ML20237C774

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-331/98-09 on 980610-0729.No Violations Noted.Insp Noted Operation Shift Managers Conservative & Critical Approach in Controlling Maint & Survelillance Testing Activities
ML20237C774
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/19/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20237C776 List:
References
50-331-98-09, 50-331-98-9, NUDOCS 9808240161
Download: ML20237C774 (2)


See also: IR 05000331/1998009

Text

.* .

August 19, 1998

Mr. John F. Franz, Jr.

~/ ice President, Nuclear

A'!iant Tower

200 First Street SE

P. O. Box 351

Cedar Rapids, IA 52406-0351

SUBJECT: DUANE ARNOLD INSPECTION REPORT 50-331/98009(DRP)

Dear Mr. Franz:

On July 29,1998, the NRC completed a routine safety inspection at your Duane Amold Energy

Center (DAEC) facility. The enclosed report presents the results of that inspection.

During this 7-week inspection period, your conduct of activities at the DAEC facility was

characterized by safety conscious operations, in particular, we noted the operation shift

managers conservative and critical approach in controlling maintenance and surveillance testing

activities. However, several recent examples of weaknesses in personnel performance were

identified during this inspection, including two personnel performance problems that resulted in

the initiation of half scrams. While the consequences of each of the personnel performance

problems during this inspection report period were minor, the number occurring is of concem,

particularly in light of the personnel performance problems identified during the first half of the

spring 1998 refueling outage.

'In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

'

/s/Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Dodet No.: 50-331

License No.: DPR-49

Enclosure: Inspection Report

50-331/98009(DRP)

cc w/ encl: E. Protsch, Executive Vice President

Energy Delivery Alliant;

President, IES Utilities, fr.c. i

G. Van Middlesworth, Plant Manager  !

K. Peveler, Manager, Regulatory Performance

Chairperson, Iowa Utilities Board

l

DOCUMENT NAME: G:\DUAN\DUA98009.DRP

v. e.e . . c. ., th4. ec t. wient. $n the b c - cw viewt .et.cw.nci r - copy with .tt.ch/.nci si . ii. copy

j

OFFICE Rlli d Rlli

NAME RLanksburyM GGrant kh

DATE 08AU98 08$98hb

9008240161 980819 OFFICIAL RECORD COPY

PDR ADOCK 05000331

L

9 PDR #

L_1--- _ ---- -

, . . _ .

J. Franz -2-

Distribution:

Project Mgr., NRR w/ encl

J. Caldwell, Rlli w/enci

C. Pederson, Rlli w/enci

B. Clayton, Rllt w/enct

SRI Duane Amold w/enci

DRP w/ encl

TSS w/enci

DRS (2) w/enci

Rill PRR w/enci

- PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail) ,

1

.

.

<

l

!

)

a

L'40007

l

l

t

L__ _ _ _ . _ _ _ _