DEC 101987
In Reply Refer To:
Docket:
50-267/87-30
Public Service Company of Colorado
ATTN: Robert 0. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
1
Denver., Colorado 80211
Gentlemen:
This refers to the inspection conducted by Mr. C. A. Hackney of this office
during the period November 2-6, 1987, of activities authorized by NRC Operating
License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to the
discussion of our findings with you and members of your staff at the conclusion
of the inspection,
j
Areas examined during the inspection included operational status of the
emergency preparedness program, notifications and communications, public
information, and licensee audits. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector. The inspection findings
are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
The enclosed report identifies two deficiencies in your emergency preparedness
program observed during this inspection.
It is requested that within 30 days
after the receipt of this letter you provide this office with a schedule for
correcting these deficiencies.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Or131 rut 1 Signed By
A. B. Beach
for
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
(see next page)
RIV:EPS M 4
C:NMEPBk
C:PS/h
D:DR
CHackney:df
WFisher
TWesterman
LJCaIkn
'
/ > / f/87
lg/f/87
p/$/87
12/3/87
8712150324 871210
9gol
ADOCK 05000267
a
von
,
_ _ _ _ _ _ _ - _ .
_ _ _ _
Public Service Company of Colorado
-2-
'
Enclosure:
Appendix - NRC Inspection Report
50-267/87-30
i
cc w/ enclosure:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
j
16805 WCR 191
.
Platteville, Colorado
80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Manager, Quality
i
Assurance Division
(same address)
Dr. F. Shoemaker, Education Specialist
j
FEMA Region 8
i
Denver Federal Center, Bldg. 710
P.O. Box 25267
Denver, Colorado
80225-0267
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bec to DMB (IE35)
bec distrib. by RIV:
- DRP/B
- DRP
- RRI
R. D. Martin, RA
- Section Chief, DRP/B
- Project Engineer, DRP/B
- TSS
- L. Shea, RM/ALF
,
- MIS System
- RSTS Operator
)
- K. Heitner, NRR Project Manager
- RIV File
I
- DRS
- R. Hall
1
NMEPB
- Inspector (s)
- W., L. Fisher
R. L. Bangart
4
D. B. Matthews, NRR
D. Powers
- w/766
_ _ _ _ _.
_ - _ _ _ _ - _ _ _ _ _ _____