Proposed Tech Specs 3.2.3 Re Nuclear Enthalpy Hot Channel Factor & 4.2.2.2 Re Radial Peaking Factor
ML20236X973
Person / Time
Site: Beaver Valley
Issue date: 09/22/1978
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20236X976 List:
References
TAC-10837, NUDOCS 8712100459
Download: ML20236X973 (2)


Text

__

PROPOSED REVISION POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued)

~

1 1

b) At least once per 31 EFPD, whichever occurs first.

2.

When the F C is less than or equal to the FRTP limit for theappropbatemeasuredcoreplane,additi!nalpower C

distribution maps shall be taken and F compared to F[fP andFhatleastonceper31EFPD x

e.

The F limits for RATED THERMAL POWEP.within specific core xy planes shall be:

i Fhf11.71forallcoreplanescontainingbank"D" 1.

control rods and/or any part length rods, and 2.

For unrodded core plane:

Fxy 1 1.68 up to 2.4 ft. elevation, Fxy 1 1.75 from 2.4 ft. elevation up to 7.8 ft. elevation, Fxy 1 1.63 above 7.8 ft. elevation f.

The F limits of e, above, are not applicable in the following xy core plane regions as measured in percent of core height from the bottom of the fuel:

1.

Lower core region from 0 to 15%, inclusive.

2.

Upper core regicn from 85 to 100% inclusive.

3.

hid ru.ne regions at 17.8 1 2%, 32.1 1 2%,

46.3 3 2%, 60.6 1 2% and 74.9 1 2%, inclusive.

4.

Core plane regions within i 2% of core height (1 2.88 inches) about the bank demand position of the bank "D" or part length control rods.

C exceedingFh:

g.

With Fx 1.

The F (Z) limit shall be reduced at least 1% for each q

exceedsFh,AND 1% F x

xy 2.

The effects of F on F (Z) shall be evaluated to determine ifF(Z)iswithbitskimit.

q 4.2.2.3 When Fq(Z) is measured pursuant to Specification 4.10.2.2, an overall measured Fq(Z) shall be obtained from a power distribution map and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty.

l B""8712100459 780922 3/4 2-6a nmtn_m"1 PDR ADOCK 05000334 P

PDR

(

~

PROPOSED REVISION POWER DISTRIBUTION' LIMITS NUCLEARENTHALPYHOTChANNELFACTOR-dH LIMITING CONDITION FOR 0PERATION 3.2.3 NH shall be limited by the following relationship:

FfH 1 1.5355 [1.0 + 0.2 (1-P)]

, p, THERMAL POWER RATED THERMAL POWER APPLICABILITY: MODE 1 ACTION:

N Where F exceeding its a~

t:

j AH a.

Reduce THERMAL POWER to less than 50% of RATED TPJ.RyAL POWER WITHIN 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to 1 55% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, I

Demonstrate thru in-core mapping that F is within its limit b.

within24hoursafterexceedingthelimkH 1

t or reduce THERMAL j

POWER to less than 5% of RATED THERMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and I

Identify and correct the cause of the out of limit condition c.

prior to increasing THERMAL POWER; subsequent POWER OPERATION l

y may proceed provided that RAH is demonstrated through in-core l

mapping to be within its limit at a nominal 50% of RATED THERMAL POWER prior to exceeding this THERMAL POWER, at a nominal 75%

RATED THERMAL POWER prior to exceeding this THERMAL power and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 95% or gre.ater RATED THERMAL

)

POWER.

)