ML20237F919
| ML20237F919 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/28/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20237F922 | List: |
| References | |
| NUDOCS 8709020032 | |
| Download: ML20237F919 (2) | |
See also: IR 05000498/1987027
Text
- _ _ - _ _ _
l
l
(
1
1
AUG 2 81987
,
In Reply Refer To:
Dockets:
50-498/87-27
50-499/87-27
Houston Lighting & Power Company
ATTN:
J. H. Goldberg
Group Vice President, Nuclear
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. R. G. Taylor, J. E. Bess,
J. I. Tapia, L. D. Gilbert, G. A. Pick, other personnel of this office, and NRC
consultants during the period April 20 through June 26, 1987, of the activities
authorized by NRC Construction Permits CPPR-128 and CPPR-129, for the South
Texas Project, Units 1 and 2, and to the discussion of our findings with
Mr. J. Westermier and other members of your staff during the course and at the
conclusion of the inspection.
Area examined during the inspection included licensee action on previous
inspection findings; followup on licensee action on IE Bulletins and Circulars;
followup on licensee reported significant construction deficiencies; followup
on licensee action in regard to Part 21 reports; and the "as-built" inspection
in the area of electrical, structural, and piping systems.
Within these areas,
the inspection consisted of selective examination of procedures and
l
!
l
representative records, interviews with personnel, and observations by the NRC
l
inspectors and consultants.
The inspection findings are documented in the
l
enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
You were notified of two such violations by our
letter dated June 22, 1987, to which no additional response is required.
You
are required to respond to the violation enclosed with this letter, in writing,
in accordance with the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should
l
be based on the specifics contained in the Notice of Violation enclosed with
l
this letter.
The response directed by this letter and the accompanying Notice is not subject
l
to the clearance procedures of the Office of Management and Budget as required
l
by the Paperwork Reduction Act of 1980, PL 96-511.
Pd
rih 4
C: P
C: RPB
RG3Tylor/cjg
JEBess
G,1, Constable
JEGagli r /
o
(/95787
8/)q/87
%/p/87
J/97/
0\\
9
8709020032 870828
l
ADOCK 0500
8
.
O
g .\\
_ - _ _ - _ _ _ _
!
lA
'
i
'
Houston Lighting & Power Company
-2-
.s
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Orldnal Signed By
J. E. Gag!!ardo
J. E. Gagliardo, Chief
l
Reactor Projects Branch.
j
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/87-27
50-499/87-27
cc w/ enclosures:
I
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houstoa Lighting & Power Company
l
ATTN: Gerald ::. Vaughn, Vice President
'
Nuclear Operations
,
'
P. O. Box 1700
Houston, Texas
77001
Texas Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI-0PS
R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
RPSB
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, 0GC
l
- R. G. Taylor, RPB/C
- RSB
1
l
- Project Inspector, RPB
- R. Hall
- P. Kadambi, NRR Project Manager
- J.
Bess
'
- J. Tapia
- L. Gilbert
- G. Pick
- w/766
_ _ _ - _ _ _ _ _ _ _ _