ML20237A599
| ML20237A599 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/10/1987 |
| From: | Johnson I COMMONWEALTH EDISON CO. |
| To: | Murley T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20237A601 | List: |
| References | |
| 3963K, GL-84-11, NUDOCS 8712150122 | |
| Download: ML20237A599 (2) | |
Text
___ _ _ _ _ _______________
[ b h[Lt(h N C:mm:nwsdth Edison C N Ons First National Plaza. Chicago, Illinois
\\
Oi Address Riply to: Post Office Box 767 Chicago, Illinois 60690 0767 J
December 10, 1987 i
l Mr. Thomas E. Murley, Director Office of Nuclear Reactor-Regulation.
U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Unit 1
" Fall 1987 Inspection of Piping Susceptible to Interoranular Stress Corrosion Cracking (IGSCC) -
1 Generic Letter 84-11" NRC Docket No. 50-254 Reference (1): Letter from I.M. Johnson to T.E. Murley, dated June 1, 1987
~
(2):
Letter from I.M. Johnson to T.E. Murley, dated November 26, 1987
Dear Mr. Murley:
In reference letter (1) Commonwealth Edison submitted its plan for the inspection of piping which is susceptible to'Intergranular Stress corrosion Cracking (IGSCC) pursuant to the requirements of Generic Letter 84-11.
During the inspection and subsequent evaluation, we transmitted an interim status report via reference (2).
We are now transmitting our final report detailing the results of the Quad Cities Unit 1 augmented piping inspection. This. report provides a description of flaws found as well as the analytical and repair actions taken during the Fall 1987 refueling outage. The following two attachments are provided:
1.
Summary Report Regarding Ultrasonic Examination. Performed During the Fall 1987 Refueling Outage - Quad Cities Unit 1 This attachment is a summary of the augmented stainless steel ultrasonic examination performed during the Fall 1987 refueling outage and results and actions for weldments which have been reported as flawed from previous and present outages.
2.
Evaluation and Disposition of Flaws at Quad Cit'ies Nuclear Power.
Plant, Unit 1 (1987 Outage), Prepared for:
Commonwealth Edison Company, Prepared by: NUTECH Engineers This. report summarizes analyses performed by NUTECH Engineers to evaluate flaw indications, including criteria employed in the analysis.
/
8712150122 g71210-.
lLY(
PDR ADOCK 05000254 L
\\
PDR fj
T.E. Murley December: 10, 1987 Unit 1 is currently scheduled to restart in mid-December. We request the review of this material in the time frame which would support this projected return to service.
Please direct any questions you may have regarding this matter to this office.
Very yours,.
f l
g 'f.
Y&f?<]C A
I. M. Johnson Nuclear Licensing Administrator l
l Attachments l
l cc:
T. Ross - NRR A. B. Davis - NRC Region III Quad Cities Resident Inspector l
i l
l l
l i
l l
l l
l l
l l
3963K
]
J