-Decembar 26 1987 ;
l'r. W. S. Wilgus
. DISTRIBUTION Vice President - Nuclear Operations.
Docket FfTe~
D. Miller.
Florida Power Corporation
.NRC 4 Local PDRs-J. Schiffgens.
ATTN: l'anager, Nuclear Licensing PD22 Reading.
..H.- Silver P.O.-Box 219
~T. Murley/J. SniezekOGC-Bethesda Crystal River, Florida' 32629
.F. Miraglia.
E. Jordan C. Rossi J..Partlow
Dear Mr. Wilgus:
S. Varga-T.-Barnhart (4)
G. Lainas:
ACRS (10)
SUBJECT:
CRYSTAL RIVER UNIT 3 - CLARIFICATION OF GPA/PA HYDR 0 STATIC 1ES1' REQUIREMENTS (TAC NO. 66612)
Gray File-By letter dated November 9, 1987, Florida Power Corporation (FPC) requested clarification of the hydrostatic test requirements'(!UA-5000) of the 1980' Edition, through Winter 1981 Addenda, of Section XI of the ASME Doiler and Pressure Vessel Code as applied to a modification of the letdown system at Crystal River Unit 3.
Specifically, this applies to the pressure ~ test (IWA-4000) of a single weld in the makeup system. The hydrostatic test required for the upstream weld of the valve, MUV-497, ccnflicts with plant Technical Specification (TS) 3.4.9.1, in that the hydrostatic test requires
. raising RCS pressure above 500 psig when the RCS tunperature is below 200 degrees F.
According to the Noveniber 9, 1987 letter, FPC proposes to perform the test of-this weld during Mode 3, above 500 degrees F at 2200 psig. The test would be perforned with insulation on the system and with a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> homing tire; the weld is accessible since radiation levels and temperatures are'not prohibitive during Mo6e 3.
FPC bases the proposed test plan on IWA-5214(d) of tha Winter 1980 Addenda of Section XI.
We have reviewcd FPC's proposed test and conclude that it is consistent with the NRC staff's interpretation of IWA-5?.14(d) of the Winter 1980 Addenda of Section XI; i.e., that, when the system hydrostatic test imposes system condi-tions which conflict with limitations' included in the plant Technical Specifi-cations, a system inservice test (IWA-5211(c)) at nominal operating temperature is acceptable in lieu of the hydrostatic test.
Sincerely.
Original signed by Herbert N. Berkow.. Director Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulatien cc: See next page 3l?1
{2l Y l
l 7
t 22/
PE PH 22 D */l E.i b
,lsr JS i fgens
.HL11ver heerk'ow C eg r)/87
,12
/87 12/,M187 12/ n/87 12/4/87 12/ /87 8712290462 871224 PDR ADOCK 05000302 P
Mr. W. S. Wilgus Florida Power Corporation-Crystal River linit No. 3 Nuclear Ger,erating Plant Cc:
Mr. R. W. Neiser Senior Vice President State Planning and Development-and General Coursel Clearinghouse Florida Power Corporation Office of Planning and Budget P. C. Box 14042 Executive.0ffice of the Governor-St. Petersburg, Florida -33733
'The Capitol Building Tallahassee,. Florida 32301 Mr. P. F. McKee Director, Nuclear Plant Operations Mr. F. Alex Griffin,-Chairman Florida Power Corporation Board of County Commissioners P. O. Box 219 Citrus Ceunty Crystc1 River, Florida 32629 110 North-Inverness,Apopka Avenue Florida 36250 Mr. Robert D. Borsum Babcock 8 Wilecx Mr. E. C. Simpson Nuclear Power Generation Division Director, Nuclear Site 1700 Rockville Pike, Suite 525 Florida Power Corporation Support Rockville,- fiaryland 20952 P.O.. Box 219 Crystal River, Florida 32629' Resident Inspector U.S. Nuclear Regulatory Comrission-15760 West Powerline Street Crystal River, Florida 37629 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
{
Tallahassee, Florida 32399-0700 i
Administrator
'I Departrent of Environtrental Regulation Power Plant Siting Sectier, State of Florida 2600 Elair Stone Rcad i
Tallahassee, Florida 32301 i
Attorney General Departrent of Legal Affairs k
The Capitol Tallahassee, Florida 32304 l
j
-