ML20237A242

From kanterella
Jump to navigation Jump to search

Discusses Withdrawal of Request for Reduction in Intergranular Stress Corrosion Cracking Insp Frequency for GL-88-01, Catergory D Welds
ML20237A242
Person / Time
Site: Pilgrim
Issue date: 08/11/1998
From: Wang A
NRC (Affiliation Not Assigned)
To: Olivier L
BOSTON EDISON CO.
References
GL-88-01, GL-88-1, TAC-M90688, NUDOCS 9808130202
Download: ML20237A242 (3)


Text

. - _ _.

August 11, 1998 i..  %.

l i

~

Mr. Leon J. Olivier .3 Vice President - Nuclear / Station Director

' Boston Edison Company, Pilgrim Nuclear Power Station'.

RFD #1 Rocky Hill Road Plymouth, MA'02360 I'

l

SUBJECT:

WITHDRAWAL OF REQUEST FOR REDUCTION IN INTERGRANULAR l- STRESS CORROSION CRACKING (IGSCC) INSPECTION FREQUENCY FOR  ;

[ GENERIC LETTER (GL) 88-01 CATEGORY D WELDS (TAC NO. M90688)

L

Dear Mr. Olivier:

. ,By letter dated October 13,1994, Boston Edison Company (BECo) requested a reduction in the L intergranular stress corrosion cracking inspection frequency for Category D welds. By letter dated July 30,1998, BECo has withdrawn this request as the information provided in that
j. s request has been superseded by NRC Safety Evaluation Report on NEDC-31951P and Supplement 1 to BWR Owner's Group Topical Report NEDC-31951P. BECo plans to resubmit.,

this request at a later date using current information.

If you have any questions or comments, please contact me at (301) 415-1445.

l j Sincerely, L /S/

~

Alan B. Wang, Project Manager L. Project Directorate 1-3 l Division of Reactor Projects - 1/il l* .

Office of Nuclear Reactor Regulation L' Docket No. 50-293 l-cc: See next page f l

DISTRIBUTION:

[O !(

r-

! Docket File - PDR PDl-3 R/F O l TClark AWang OGC ACRS WKoo KWichman l

CCowgill, RGN I Jzwolinski l DOCUMENT NAME: G:\ PILGRIM \M90688.WD  !

I T* seenive e osy r of this document indsets in the hos: "C" = Copy without ettechment/ enclosure 'E' = Copy with attechment/ enclosure 'N' = No copy l c 0FFICE- PM:PDI-3 LA:PDI-3 ,, (> , D:PJI-3 AJ 1 NAME- AWang \Wr> TClark3 6(' ,- EfhynasF l DATE- 08/h /98 08////98 08/// /98 08/ /98 I

0FFICIAL RECORD COPY m so gg gE tdism'MTQ $$ib i 9808130202 980811 "'

PDR ADOCK 05000293 <

P PDR I

_______________________a

cpY'E O '4 UNITED STATES j

e j NUCLEAR REGULATORY COMMISSION WA%'HINGToN, D.C. 20646c001 o

y August 11, 1998 Mr. Leon J. Olivier Vice President - Nudear/ Station Director Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

WITHDRAWAL OF REQUEST FOR REDUCTION IN INTERGRANULAR STRESS CORROSION CRACKING (IGSCC) INSPECTION FREQUENCY FOR GENERIC LETTER (GL) 88-01 CATEGORY D WELDS (TAC NO. M90688)

Dear Mr. Olivier:

By letter dated October 13,1994, Boston Edison Company (BECo) requested a reduction in the intergranular stress corrosion cracking inspection frequency for Category D welds. By letter dated July 30,1998, BECo has withdrawn this request as the information provided in that request has been superseded by NRC Safety Evaluation Report on NEDC-31951P and Supplement 1 to BWR Owner's Group Topical Report NEDC-31951P. BECo plans to resubmit this request at a later date using current information.

If you have any questions or comments, please contact me at (301) 415-1445.

Sincerely, vu lv u Alan B. Wang, Project Manager Project Directorate 1-3 Division of Reactor Projects -l/ll Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page

Mr. Leon J. Olivi:r Goston Edison Comp ny Pilgrim Nucl r Pow r Station cc:

Mr. Ron Ledgett Ms. Nancy Desmond Executive Vice President Manager, Reg. Affairs Dept.

800 Boyleston Street Pilgrim Nuclear Power Station Boston, MA 02199 RFD #1 Rocky Hill Road Plymouth, MA 02360 Resident inspector U. S. Nuclear Regulatory Commission Mr. David F. Tarantino Pilgrim Nuclear Power Station Nuclear Information Manager Post Office Box 867 Pilgrim Nuclear Power Station Plymouth, MA 02360 RFD #1, Rocky Hill Road Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Ms. Kathleen M. O'Toole Plymouth, MA 02360 Secretary of Public Safety i Executive Office of Public Safety l Chairman, Duxbury Board of Selectmen One Ashburton Place (

Town Hall Boston, MA 02108 878 Tremont Street

)

Duxbury, MA 02332 Mr. Peter LaPorte, Director Attn: James Muckerheide Office of the Commissioner Massachusetts Emergency Management Massachusetts Department of Agency Environmental Protection 400 Worcester Road One Winter Street P.O. Box 1496 Boston, MA 02108 Framingham, MA 01701-0317  ;

1 Office of the Attomey General One Ashburton Place Chairman, Citizens Urging )

Responsible Energy l 20th Floor P.O. Box 2621 Boston, MA 02108 Duxbury, MA 02331 1

Mr. Robert M. Hallisey, Director Citizens at Risk )

Radiation Control Program P.O. Box 3803 l Massachusetts Department of Plyuouth, MA 02361 Public Health 305 South Street W.S. Stowe, Esquire Boston, MA 02130 Boston Edison Company 800 Boyleston St.,36th Floor Regional Administrator, Region i Boston, MA 02199 U. S. Nuclear Regulatory Commission 475 Allendale Road Chairman .

King of Prussia, PA 19406 Nuclear Matters Committee I Town Hall i Ms. Jane Fleming 11 Lincoln Street l 8 Oceanwood Drive Plymouth, MA 02360 Duxbury, MA 0233

! Mr. William D. Meinert Mr. Jeffery Keene Nuclear Engineer Licensing Division Manager Massachusetts Municipal Wholesale Boston Edison Company Electric Company l 600 Rocky Hill Road P.O. Box 426 l Plymouth, MA 02360-5599 Ludlow, MA 01056-0426