4
5 p
uc ooh dan lt f d el a ec o i r pf r
d c
e uoe drm lts s a s r%
a c
i u
o 5
ooo ata l
a4 I tB Fic S
N m
O
. a )n r
I
," 3, mci T
l a
C 7
aSl U
8 cgpUu cp rcix D
9 StaE 1
E
- l l m (r a a dua oe R
y onnt h R
l ha a ut
,iO e b b A. O t l l E
u W
J
@gn i - -
hl 234 i
O P
D g
3 N
iT A
N 0
e S
l e
N a
t s
t n r W
T n e o e
v p n
O R
ic E e o
D O
L R
ta I
P i
U E
n l
I i
I d
n S
a T
o3& ego x
I m
E N
5g6 A
A
)
/
/
3 in e
)
U s
e in w
g3e N
N lp c
lp a
n a
x nU E
o x
(t i
E luT ic&
g ;; 5 A
A A
s t
(
re e g
s r n u
i f tsi r) a o e nein t ivEi F
I e
ai a
EgE 7
9 tnn yTat llp r
c a
r r nx gor ts 3
3 e a iel a ntioE 5
nnnt tai a r
$3$
i oi
(
5 4
- ninu us nr e pt el o uif ge e eh s qa c e pd pt c
4I ROAOO 1 t aE
- - - - - I
,g *-
F F
F t
AlCDF.FGI l
I 2
7 7
7 8
8 e
t 8
/
/
a
/
1 0
D 9
1 3
d
/
/
/
le 7
7 p3 5 '
_q m a ed d u i$
8 e c e c
r h o
c
~. ;,
F S
)
o 1
2 3
U FS N
6 6
6
/9 1
(
l
GPU Nuclear Corporation L
g gf Post Office Box 388 Route 9 South Forked River.New Jersey 06731-0388 l
609 971-4000 l
Writer's Direct Dial Number:
August 14, 1987 f c of Management Information l
U.S. Nuclear Regulatory Commission l
Washington, DC 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 j
Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.
If you should have any questions, please contact Mr. Joseph D. Kowalski, Oyster Creek Licensing Manager at (609)971-4643.
Very truly yours,
/Lbl g
)
e M 4 &a&T
- Vice President and Director Oyster Creek
' PBF:KB:dmd(0841 A)
Enclosures cc: Director (10)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l
Mr. Alexander W. Dromerick, Project Manager U.S. Nuclear Regulatory Commissian Division of Reactor Projects I/II 7920 Norfolk Avenue, Phillips Bldg.
Bethesda, MD 20014 NRC Resident Inspector 4
l Oyster Creek Nuclear Generating Station
,/ V 3
I l
I GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation