ML20237D179
| ML20237D179 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/11/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20237D181 | List: |
| References | |
| NUDOCS 8712230096 | |
| Download: ML20237D179 (2) | |
See also: IR 05000324/1987031
Text
- _ _ _ _ _ _ . _ _ _ _ _ .
0
,
y
December 11, 1987
Docket Nos. 50-324, 50-325
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-325/87-32 AND 50-324/87-31)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. A. Belisle on September 14 - September 18, 1987, and September 28 - October 2,
1987.
The inspection included a review of activities authorized for your
Brunswick facility.
At tha conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed
inspection report.
The inspection was a comprehensive examination of your management and quality
assurance controls related to licensed activities.
The inspection was conducted
in selected key areas of responsibility at the plant site.
Areas examined
during the inspection and our findings are discussed in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and direct
observations by the inspector.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In addition to the need for corrective action regarding the specific matters
identified in the enclosed Notice, we are concerned about the implementation of
your management control systems, including budget constraints, related to the
engineering support staff and their evaluating and resolving plant identified
problems promptly, and the quality assurance program that failed to identify
this situation.
Consequently, your response should describe those particular
actions taken or planned to improve the effectiveness of your programs in these
areas.
8712230096 871211
ADOCK 05000324
h,
0
,
I
lul
- . . . - .
___ _ ______
. _ _ _ _ _ _
,
..
-
s
%
Carolina Power and Light Company
2
December 11,.1987
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(original signed by J. N. Grace)
J. Nelson Grace
Regional Administrator
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
bcc w/encls:
T. Conlon, DRS-
J. Blake, DRS
NRC Resident Inspector
Document Control Desk
State of North Carolina
_
RII
RII([
'
RIIM ;i7/
RLI
RIppt;'q>./'
flLL
ga
C
.jf
c>m m
.jp .
RGibbs:tj
RMoore
BBreslau
MShannon ABelisle CJ ul.i an
11/)S/87
11/t6/87
11/G/87
1U/8/87
11//f/87 11//j /87
[h
h
RI
RII
RII
RII
RI
R
'
AGib on
PFrerdric kson
DVerrelli
LReyes f
t
JGrace
(
11g0/87
11/f/87
11/1]/87
lir/f /87 11/3/87 11/ /87
oh31
J
Qff
f
<
Gl&d
l
/1/ 2 / 29
1L-_____________