l Dunn PowEn Gom%NY P.O. ISOX 331110 C11AHLOTTE, N.O. 28242 I
IIAL IL TUCKER TELEPIIONE vmsPnesterwr (704) 373-4531 WU(1 LEAR PRODt!(TION l
l l
August 14, 1987 I
U. S. Nuclear Regulatory Commission
- l l
Attention: Document Control Desk Washington, D. C. 20555
Subject:
Catawba Nuclear Station, Unit 2 Docket No. 50-414 Third Update to Startup Report Gentlemen:
o In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical Specifications, please find attached the third quarterly update to the Unit 2 Startup Report. As indicated on my May 14, 1987 letter to NRC, some tests are not yet complete. Additional quarterly updates to the Startup Report will be submitted as required by Technical Specifications.
Very truly yours, h
4 Hal B. Tucker JGT/104/sbn Attachment xc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station f
[I l
8708240331 870814 a
PDR ADOCK 05000414 p
PDR p
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _