Text
___
~
((' ) y, UNITED STATES
+
',g NUCLEAR REGULATORY COMMISSION g
j WASHINGTON, D. C. 20555
}
%....+/
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO.112 TO FACILITY OPERATING LICENSE NO DPR-66 DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY BEAVER VALLEY POWER STATION, UNIT NO. 1 DOCKET NO. 50-334
1.0 INTRODUCTION
The Technical Specifications for Beaver Valley Unit 2 were developed based on those for Unit 1.
In the process, the staff and the licensee discovered errors and needs for clarification in the Unit 1 Technical Specifications.
By letter dated April 29, 1987, the licensee submitted a request for amendment to address corrections that are editorial in nature.
2.0 DISCUSSION AND EVALUATION The licensee's requested changes, and the staff's evaluation of them, are as follows:
1.
Page 6.13, add Administrative Control Section 6.8.5 to incorporate license condition 2.C(6) for implementation of the secondary water cherristry monitoring program. This will allow the elimination of license condition 2.C(6).
In addition, Section 6.8.4, which was incorporated by Amendment No. 105, but inadvertently deleted by Amendment No.110, is being reimposed.
2.
Page B 2-1, Section 2.1.1 Reactor Core, add "R-Grid" following "W-3" to clarify the correlation used for DNB analysis. This is a clarification and affects only the basis of a requirement.
3.
- Page 2.6, Table 2.2-1 item 12, correct an editorial error by adding an
- to apply the note " Design flow is 88,500 gpm per loop."
4 Page 3/4 0-1, Specification 3.0.1, correct an editorial error by capitalizing the "L"
in " limiting".
5.
Page 3/41-7 Specification 3.1.2.1.a and b, correct an editorial error by revising the referenced specifications "3.1.2.7a" and "3.1.2.7b" to "3.1.2.7.a" and "3.1.2.7.b", respectively.
6.
Page 3/41-11, Surveillance Requirement 4.1.2.3.3.c, correct an editorial error by capitalizing "0PERARLE".
B708240120 870814 DR ADOCK 0500 4
4
,, 7.
Page 3/4 1-13, Specification 3.1.2.5 and associated Action statement, correct an editorial error by revising the referenced specification "3.1.2.la" to 3.1.2.1.a".
8.
Page 3/4 1-14, Specification 3.1.2.6, correct an editorial error by revising the referenced specification "3.1.2.2a" to "3.1.2.2.a".
9.
Page 3/4 2-2, Specification 3.2.1 Action statement b, correct an editorial error by revising the referenced Action "2.a) 1)" to Action "a.2.a) 1)".
- 10. Page 3/4 3-21, Table 3.3-3 Action 18, correct an editorial error by capitalizing " COLD SHUTDOWN".
- 11. Page 3/4 3-27, Table 3.3-5 item 6.a. provide clarification of this function by adding a note "(a bove P-9)" since a reactor trip on turbine trip is enabled above the P-9 permissive setpoint.
- 12. Pages 3/4 3-56, Table 3.3-12; 3/4 3-63 and 3/4 3-64, Table 3.3-13, e
correct an editorial error by changing the heading " TABLE NOTATION" to
" ACTION STATEMENTS".
- 13. Pages 3/4 4-23, 3/4 4-26, and B 3/4 4-10, correct an editorial error by changing Table "4.a-3" to "4.4-5".
14 Page 3/4 7-15, revise surveillance requirement 4.7.6.1.b to clarify required operator actions when the Ohio River water level reaches 690 ft msl.
- 15. Page 3/4 9-12. Specification 3.9.12 and Page 3/4 9-13, Specification 3.9.13; correct an editorial error by changing the statements to lower case letters.
- 16. Page B 2-7, correct an editorial error by changing the sign "5" to "t".
- 17. Page B 3/4 0-1, Specification 3.0.4, correct an editorial error by changing " insure" to " ensure".
l
- 18. Page B 3/4 0-3 Specification 4.0.1, correct an editorial error by changing " insure" to " ensure".
l
- 19. Page B 3/41-2, Specification 3/4.1.1.5, correct an editorial error by l
20 Page B 3/4 2-2, Specification 3/4.2.1, for clarity change "50% & 90% &
15% & 50%" to "50% and 90% and between 15% and 50%".
- 21. Page B 3/4 4-2a, Specification 3/4.4.5, correct an editorial error by changing " Operating plant" to " Operating plants".
- 22. Page B 3/4 4-3, Specification 3/4.4.6.2, correct an editorial error by changing " rupture as under" to " rupture or under".
T I 23. Page B 3/4 5-1, Specification 3/4.5.2 and 3/4.5.3, correct an editorial error by changing " ensures" to " ensure".
24 Page B 3/4 7-5, Specification 3/4.7.9, correct an editorial error by changing "10 CFR 79.39(c)" to "10 CFR 70.39(c)".
- 25. Page B 3/4 9-3, Specification 3/4.9.12 and 3/4.9.13, add additional clarification of the fuel building area ventilation system and supplemental leakage collection and release system (SLCRS) functions.
All of the above changes are acceptable.
3.0 ENVIRONMENTAL CONSIDERATION
This amendment involves changes which are administrative in nature in that they correct errors and serve to improve and clarify certain sections.
Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared 1
in connection with the issuance of this amendment.
4.0 CONCLUSION
We have concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Dated: August 14, 1987 Principal Contributor:
Peter Tam, Project Manager 6.-_______. _. _ _ _ -. _ _ _ _ _ _. _ _. _