ML20237H008

From kanterella
Jump to navigation Jump to search
Forwards Third Quarterly Update to Startup Test Rept,Per Tech Spec Section 6.9.1.3.Some Tests Still Incomplete.Addl Quarterly Updates Will Be Submitted as Required by Tech Specs
ML20237H008
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 08/14/1987
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237H011 List:
References
NUDOCS 8708240331
Download: ML20237H008 (1)


Text

--

l 6

l I

l Dunn PowEn Gom%NY P.O. ISOX 331110 C11AHLOTTE, N.O. 28242 I

IIAL IL TUCKER TELEPIIONE vmsPnesterwr (704) 373-4531 WU(1 LEAR PRODt!(TION l

l l

August 14, 1987 I

U. S. Nuclear Regulatory Commission

l l

Attention: Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Third Update to Startup Report Gentlemen:

o In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical Specifications, please find attached the third quarterly update to the Unit 2 Startup Report. As indicated on my May 14, 1987 letter to NRC, some tests are not yet complete. Additional quarterly updates to the Startup Report will be submitted as required by Technical Specifications.

Very truly yours, h

4 Hal B. Tucker JGT/104/sbn Attachment xc: